13 resultados para Three-phase lines
em Universidad Politécnica de Madrid
Resumo:
An EMI filter for a three-phase buck-type medium power pulse-width modulation rectifier is designed. This filter considers differential mode noise and complies with MIL-STD- 461E for the frequency range of 10kHz to 10MHz. In industrial applications, the frequency range of the standard starts at 150kHz and the designer typically uses a switching frequency of 28kHz because the fifth harmonic is out of the range. This approach is not valid for aircraft applications. In order to design the switching frequency in aircraft applications, the power losses in the semiconductors and the weight of the reactive components should be considered. The proposed design is based on a harmonic analysis of the rectifier input current and an analytical study of the input filter. The classical industrial design does not consider the inductive effect in the filter design because the grid frequency is 50/60Hz. However, in the aircraft applications, the grid frequency is 400Hz and the inductance cannot be neglected. The proposed design considers the inductance and the capacitance effect of the filter in order to obtain unitary power factor at full power. In the optimization process, several filters are designed for different switching frequencies of the converter. In addition, designs from single to five stages are considered. The power losses of the converter plus the EMI filter are estimated at these switching frequencies. Considering overall losses and minimal filter volume, the optimal switching frequency is selected
Resumo:
An EMI filter for a three-phase buck-type medium power pulse-width modulation rectifier is designed. This filter considers differential mode noise and complies with MIL-STD-461E for the frequency range of 10kHz to 10MHz. In industrial applications, the frequency range of the standard starts at 150kHz and the designer typically uses a switching frequency of 28kHz because the fifth harmonic is out of the range. This approach is not valid for aircraft applications. In order to design the switching frequency in aircraft applications, the power losses in the semiconductors and the weight of the reactive components should be considered. The proposed design is based on a harmonic analysis of the rectifier input current and an analytical study of the input filter. The classical industrial design does not consider the inductive effect in the filter design because the grid frequency is 50/60Hz. However, in the aircraft applications, the grid frequency is 400Hz and the inductance cannot be neglected. The proposed design considers the inductance and the capacitance effect of the filter in order to obtain unitary power factor at full power. In the optimization process, several filters are designed for different switching frequencies of the converter. In addition, designs from single to five stages are considered. The power losses of the converter plus the EMI filter are estimated at these switching frequencies. Considering overall losses and minimal filter volume, the optimal switching frequency is selected.
Resumo:
A three-phase transformer with flat conductor layers is proposed in this article. This arrangement is used for high current density transformers. Cost effectiveness in planar magnetic are related with the optimization in the number of layers in each winding. This fact takes more relevance for the medium and high power three-phase transformers where the number of parallels to achieve the required DCR is increased. The proposed method allows the use of off-the-shell core shapes that are used for single phase transformers. Cost impact is significant and design implications become more flexible. The proposed solution has been validated and compared using the conventional and the proposed methodologies to design a high power (20 kW) transformer.
Resumo:
Different possible input filter configurations for a modular three-phase PWM rectifier system consisting of three interleaved converter cells are studied. The system is designed for an aircraft application where MIL-STD-461E conducted EMI standards have to be met and system weight is a critical design issue. The importance of a LISN model on the simulated noise levels and the effect of interleaving and power unbalance between the different converter modules is discussed. The effect of the number of filter stages and the degree of distribution of the filter stages among the individual converter modules on the weight and losses of the input filter is studied and optimal filter structures are proposed.
Resumo:
A modified winding layout for three-phase transformers with PCB windings is proposed in this paper. This modified layout can be used in high current transformers with many PCB layers to simplify the fabrication process. One of the key factors that might increase the cost and complexity in the construction of planar transformers is the number of layers of each PCB winding. This issue becomes even more important in medium-high power three-phase transformers, where the number of PCB layers is higher. In addition to that, the proposed method allows the use of commercial core shapes that are commonly used to design single-phase transformers. This fact makes possible the reduction of cost and flexibility of the design solutions. The proposed solution has been validated and compared using the conventional and the proposed methodologies to design a high power (20 kW) transformer.
Resumo:
This paper presents an adaptive control for the auxiliary circuit, called ARCN (Auxiliary Resonant Commutating Network), used to achieve ZVS in full active bridge converters under a wide load range. Depending on the load conditions, the proposed control adapts the timing of the ARCN to minimize the losses. The principle of operation and implementation considerations are presented for a three phase full active bridge converter, proposing different methods to implement the control according to the specifications. The experimental results shown verify the proposed methodology.
