41 resultados para Project performance Infrastructure

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conflict resolution is a key issue to manage when dealing with diverse stakeholders. By analysing in depth the most relevant and implicit aspects of the construct "conflict", this study focuses on examining how the five main strategies in solving common disagreements are adopted by considering different conflict sources. Hypotheses are tested using data collected from both the academic and business world. Perceptions of project managers and team members allows the authors not only to find significant differences by role played or type of organization, but to narrow the design of future approaches to investigate the relation between conflict and project performance. More specifically, the research indicates that project managers adopt confronting and compromising styles in most cases as first options, highlighting the influence of responsibility degree factor in how issues are undertaken within a project team.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

(Matsukawa and Habeck, 2007) analyse the main instruments for risk mitigation in infrastructure financing with Multilateral Financial Institutions (MFIs). Their review coincided with the global financial crisis of 2007-08, and is highly relevant in current times considering the sovereign debt crisis, the lack of available capital and the increases in bank regulation in Western economies. The current macroeconomic environment has seen a slowdown in the level of finance for infrastructure projects, as they pose a higher credit risk given their requirements for long term investments. The rationale for this work is to look for innovative solutions that are focused on the credit risk mitigation of infrastructure and energy projects whilst optimizing the economic capital allocation for commercial banks. This objective is achieved through risk-sharing with MFIs and looking for capital relief in project finance transactions. This research finds out the answer to the main question: "What is the impact of risk-sharing with MFIs on project finance transactions to increase their efficiency and viability?", and is developed from the perspective of a commercial bank assessing the economic capital used and analysing the relevant variables for it: Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). An overview of project finance for the infrastructure and energy sectors in terms of the volume of transactions worldwide is outlined, along with a summary of risk-sharing financing with MFIs. A review of the current regulatory framework beneath risk-sharing in structured finance with MFIs is also analysed. From here, the impact of risk-sharing and the diversification effect in infrastructure and energy projects is assessed, from the perspective of economic capital allocation for a commercial bank. CreditMetrics (J. P. Morgan, 1997) is applied over an existing well diversified portfolio of project finance infrastructure and energy investments, working with the main risk capital measures: economic capital, RAROC, and EVA. The conclusions of this research show that economic capital allocation on a portfolio of project finance along with risk-sharing with MFIs have a huge impact on capital relief whilst increasing performance profitability for commercial banks. There is an outstanding diversification effect due to the portfolio, which is combined with risk mitigation and an improvement in recovery rates through Partial Credit Guarantees issued by MFIs. A stress test scenario analysis is applied to the current assumptions and credit risk model, considering a downgrade in the rating for the commercial bank (lender) and an increase of default in emerging countries, presenting a direct impact on economic capital, through an increase in expected loss and a decrease in performance profitability. Getting capital relief through risk-sharing makes it more viable for commercial banks to finance infrastructure and energy projects, with the beneficial effect of a direct impact of these investments on GDP growth and employment. The main contribution of this work is to promote a strategic economic capital allocation in infrastructure and energy financing through innovative risk-sharing with MFIs and economic pricing to create economic value added for banks, and to allow the financing of more infrastructure and energy projects. This work suggests several topics for further research in relation to issues analysed. (Matsukawa and Habeck, 2007) analizan los principales instrumentos de mitigación de riesgos en las Instituciones Financieras Multilaterales (IFMs) para la financiación de infraestructuras. Su presentación coincidió con el inicio de la crisis financiera en Agosto de 2007, y sus consecuencias persisten en la actualidad, destacando la deuda soberana en economías desarrolladas y los problemas capitalización de los bancos. Este entorno macroeconómico ha ralentizado la financiación de proyectos de infraestructuras. El actual trabajo de investigación tiene su motivación en la búsqueda de soluciones para la financiación de proyectos de infraestructuras y de energía, mitigando los riesgos inherentes, con el objeto de reducir el consumo de capital económico en los bancos financiadores. Este objetivo se alcanza compartiendo el riesgo de la financiación con IFMs, a través de estructuras de risk-sharing. La investigación responde la pregunta: "Cuál es el impacto de risk-sharing con IFMs, en la financiación de proyectos para aumentar su eficiencia y viabilidad?". El trabajo se desarrolla desde el enfoque de un banco comercial, estimando el consumo de capital económico en la financiación de proyectos y analizando las principales