25 resultados para Distribution system - Power quality

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Current trends in the fields of artifical intelligence and expert systems are moving towards the exciting possibility of reproducing and simulating human expertise and expert behaviour into a knowledge base, coupled with an appropriate, partially ‘intelligent’, computer code. This paper deals with the quality level prediction in concrete structures using the helpful assistance of an expert system, QL-CONST1, which is able to reason about this specific field of structural engineering. Evidence, hypotheses and factors related to this human knowledge field have been codified into a knowledge base. This knowledge base has been prepared in terms of probabilities of the presence of either hypotheses or evidence and the conditional presence of both. Human experts in the fields of structural engineering and the safety of structures gave their invaluable knowledge and assistance to the construction of the knowledge base. Some illustrative examples for, the validation of the expert system behaviour are included.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Multimedia distribution through wireless networks in the home environment presents a number of advantages which have fueled the interest of industry in recent years, such as simple connectivity and data delivery to a variety of devices. Together with High-Definition (HD) contents, multimedia wireless networks have been proposed for several applications, such as IPTV and Digital TV distribution for multiple devices in the home environment. For these scenarios, we propose a multicast distribution system for High-Definition video over 802.11 wireless networks based on rate-limited packet retransmission. We develop a limited rate ARQ system that retransmits packets according to the importance of their content (prioritization scheme) and according to their delay limitations (delay control). The performance of our proposed ARQ system is evaluated and compared with a similarly rate-limited ARQ algorithm. The results show a higher packet recovery rate and improvements in video quality for our proposed system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

One of the main obstacles to the widespread adoption of quantum cryptography has been the difficulty of integration into standard optical networks, largely due to the tremendous difference in power of classical signals compared with the single quantum used for quantum key distribution. This makes the technology expensive and hard to deploy. In this letter, we show an easy and straightforward integration method of quantum cryptography into optical access networks. In particular, we analyze how a quantum key distribution system can be seamlessly integrated in a standard access network based on the passive optical and time division multiplexing paradigms. The novelty of this proposal is based on the selective post-processing that allows for the distillation of secret keys avoiding the noise produced by other network users. Importantly, the proposal does not require the modification of the quantum or classical hardware specifications neither the use of any synchronization mechanism between the network and quantum cryptography devices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Communications Based Train Control Systems require high quality radio data communications for train signaling and control. Actually most of these systems use 2.4GHz band with proprietary radio transceivers and leaky feeder as distribution system. All them demand a high QoS radio network to improve the efficiency of railway networks. We present narrow band, broad band and data correlated measurements taken in Madrid underground with a transmission system at 2.4 GHz in a test network of 2 km length in subway tunnels. The architecture proposed has a strong overlap in between cells to improve reliability and QoS. The radio planning of the network is carefully described and modeled with narrow band and broadband measurements and statistics. The result is a network with 99.7% of packets transmitted correctly and average propagation delay of 20ms. These results fulfill the specifications QoS of CBTC systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The development of functional legged robots has encountered its limits in human-made actuation technology. This paper describes research on the biomimetic design of legs for agile quadrupeds. A biomimetic leg concept that extracts key principles from horse legs which are responsible for the agile and powerful locomotion of these animals is presented. The proposed biomimetic leg model defines the effective leg length, leg kinematics, limb mass distribution, actuator power, and elastic energy recovery as determinants of agile locomotion, and values for these five key elements are given. The transfer of the extracted principles to technological instantiations is analyzed in detail, considering the availability of current materials, structures and actuators. A real leg prototype has been developed following the biomimetic