A small settings case study using TSPi in a software project
Data(s) |
2008
|
---|---|
Resumo |
This article introduces a small setting case study about the benefits of using TSPi in a software project. An adapted process from the current process based on the TSPi was defined. The pilot project had schedule and budget constraints. The process began by gathering historical data from previous projects in order to get a measurement repository. The project was launched with the following goals: increase the productivity, reduce the test time and improve the product quality. Finally, the results were analysed and the goals were verified |
Formato |
application/pdf |
Identificador | |
Idioma(s) |
eng |
Publicador |
Facultad de Informática (UPM) |
Relação |
http://oa.upm.es/38308/1/INVE_MEM_2008_209881.pdf http://www.foibg.com/ijitk/ijitk-vol02/ijitk02-3-p07.pdf |
Direitos |
http://creativecommons.org/licenses/by-nc-nd/3.0/es/ info:eu-repo/semantics/openAccess |
Fonte |
International Journal Information Technologies and Knowledge (IJ ITK), ISSN 1313-0455, 2008, Vol. 2, No. 3 |
Palavras-Chave | #Informática |
Tipo |
info:eu-repo/semantics/article Artículo PeerReviewed |