variables del riesgo de crédito, Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). La investigación presenta las cifras globales de Project Finance en los sectores de infraestructuras y de energía, y analiza el marco regulatorio internacional en relación al consumo de capital económico en la financiación de proyectos en los que participan IFMs. A continuación, el trabajo modeliza una cartera real, bien diversificada, de Project Finance de infraestructuras y de energía, aplicando la metodología CreditMet- rics (J. P. Morgan, 1997). Su objeto es estimar el consumo de capital económico y la rentabilidad de la cartera de proyectos a través del RAROC y EVA. La modelización permite estimar el efecto diversificación y la liberación de capital económico consecuencia del risk-sharing. Los resultados muestran el enorme impacto del efecto diversificación de la cartera, así como de las garantías parciales de las IFMs que mitigan riesgos, mejoran el recovery rate de los proyectos y reducen el consumo de capital económico para el banco comercial, mientras aumentan la rentabilidad, RAROC, y crean valor económico, EVA. En escenarios económicos de inestabilidad, empeoramiento del rating de los bancos, aumentos de default en los proyectos y de correlación en las carteras, hay un impacto directo en el capital económico y en la pérdida de rentabilidad. La liberación de capital económico, como se plantea en la presente investigación, permitirá financiar más proyectos de infraestructuras y de energía, lo que repercutirá en un mayor crecimiento económico y creación de empleo. La principal contribución de este trabajo es promover la gestión activa del capital económico en la financiación de infraestructuras y de proyectos energéticos, a través de estructuras innovadoras de risk-sharing con IFMs y de creación de valor económico en los bancos comerciales, lo que mejoraría su eficiencia y capitalización. La aportación metodológica del trabajo se convierte por su originalidad en una contribución, que sugiere y facilita nuevas líneas de investigación académica en las principales variables del riesgo de crédito que afectan al capital económico en la financiación de proyectos.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This study analyzes the effect of organizational characteristics on the innovation project performance. This research applies fuzzy set Qualitative Comparative Analysis (fsQCA) to a large sample of Spanish firms appearing in the Community Innovation survey (CIS). The results show that the combination of organizational innovation, firm size and cooperationwith national and, especially, international firms is a sufficient condition for the success of innovation projects within the organization. Evidence also suggests that variables such as the investment on R&D peremployee or the seniority of the company do not affect the success of innovation projects. These findings help complement some results in previous studies on innovation projects performance.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

En la actualidad, el uso de los sistemas de telecomunicaciones está aumentado a una gran velocidad. Debido a este aumento se hace imprescindible tener que crear sistemas de telecomunicaciones que trabajen en altas frecuencias. Al trabajar en estas frecuencias aparecen fenómenos atmosféricos que hacen que la señal se vea afectada, como la atenuación por lluvia o la atenuación por gases. Estos efectos podrían incluso hacer inviable la comunicación. Este Proyecto Fin de Grado tiene como objetivo la síntesis de series temporales de atenuación por lluvia en trayecto horizontal que afecta a un radioenlace de 38 GHz situado en Madrid. Para la realización del proyecto se utiliza como punto de partida los efectos de atenuación por lluvia en radioenlace horizontal descritos en la Recomendación UIT-R P.530-15. Los resultados obtenidos permiten examinar la validez del método propuesto en la Recomendación UIT-R P.1853-1 referente a la síntesis de las series temporales de atenuación troposférica. Este método propone un sintetizador para combinar los distintos efectos provocados por atenuación troposférica, que será utilizado para la realización del estudio. Este sintetizador ha sido implementado usado el programa Matlab. La primera parte del Proyecto expone los fundamentos teóricos sobre los que sustenta el presente trabajo. Comienza con la descripción de radioenlace, explicando sus distintos tipos y características. Después se muestran los distintos efectos de la propagación que afectan a un radioenlace. Por último, se presentan los fundamentos teóricos de series temporales, así como su implementación en un enlace de comunicaciones. En la segunda parte del Proyecto se explica el análisis de datos que se ha llevado a cabo. Primero se hace un análisis de la intensidad de lluvia según la Recomendación UIT-R P.837-6. Posteriormente se presentan los resultados de atenuación por lluvia obtenidos, haciendo una comparativa entre el modelo de la Recomendación UIT-R P.530-15, el modelo de la Recomendación UIT-R P.1853-1 y gráficas obtenidas a partir de datos experimentales. Como final del Proyecto se exponen las conclusiones que se han extraído durante su realización, así como posibles líneas futuras de investigación que continúen con el estudio realizado. ABSTRACT. The use of telecommunication systems is increasing rapidly. Due to this rising trend, it’s important to create telecommunication systems that work at high frequencies. However, some atmospheric impairments may well appear when working at these kinds of frequencies such as attenuation due to rain or gases which affect the signal. These effects could even render communication impossible. The aim of this Project is the synthesis