Resumo:
Recently there has been an important increase in electric equipment, as well as, electric power demand in aircrafts applications. This prompts to the necessity of efficient, reliable, and low-weight converters, especially rectifiers from 115VAC to 270VDC because these voltages are used in power distribution. In order to obtain a high efficiency, in aircraft application where the derating in semiconductors is high, normally several semiconductors are used in parallel to decrease the conduction losses. However, this is in conflict with high reliability. To match both goals of high efficiency and reliability, this work proposes an interleaved multi-cell rectifier system, employing several converter cells in parallel instead of parallel-connected semiconductors. In this work a 10kW multi-cell isolated rectifier system has been designed where each cell is composed of a buck type rectifier and a full bridge DC-DC converter. The implemented system exhibits 91% of efficiency, high power density (10kW/10kg), low THD (2.5%), and n−1 fault tolerance which complies, with military aircraft standards.
Resumo:
The generator differential protection is one of the most important electrical protections of synchronous generator stator windings. Its operation principle is based on the comparison of the input current and output current at each phase winding. Unwanted trip commands are usually caused by CT saturation, wrong CT selection, or the fact that they may come from different manufacturers. In generators grounded through high impedance, only phase-to-phase or three-phase faults can be detected by the differential protection. This kind of fault causes differential current to flow in, at least, two phases of the winding. Several cases of unwanted trip commands caused by the appearance of differential current in only one phase of the generator have been reported. In this paper multi-phase criterion is proposed for generator differential protection algorithm when applied to high impedance grounded generators.
Resumo:
El origen del proyecto se encuentra en la mejora de un inversor trifásico sinusoidal comercial sobre la base del estudio de las técnicas de excitación óptimas para los IGBTs que lo componen en su etapa de potencia. En las primeras fases de planteamiento del proyecto se propone una idea mucho más ambiciosa, la realización de un nuevo convertidor de emergencia, destinado al sector ferroviario, para dar servicio de climatización. Este convertidor está formado por la asociación en cascada de un bloque DC/DC elevador y un bloque inversor DC/AC trifásico controlado mediante PWM con modulación sinusoidal. Se pretendía así dar solución a las siguientes problemáticas detectadas en los convertidores comercializados hasta el momento: un bloque elevador excesivamente sobredimensionado, subsistemas de control independientes para los dos bloques que configuran el convertidor, adicionalmente, la tarjeta driver se rediseña con cada cambio de especificaciones por parte de un nuevo cliente y finalmente, las comunicaciones tanto de diagnosis como de mantenimiento necesitaban una importante actualización. Inicialmente, se ha realizado un estudio teórico de los bloques elevador e inversor para poder realizar el diseño y dimensionamiento de sus componentes tanto semiconductores como electromagnéticos. Una vez completada la parte de potencia, se estudia el control que se realiza mediante medidas directas y simulación tanto de la estrategia de control del elevador como del inversor. Así se obtiene una información completa de la funcionalidad de las tarjetas existentes. Se desea realizar el diseño de una única tarjeta controladora y una única tarjeta de drivers para ambos bloques. Por problemas ajenos, en el transcurso de este proyecto se cancela su realización comercial, con lo que se decide al menos crear la placa de control y poder gobernar un convertidor ya existente, sustituyendo la tarjeta de control del bloque elevador. Para poder fabricar la placa de control se divide en dos tarjetas que irán conectadas en modo sándwich. En una tarjeta está el microcontrolador y en otra está todo el interface necesario para operar con el sistema: entradas y salidas digitales, entradas y salidas analógicas, comunicación CAN, y un pequeño DC/DC comercial que proporciona alimentación al prototipo. Se realiza un pequeño programa funcional para poder manejar el convertidor, el cual con una tensión de 110V DC, proporciona a la salida una tensión de 380V AC. Como ya se ha expuesto, debido a la cancelación del proyecto industrial no se profundiza más en su mejora y se decide proponerlo para su evaluación en su fase actual. ABSTRACT. The beginning of the project is found in the improvement of a commercial sine wave three phase inverter which is based in a study about optimal excitation techniques to IGBTs which compose in the power stage. In the early phases of project it is proposed a much more ambitious idea, the fact of a new emergency converter, proposed for the rail sector to work in an air condition unit. This converter is formed by an association of a block cascaded DC/DC booster and a block DC/AC inverter three-phase controlled by a sine wave modulation PWM. The purposed was to give a solution to following problems detected in commercial converters nowadays: an excessively oversized block boost, independent control subsystems for two blocks that configure the converter. In addition, driver board is redesigned with each specifications change demand it a new customer, and finally, the communications, diagnostic and maintenance that needed a important upgrade. Initially, it has been performed a theoretical study of boost and the inverter blocks to be able to perform the component’s design and the size (semiconductor and electromagnetic fields). Once finished power study, it is analysed the control performed using direct measures and simulation of boost control strategy and inverter. With this it is obtained complete information about existing cards functionality. The project is looking for the design of just one controller card and one drivers´ card for both blocks. By unrelated problems, during the course of this project a commercial realization. So at least its decided to create control board to be able to existing converter, replacing boost block’s control board. To be able to manufacture control board it is divided in two cards connected in sandwiching mode. In a card is microcontroller and in another is all needed interface to operate with the system: digital inputs and outputs, analogical inputs and outputs, CAN communication, and a small DC / DC business that provide power supply to the prototype. It is performed a small functional program to handle the converter, which with an input voltage 110V DC provides an output voltage 380V AC. As already has been exposed, due to industrial project cancellation it is decided no to continue with all improvements and directly to evaluate it in the current phase.
