4 resultados para TSPi
em Universidad Politécnica de Madrid
Resumo:
Este artículo presenta el análisis de los resultados obtenidos al aplicar TSPi en el desarrollo de un proyecto software en una microempresa desde el punto de vista de la calidad y la productividad. La organización en estudio necesitaba mejorar la calidad de sus procesos pero no contaba con los recursos económicos que requieren modelos como CMMI-DEV. Por esta razón, se decidió utilizar un proceso adaptado a la organización basado en TSPi, observándose una reducción en la desviación de las estimaciones, un incremento en la productividad, y una mejora en la calidad.---ABSTRACT---This article shows the benefits of developing a software project using TSPi in a “Very Small Enterprise” based in quality and productivity measures. An adapted process from the current process based on the TSPi was defined and the team was trained in it. The workaround began by gathering historical data from previous projects in order to get a measurement repository, and then the project metrics were collected. Finally, the process, product and quality improvements were verified.
Resumo:
This article shows the benefits of developing a software project using TSPi in a "Very Small Enterprise" based in quality and productivity measures. An adapted process from the current process based on the TSPi was defined and the team was trained in it. The pilot project had schedule and budget constraints. The workaround began by gathering historical data from previous projects in order to get a measurement repository, and then the project metrics were collected. Finally, the process, product and quality improvements were verified
Resumo:
This article introduces a small setting case study about the benefits of using TSPi in a software project. An adapted process from the current process based on the TSPi was defined. The pilot project had schedule and budget constraints. The process began by gathering historical data from previous projects in order to get a measurement repository. The project was launched with the following goals: increase the productivity, reduce the test time and improve the product quality. Finally, the results were analysed and the goals were verified
Resumo:
This article presents a case study about the TSPi benefits in a software project under a Small Settings environment. An adapted process based on the TSPi was defined. The pilot project had a schedule and budget restricted. The process began collecting historical projects data in order to get a measure repository. The project was launched defining the following goals: increase the productivity, reduce the test time and improve the product quality. Finally, the results were analysed and the goals were verified.