leg concept proposed. The actuation system is based on the hybrid use of series elasticity and magneto-rheological dampers which provides variable compliance for natural motion. From the experimental evaluation of this prototype, conclusions on the current technological barriers to achieve real functional legged robots to walk dynamically in agile locomotion are presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Energy management has always been recognized as a challenge in mobile systems, especially in modern OS-based mobile systems where multi-functioning are widely supported. Nowadays, it is common for a mobile system user to run multiple applications simultaneously while having a target battery lifetime in mind for a specific application. Traditional OS-level power management (PM) policies make their best effort to save energy under performance constraint, but fail to guarantee a target lifetime, leaving the painful trading off between the total performance of applications and the target lifetime to the user itself. This thesis provides a new way to deal with the problem. It is advocated that a strong energy-aware PM scheme should first guarantee a user-specified battery lifetime to a target application by restricting the average power of those less important applications, and in addition to that, maximize the total performance of applications without harming the lifetime guarantee. As a support, energy, instead of CPU or transmission bandwidth, should be globally managed as the first-class resource by the OS. As the first-stage work of a complete PM scheme, this thesis presents the energy-based fair queuing scheduling, a novel class of energy-aware scheduling algorithms which, in combination with a mechanism of battery discharge rate restricting, systematically manage energy as the first-class resource with the objective of guaranteeing a user-specified battery lifetime for a target application in OS-based mobile systems. Energy-based fair queuing is a cross-application of the traditional fair queuing in the energy management domain. It assigns a power share to each task, and manages energy by proportionally serving energy to tasks according to their assigned power shares. The proportional energy use establishes proportional share of the system power among tasks, which guarantees a minimum power for each task and thus, avoids energy starvation on any task. Energy-based fair queuing treats all tasks equally as one type and supports periodical time-sensitive tasks by allocating each of them a share of system power that is adequate to meet the highest energy demand in all periods. However, an overly conservative power share is usually required to guarantee the meeting of all time constraints. To provide more effective and flexible support for various types of time-sensitive tasks in general purpose operating systems, an extra real-time friendly mechanism is introduced to combine priority-based scheduling into the energy-based fair queuing. Since a method is available to control the maximum time one time-sensitive task can run with priority, the power control and time-constraint meeting can be flexibly traded off. A SystemC-based test-bench is designed to assess the algorithms. Simulation results show the success of the energy-based fair queuing in achieving proportional energy use, time-constraint meeting, and a proper trading off between them. La gestión de energía en los sistema móviles está considerada hoy en día como un reto fundamental, notándose, especialmente, en aquellos terminales que utilizando un sistema operativo implementan múltiples funciones. Es común en los sistemas móviles actuales ejecutar simultaneamente diferentes aplicaciones y tener, para una de ellas, un objetivo de tiempo de uso de la batería. Tradicionalmente, las políticas de gestión de consumo de potencia de los sistemas operativos hacen lo que está en sus manos para ahorrar energía y satisfacer sus requisitos de prestaciones, pero no son capaces de proporcionar un objetivo de tiempo de utilización del sistema, dejando al usuario la difícil tarea de buscar un compromiso entre prestaciones y tiempo de utilización del sistema. Esta tesis, como contribución, proporciona una nueva manera de afrontar el problema. En ella se establece que un esquema de gestión de consumo de energía debería, en primer lugar, garantizar, para una aplicación dada, un tiempo mínimo de utilización de la batería que estuviera especificado por el usuario, restringiendo la potencia media consumida por las aplicaciones que se puedan considerar menos importantes y, en segundo lugar, maximizar las prestaciones globales sin comprometer la garantía de utilización de la batería. Como soporte de lo anterior, la energía, en lugar del tiempo de CPU o el ancho de banda, debería gestionarse globalmente por el sistema operativo como recurso de primera clase. Como primera fase en el desarrollo completo de un esquema de gestión de consumo, esta tesis presenta un algoritmo de planificación de encolado equitativo (fair queueing) basado en el consumo de energía, es decir, una nueva clase de algoritmos