of a time series, studying the effect of rain attenuation on a 38 GHz radio link located in Madrid. To carry out this study, the rain attenuation effects on horizontal radio links described in the ITU-R P.530-15 method are used as the starting point. The results obtained enable us to examine the validity of the practical application of the ITU R-P.1853-1 method for tropospheric attenuation time series synthesis. This method proposes a synthesizer which can combine the different effects caused by tropospheric attenuation that will be used for the study. This synthesizer has been implemented using the program Matlab. The first part of the Project starts by describing the theoretical foundations used during the Project performance. It begins with a description of radio links explaining their different types and characteristics. Following on from that, various propagation effects that affect the said radio link are shown. Finally, the theoretical foundations of the time series are presented, as well as its implementation in a communication link. In turn, the second part of the Project explains the data analysis that has been carried out. Firstly an analysis of the intensity of rain is made based on the ITU-R P.837-6 Recommendation. Subsequently, the results of the rain attenuation are presented, thus making a comparison between the ITU-R P.530-15 model, the ITU-R P.1853-1 model and graphs obtained from experimental data. Lastly, the Project shows the conclusions that have been drawn as well as propose future research lines that can be proposed so as to continue with the stud further.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The main goal of this proposal is to join together the owners of the most advanced CPV technology, with respect to the state of the art, in order to research from its leading position new applications for CPV systems. In addition to opening up new markets, it will unveil possible sources of failure in new environments outside Europe, in order to assure component reliability. The proposed project will also try to improve the current technology of the industrial partners (ISOFOTON and CONCENTRIX) by accelerating the learning curve that CPV must follow in order to reach the competitive market, and lowering the cost under the current flat panel PV significantly within 3-4 years. The use of CPV systems in remote areas, together with harsher radiation, ambient and infrastructure conditions will help to increase the rate of progress of this technology. In addition, the ISFOC s contribution, which brings together seven power plants from seven CPV technologies up to 3 MWpeak, will allow creating the most complete database of components and systems performance to be generated as well as the effects of radiation and meteorology on systems operations. Finally, regarding the new applications for CPV subject, the project will use a CPV system sized 25 kWp in a stand-alone station in Egypt (NWRC) for the first time for water pumping and irrigation purposes. In a similar way ISOFOTON will connect up to 25 kWp CPV to the Moroccan ONE utility grid. From the research content point of view of this project, which is directly addressed by the scope of the call, the cooperative research between UPM, FhG-ISE and the two companies will be favoured by the fact that all are progressing in similar directions: developing two-stage optics CPV systems. In addition to these technology improvements the UPM is very interested in developing a new concept of module, recently patented, which will fulfil all required characteristics of a good CPV with less components and reducing cost.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

La Unión Europea acaba de lanzar una iniciativa para fomentar Participaciones Público Privadas (PPPs) mediante bonos de proyecto más atractivos a inversores institucionales para promover proyectos transeuropeos. Esto se logra a través de mecanismos de mejora crediticia como garantías de liquidez o tramos de deuda subordinada facilitados por el Banco Europeo de Inversiones. Esta iniciativa pretende evitar los problemas de liquidez experimentados actualmente por bancos comerciales en Europa para financiar megaproyectos. En este artículo exploramos las ventajas e inconvenientes de esta iniciativa para promover redes de infraestructuras transnacionales en Europa, y analizamos su aplicabilidad a otras áreas como Latino-América. The European Union recently launched an initiative to foster Public Private Partnerships (PPPs) for delivering Trans-European projects by making long-term project-bonds more appealing to institutional investors. This is achieved through credit-enhancement mechanisms such as partial stand-by liquidity guarantees, or layers of subordinated debt provided by the European Investment Bank. This initiative intends to circumvent the liquidity problems currently endured by commercial banks in Europe to fund megaprojects. In this paper we explore the advantages and drawbacks of this initiative for promoting transnational infrastructure networks in Europe, and analyse its applicability to other economic areas such as Latin America.