Resumo:
A Wearable Power System (WPS) is a portable power source utilized primarily to power the modern soldier’s electronic equipment. Such a system has to satisfy output power demands in the range of 20 W...200 W, specified as a 4-day mission profile and has a weight limit of 4 kg. To meet these demands, an optimization of a WPS, comprising an internal combustion (IC) engine, permanent magnetic three-phase electrical motor/generator, inverter, Li-batteries, DC-DC converters, and controller, is performed in this paper. The mechanical energy extracted from the fuel by IC engine is transferred to the generator that is used to recharge the battery and provide the power to the electrical output load. The main objectives are to select the engine, fuel and battery type, to match the weight of fuel and the number of battery cells, to find the optimal working point of engine and to minimize the system weight. To provide the second output voltage level of 14 VDC, a separate DC-DC converter is connected between the battery and the load, and optimized for the specified mission profile. A prototype of the WPS based on the optimization presented in the paper results in a total system weight of 3.9 kg and fulfils the mission profile.
Resumo:
Antecedentes: Esta investigación se enmarca principalmente en la replicación y secundariamente en la síntesis de experimentos en Ingeniería de Software (IS). Para poder replicar, es necesario disponer de todos los detalles del experimento original. Sin embargo, la descripción de los experimentos es habitualmente incompleta debido a la existencia de conocimiento tácito y a la existencia de otros problemas tales como: La carencia de un formato estándar de reporte, la inexistencia de herramientas que den soporte a la generación de reportes experimentales, etc. Esto provoca que no se pueda reproducir fielmente el experimento original. Esta problemática limita considerablemente la capacidad de los experimentadores para llevar a cabo replicaciones y por ende síntesis de experimentos. Objetivo: La investigación tiene como objetivo formalizar el proceso experimental en IS, de modo que facilite la comunicación de información entre experimentadores. Contexto: El presente trabajo de tesis doctoral ha sido desarrollado en el seno del Grupo de Investigación en Ingeniería del Software Empírica (GrISE) perteneciente a la Escuela Técnica Superior de Ingenieros Informáticos (ETSIINF) de la Universidad Politécnica de Madrid (UPM), como parte del proyecto TIN2011-23216 denominado “Tecnologías para la Replicación y Síntesis de Experimentos en Ingeniería de Software”, el cual es financiado por el Gobierno de España. El grupo GrISE cumple a la perfección con los requisitos necesarios (familia de experimentos establecida, con al menos tres líneas experimentales y una amplia experiencia en replicaciones (16 replicaciones hasta 2011 en la línea de técnicas de pruebas de software)) y ofrece las condiciones para que la investigación se lleve a cabo de la mejor manera, como por ejemplo, el acceso total a su información. Método de Investigación: Para cumplir este objetivo se opta por Action Research (AR) como el método de investigación más adecuado a las características de la investigación, para obtener resultados a través de aproximaciones sucesivas que abordan los problemas concretos de comunicación entre experimentadores. Resultados: Se formalizó el modelo conceptual del ciclo experimental desde la perspectiva de los 3 roles principales que representan los experimentadores en el proceso experimental, siendo estos: Gestor de la Investigación (GI), Gestor del Experimento (GE) y Experimentador Senior (ES). Por otra parte, se formalizó el modelo del ciclo experimental, a través de: Un workflow del ciclo y un diagrama de procesos. Paralelamente a la formalización del proceso experimental en IS, se desarrolló ISRE (de las siglas en inglés Infrastructure for Sharing and Replicating Experiments), una prueba de concepto de entorno de soporte a la experimentación en IS. Finalmente, se plantearon guías para el desarrollo de entornos de soporte a la experimentación en IS, en base al estudio de las características principales y comunes de los modelos de las herramientas de soporte a la experimentación en distintas disciplinas experimentales. Conclusiones: La principal contribución de la investigación esta representada por la formalización del proceso experimental en IS. Los modelos que representan la formalización del ciclo experimental, así como la herramienta ISRE, construida a modo de evaluación de los modelos, fueron encontrados satisfactorios por los experimentadores del GrISE. Para consolidar la validez de la formalización, consideramos que este estudio debería ser replicado en otros grupos de investigación representativos en la comunidad de la IS experimental. Futuras Líneas de Investigación: El cumplimiento de los objetivos, de la mano con los hallazgos alcanzados, han dado paso a nuevas líneas de investigación, las cuales son las siguientes: (1) Considerar la construcción de un mecanismo para facilitar el proceso de hacer explícito el conocimiento tácito de los experimentadores por si mismos de forma colaborativa y basados en el debate y el consenso , (2) Continuar la investigación empírica en el mismo grupo de investigación hasta cubrir completamente el ciclo experimental (por ejemplo: experimentos nuevos, síntesis de resultados, etc.), (3) Replicar el proceso de investigación en otros grupos de investigación en ISE, y (4) Renovar la tecnología de la prueba de concepto, tal que responda a las restricciones y