de planificación que, en combinación con mecanismos que restrinjan la tasa de descarga de una batería, gestionen de forma sistemática la energía como recurso de primera clase, con el objetivo de garantizar, para una aplicación dada, un tiempo de uso de la batería, definido por el usuario, en sistemas móviles empotrados. El encolado equitativo de energía es una extensión al dominio de la energía del encolado equitativo tradicional. Esta clase de algoritmos asigna una reserva de potencia a cada tarea y gestiona la energía sirviéndola de manera proporcional a su reserva. Este uso proporcional de la energía garantiza que cada tarea reciba una porción de potencia y evita que haya tareas que se vean privadas de recibir energía por otras con un comportamiento más ambicioso. Esta clase de algoritmos trata a todas las tareas por igual y puede planificar tareas periódicas en tiempo real asignando a cada una de ellas una reserva de potencia que es adecuada para proporcionar la mayor de las cantidades de energía demandadas por período. Sin embargo, es posible demostrar que sólo se consigue cumplir con los requisitos impuestos por todos los plazos temporales con reservas de potencia extremadamente conservadoras. En esta tesis, para proporcionar un soporte más flexible y eficiente para diferentes tipos de tareas de tiempo real junto con el resto de tareas, se combina un mecanismo de planificación basado en prioridades con el encolado equitativo basado en energía. En esta clase de algoritmos, gracias al método introducido, que controla el tiempo que se ejecuta con prioridad una tarea de tiempo real, se puede establecer un compromiso entre el cumplimiento de los requisitos de tiempo real y el consumo de potencia. Para evaluar los algoritmos, se ha diseñado en SystemC un banco de pruebas. Los resultados muestran que el algoritmo de encolado equitativo basado en el consumo de energía consigue el balance entre el uso proporcional a la energía reservada y el cumplimiento de los requisitos de tiempo real.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Un incremento de la demanda del agua, junto con el aumento de la contaminación, ha provocado que hoy en día la reutilización de las aguas depuradas sea necesaria, pero la reutilización de aguas debe garantizar y minimizar los posibles riesgos sanitarios y medioambientales que su práctica pueda provocar. En España estos parámetros se encuentran regulados por el RD 1620/2007 relativo al régimen jurídico de la reutilización de las aguas depuradas. Las aguas regeneradas son aguas que ya han sido sometidas a un tratamiento de depuración, y a las cuales se aplica un posterior tratamiento adicional o complementario que permita adecuar su calidad al uso al que vaya a destinarse. Siendo requeridos para los distintos reúsos procesos de desinfección, uno de los principales sistemas utilizados es el cloro, debido a su sencilla aplicación y costos bajos, sin tomar en cuenta la posible formación de compuestos organohalogenados potencialmente cancerígenos. Es por esto que surge la necesidad de aplicar distintos sistemas de oxidación objeto de estudio en esta tesis, como el dióxido de cloro estabilizado, ozono y los procesos avanzados de oxidación (Advanced Oxidation Processes, AOP), ozono/peróxido y uv/peróxido. En esta tesis se investiga los rendimientos que pueden alcanzar estos sistemas en la eliminación de los ácidos húmicos y los fenoles, siendo las principales sustancias formadoras de subproductos de la desinfección, así mismo, se considera necesario garantizar la desinfección del agua a través del estudio de tres grupos de microrganismos, los coliformes totales, e. coli y enterococos, siendo un punto importante el posible recrecimiento microbiológico debido a una desinfección escasa, por la permanencia en el agua de los compuestos antes mencionados, o por alguna fuente de alimento que pudieran encontrar en el sistema de distribución. Lo más importante será la calidad que se pueda alcanzar con estos desinfectantes, con el fin de obtener agua para los distintos reúsos que existen en la actualidad. Y así no limitar los alcances que puede tener la reutilización de las aguas residuales. Basándose en lo antes mencionado se procedió a realizar la caracterización del agua del rio Manzanares, con el fin de determinar la cantidad de ácidos húmicos disueltos y fenoles, obteniendo valores bajos, se decidió incorporar a las muestras de rio 5 mg/L de estos compuestos, con el fin de observar de que manera podrían interferir en la desinfección de esta agua. De esta forma se logran obtener resultados óptimos de los sistemas de desinfección estudiados, siendo el Ozono un oxidante eficiente en la desinfección de los microrganismos y en la eliminación de ácidos húmicos y fenoles con tiempos de contacto cortos, mostrando deficiencias al permitir el recrecimiento de los coliformes totales. Del sistema de oxidación avanzada UV/Peróxido se determino como un eficiente desinfectante para garantizar la inexistencia de rebrotes, al paso del tiempo. Así mismo se concluye que tiene buenos rendimientos en la eliminación del ácido húmico y los