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Between 2003 and 2007 an urban network of road tunnels with a total constructed tubes length of 45 km was built in the city of Madrid. This amazing engineering work, known as “Calle30 Project” counted with different kinds of tunnel typologies and ventilation systems. Due to the length of the tunnels and the impact of the work itself, the tunnels were endowed with a great variety of installations to provide the maximum levels of safety both for users and the infrastructure including,in some parts of the tunnel, fixed fire fighting system based on water mist. Within this framework a large-scale campaign of fire tests were planned to study different aspects related to fire safety in the tunnels including the phenomena of the interaction between ventilation and extinction system. In addition, this large scale fire tests allowed fire brigades of the city of Madrid an opportunity to define operational procedures for specific fire fighting in tunnels and evaluate the possibilities of fixed fire fighting systems. The tests were carried out in the Center of Experimentation "San Pedro of Anes" which counts with a 600 m tunnel with a removable false ceiling for reproducing different ceiling heights and ventilation conditions (transverse and longitudinal ones). Interesting conclusions on the interaction of ventilation and water mist systems were obtained but also on other aspects including performance of water mist system in terms of reduction of gas temperatures or visibility conditions. This paper presents a description of the test’s campaign carried out and some previous results obtained.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper reports the results of the assessment of a range of measures implemented in bus systems in five European cities to improve the use of public transport by increasing its attractiveness and enhancing its image in urban areas. This research was conducted as part of the EBSF project (European Bus System of the Future) from 2008 to 2012. New buses (prototypes), new vehicle and infrastructure technologies, and operational best practices were introduced, all of which were combined in a system approach. The measures were assessed using multicriteria analysis to simultaneously evaluate a certain number of criteria that need to be aggregated. Each criterion is measured by one or more key performance indicators (KPI) calculated in two scenarios (reference scenario, with no measure implemented; and project scenario, with the implementation of some measures), in order to evaluate the difference in the KPI performance between the reference and project scenario. The results indicate that the measures produce a greater benefit in issues related to bus system productivity and customer satisfaction, with the greatest impact on aspects of perceptions of comfort, cleanliness and quality of service, information to passengers and environmental issues. The study also reveals that the implementation of several measures has greater social utility than very specific and isolated measures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An important step to assess water availability is to have monthly time series representative of the current situation. In this context, a simple methodology is presented for application in large-scale studies in regions where a properly calibrated hydrologic model is not available, using the output variables simulated by regional climate models (RCMs) of the European project PRUDENCE under current climate conditions (period 1961–1990). The methodology compares different interpolation methods and alternatives to generate annual times series that minimise the bias with respect to observed values. The objective is to identify the best alternative to obtain bias-corrected, monthly runoff time series from the output of RCM simulations. This study uses information from 338 basins in Spain that cover the entire mainland territory and whose observed values of natural runoff have been estimated by the distributed hydrological model SIMPA. Four interpolation methods for downscaling runoff to the basin scale from 10 RCMs are compared with emphasis on the ability of each method to reproduce the observed behaviour of this variable. The alternatives consider the use of the direct runoff of the RCMs and the mean annual runoff calculated using five functional forms of the aridity index, defined as the ratio between potential evapotranspiration and precipitation. In addition, the comparison with respect to the global runoff reference of the UNH/GRDC dataset is evaluated, as a contrast of the “best estimator” of current runoff on a large scale. Results show that the bias is minimised using the direct original interpolation method and the best alternative for bias correction of the monthly direct runoff time series of RCMs is the UNH/GRDC dataset, although the formula proposed by Schreiber (1904) also gives good results

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Participatory Sensing combines the ubiquity of mobile phones with sensing capabilities of Wireless Sensor Networks. It targets pervasive collection of information, e.g., temperature, traffic conditions, or health-related data. As users produce measurements from their mobile devices, voluntary participation becomes essential. However, a number of privacy concerns -- due to the personal information conveyed by data reports -- hinder large-scale deployment of participatory sensing applications. Prior work on privacy protection, for participatory sensing, has often relayed on unrealistic assumptions and with no provably-secure guarantees. The goal of this project is to introduce PEPSI: a Privacy-Enhanced Participatory Sensing Infrastructure. We explore realistic architectural assumptions and a minimal set of (formal) privacy requirements, aiming at protecting privacy of both data producers and consumers. We design a solution that attains privacy guarantees with provable security at very low additional computational cost and almost no extra communication overhead.