Resumo:
In this paper the power-frequency control of hydropower plants with long penstocks is addressed. In such configuration the effects of pressure waves cannot be neglected and therefore commonly used criteria for adjustment of PID governors would not be appropriate. A second-order Π model of the turbine-penstock based on a lumped parameter approach is considered. A correction factor is introduced in order to approximate the model frequency response to the continuous case in the frequency interval of interest. Using this model, several criteria are analysed for adjusting the PI governor of a hydropower plant operating in an isolated system. Practical criteria for adjusting the PI governor are given. The results are applied to a real case of a small island where the objective is to achieve a generation 100% renewable (wind and hydro). Frequency control is supposed to be provided exclusively by the hydropower plant. It is verified that the usual criterion for tuning the PI controller of isolated hydro plants gives poor results. However, with the new proposed adjustment, the time response is considerably improved
Resumo:
In this paper, a hydroelectric power plant with long tail-race tunnel has been modelled for assessing its contribution to secondary regulation reserve. Cavitation problems, caused by the discharge conduit length, are expected downstream the turbine where low pressure appears during regulation manoeuvres. Therefore, governor's gains should be selected taking into account these phenomena. On the other hand, regulation services bidden by the plant operator should fulfil TSO (Transmission System Operator) quality requirements. A methodology for tuning governor PI gains is proposed and applied to a Hydro power plant in pre-design phase in northwest area of Spain. The PI gains adjustment proposed provides a proper plant response, according to some established indexes, while avoiding cavitation phenomena.
Resumo:
Pumped storage hydro plants (PSHP) can provide adequate energy storage and frequency regulation capacities in isolated power systems having significant renewable energy resources. Due to its high wind and solar potential, several plans have been developed for La Palma Island in the Canary archipelago, aimed at increasing the penetration of these energy sources. In this paper, the performance of the frequency control of La Palma power system is assessed, when the demand is supplied by the available wind and solar generation with the support of a PSHP which has been predesigned for this purpose. The frequency regulation is provided exclusively by the PSHP. Due to topographic and environmental constraints, this plant has a long tail-race tunnel without a surge tank. In this configuration, the effects of pressure waves cannot be neglected and, therefore, usual recommendations for PID governor tuning provide poor performance. A PI governor tuning criterion is proposed for the hydro plant and compared with other criteria according to several performance indices. Several scenarios considering solar and wind energy penetration have been simulated to check the plant response using the proposed criterion. This tuning of the PI governor maintains La Palma system frequency within grid code requirements.