necesidades de un entorno real de investigación. ABSTRACT Background: This research addresses first and foremost the replication and also the synthesis of software engineering (SE) experiments. Replication is impossible without access to all the details of the original experiment. But the description of experiments is usually incomplete because knowledge is tacit, there is no standard reporting format or there are hardly any tools to support the generation of experimental reports, etc. This means that the original experiment cannot be reproduced exactly. These issues place considerable constraints on experimenters’ options for carrying out replications and ultimately synthesizing experiments. Aim: The aim of the research is to formalize the SE experimental process in order to facilitate information communication among experimenters. Context: This PhD research was developed within the empirical software engineering research group (GrISE) at the Universidad Politécnica de Madrid (UPM)’s School of Computer Engineering (ETSIINF) as part of project TIN2011-23216 entitled “Technologies for Software Engineering Experiment Replication and Synthesis”, which was funded by the Spanish Government. The GrISE research group fulfils all the requirements (established family of experiments with at least three experimental lines and lengthy replication experience (16 replications prior to 2011 in the software testing techniques line)) and provides favourable conditions for the research to be conducted in the best possible way, like, for example, full access to information. Research Method: We opted for action research (AR) as the research method best suited to the characteristics of the investigation. Results were generated successive rounds of AR addressing specific communication problems among experimenters. Results: The conceptual model of the experimental cycle was formalized from the viewpoint of three key roles representing experimenters in the experimental process. They were: research manager, experiment manager and senior experimenter. The model of the experimental cycle was formalized by means of a workflow and a process diagram. In tandem with the formalization of the SE experimental process, infrastructure for sharing and replicating experiments (ISRE) was developed. ISRE is a proof of concept of a SE experimentation support environment. Finally, guidelines for developing SE experimentation support environments were designed based on the study of the key features that the models of experimentation support tools for different experimental disciplines had in common. Conclusions: The key contribution of this research is the formalization of the SE experimental process. GrISE experimenters were satisfied with both the models representing the formalization of the experimental cycle and the ISRE tool built in order to evaluate the models. In order to further validate the formalization, this study should be replicated at other research groups representative of the experimental SE community. Future Research Lines: The achievement of the aims and the resulting findings have led to new research lines, which are as follows: (1) assess the feasibility of building a mechanism to help experimenters collaboratively specify tacit knowledge based on debate and consensus, (2) continue empirical research at the same research group in order to cover the remainder of the experimental cycle (for example, new experiments, results synthesis, etc.), (3) replicate the research process at other ESE research groups, and (4) update the tools of the proof of concept in order to meet the constraints and needs of a real research environment.
Resumo:
This paper presents some power converter architectures and circuit topologies, which can be used to achieve the requirements of the high performance transformer rectifier unit in aircraft applications, mainly as: high power factor with low THD, high efficiency and high power density. The voltage and the power levels demanded for this application are: three-phase line-to-neutral input voltage of 115 or 230V AC rms (360 – 800Hz), output voltage of 28V DC or 270V DC(new grid value) and the output power up to tens of kilowatts.
Resumo:
Programa informático desarrollado en plataforma EXCEL (VBA) y dirigido al diseño de Separadores de dos y tres fases, verticales y horizontales. El programa de ordenador o aplicación tiene la capacidad de determinar las propiedades físicas del fluido, utilizando diferentes correlaciones sobre la base del “Black Oil Model”, con dichas propiedades el Programa predice el tipo de flujo presente. Si el tipo de flujo es “Slug Flow” el programa determinara las dimensiones del “Slug catcher” necesario. Bajo las condiciones de funcionamiento existentes el programa diseñará el separador elegido: dos o tres fases, vertical u horizontal. Por último, la aplicación informática estimará el coste del equipo. Abstract Computer program developed in EXCEL (VBA) platform and aimed for the design of Two-Phase, Three-Phase, Vertical or Horizontal Separators. The computer Program or Application has the capability to determine the fluid physical properties utilizing different correlations on the basis of the Black Oil Model, with those Properties the Program will predict the Flow Regime present. If the flow regime is Slug Flow the program will determine the necessary slug catcher dimensions. Under certain operational conditions the program will design the selected: Two-Phase or Three-Phase, Vertical or Horizontal Separator. Finally the computer Application will estimate the cost of the equipment.