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the innovations in the practical work of the Data Structures subject carried out in the last five years, including a transition period and a first year of implantation of the European Higher Education Area. The practical coursework is inspired by a project-based methodology and from 2008/2009 additional laboratory sessions are included in the subject schedule. We will present the academic results and ratios of the mentioned time period which imply a significant improvement on students' performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The contributions of driver behaviour as well as surrounding infrastructure are decisive on pollutant emissions from vehicles in real traffic situations. This article deals with the preliminary study of the interaction between the dynamic variables recorded in a vehicle (driving pattern) and pollutant emissions produced over a given urban route. It has been established a “dynamic performance index”-DPI, which is calculated from some driving pattern parameters, which in turn depends on traffic congestion level and route characteristics, in order to determine whether the driving has been aggressive, normal or calm. Two passenger cars instrumented with a portable activity measurement system -to record dynamic variables- and on-board emission measurement equipment have been used. This study has shown that smooth driving patterns can reduce up to 80% NOX emissions and up to 20% of fuel in the same route

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document presents an innovative, formal educational initiative that is aimed at enhancing the development of engineering students’ specific competences when studying Project Management (PM) subject. The framework of the experience combines (1) theoretical concepts, (2) the development of a real-case project carried out by multidisciplinary groups of three different universities, (3) the use of software web 2.0 tools and (4) group and individual assignments of students that play different roles (project managers and team members). Under this scenario, the study focuses on monitoring the communication competence in the ever growing PM virtual environment. Factors such as corporal language, technical means, stage, and PM specific vocabulary among others have been considered in order to assess the students’ performance on this issue. As a main contribution, the paper introduces an ad-hoc rubric that, based on previous investigations, has been adapted and tested for the first time to this new and specific context. Additionally, the research conducted has provided some interesting findings that suggest further actions to improve and better define future rubrics, oriented to communication or even other competences. As specific PM subject concerns, it has been detected that students playing the role of Project Managers strengthen their competences more than those ones that play the role of Team Members. It has also been detected that students have more difficulty assimilating concepts related to risk and quality management. However those concepts related with scope, time or cost areas of knowledge have been better assimilated by the students.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Infrastructure concession is an alternative widely used by governments to increase investment. In the case of the road sector, the main characteristics of the concessions are: long-term projects, high investments in the early years of the contract and high risks. A viability analysis must be carried out for each concession and consider the characteristics of the project. When the infrastructure is located in a developing country, political and market growth uncertainties should be add in the concession project analysis, as well as economic instability, because they present greater risks. This paper is an analysis of state bank participation in road infrastructure finance in developing countries. For this purpose, we studied road infrastructure financing and its associated risks, and also the features of developing countries. Furthermore, we considered the issue of state banks and multilateral development banks that perform an important role by offering better credit lines than the private banks, in terms of cost, interest and grace period. Based on this study, we analyzed the Brazilian Development Bank - BNDES – and their credit supply to road infrastructure concessions. The results show that BNDES is the main financing agent for long-term investment in the sector, offering loans with low interest rates in Brazilian currency. From this research we argue that a single state bank should not alone support the increasing demand for finance in Brazil. Therefore, we conclude that there is a need to expand the supply of credit in Brazil, by strengthening private banks in the long-term lending market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this study is to evaluate the effects obtained after applying two active learning methodologies (cooperative learning and project based learning) to the achievement of the competence problem solving. This study was carried out at the Technical University of Madrid, where these methodologies were applied to two Operating Systems courses. The first hypothesis tested was whether the implementation of active learning methodologies favours the achievement of ?problem solving?. The second hypothesis was focused on testing if students with higher rates in problem solving competence obtain better results in their academic performance. The results indicated that active learning methodologies do not produce any significant change in the generic competence ?problem solving? during the period analysed. Concerning this, we consider that students should work with these methodologies for a longer period, besides having a specific training. Nevertheless, a close correlation between problem solving self appraisal and academic performance has been detected.