fenoles. An increase in water demand, coupled with increasing pollution, has caused today reuse of treated water is necessary, but must ensure water reuse and minimize potential health and environmental risks that their practice is cause. In Spain these parameters are regulated by Royal Decree 1620/2007 on the legal regime of the reuse of treated water. The reclaimed water is water that has already been subjected to a depuration treatment, which is applied as a subsequent further treatment that will bring quality to the use to which is to be delivered. As required for various reuses disinfection processes, one of the main systems used is chlorine, due to its simple implementation and low costs, without taking into account the possible formation of potentially carcinogenic halogenated organic compounds. That is why there is a need to apply different oxidation systems studied in this thesis, as stabilized chlorine dioxide, ozone and advanced oxidation processes (AOP), ozone/peroxide and UV/peroxide. This thesis investigates the rates can reach these systems in removing humic acids and phenols, the main substances forming disinfection byproducts, likewise, it is considered necessary to ensure water disinfection through the study of three groups of microorganisms, total coliform, e. coli and enterococci, the important point being a possible regrowth due to microbiological disinfection scarce, the water remaining on the aforementioned compounds, or a food source which may be found in the distribution system. The most important quality is that achievable with these disinfectants, with the water to obtain various reuses that exist today. And thus not limit the scope that can be reuse of wastewater. Based on the above we proceeded to perform characterization Manzanares river water, in order to determine the quantity of dissolved humic acids and phenols, obtaining low values, it was decided to incorporate river samples 5 mg / L of these compounds, in order to observe how they might interfere with the disinfection of the water. Thus optimum results are achieved for disinfection systems studied, being efficient ozone oxidant in the disinfection of microorganisms and the removal of humic acids and phenols with short contact times, showing gaps to allow regrowth total coliforms. Advanced oxidation system UV / peroxide were determined as an efficient disinfectant to ensure the absence of volunteers, the passage of time. Also it is concluded that has good yields in removing humic acid and phenols.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The increasing penetration of wind energy into power systems has pushed grid operators to set new requirements for this kind of generating plants in order to keep acceptable and reliable operation of the system. In addition to the low voltage ride through capability, wind farms are required to participate in voltage support, stability enhancement and power quality improvement. This paper presents a solution for wind farms with fixed-speed generators based on the use of STATCOM with braking resistor and additional series impedances, with an adequate control strategy. The focus is put on guaranteeing the grid code compliance when the wind farm faces an extensive series of grid disturbances.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper studies the effect of different penetration rates of plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EV) in the Spanish electrical system. A stochastic model for the average trip evaluation and for the arriving and departure times is used to determine the availability of the vehicles for charging. A novel advanced charging algorithm is proposed, which avoids any communication among all agents. Its performance is determined through different charging scenarios.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

La astronomía de rayos γ estudia las partículas más energéticas que llegan a la Tierra desde el espacio. Estos rayos γ no se generan mediante procesos térmicos en simples estrellas, sino mediante mecanismos de aceleración de partículas en objetos celestes como núcleos de galaxias activos, púlsares, supernovas, o posibles procesos de aniquilación de materia oscura. Los rayos γ procedentes de estos objetos y sus características proporcionan una valiosa información con la que los científicos tratan de comprender los procesos físicos que ocurren en ellos y desarrollar modelos teóricos que describan su funcionamiento con fidelidad. El problema de observar rayos γ es que son absorbidos por las capas altas de la atmósfera y no llegan a la superficie (de lo contrario, la Tierra será inhabitable). De este modo, sólo hay dos formas de observar rayos γ embarcar detectores en satélites, u observar los efectos secundarios que los rayos γ producen en la atmósfera. Cuando un rayo γ llega a la atmósfera, interacciona con las partículas del aire y genera un par electrón - positrón, con mucha energía. Estas partículas secundarias generan a su vez más partículas secundarias cada vez menos energéticas. Estas partículas, mientras aún tienen energía suficiente para viajar más rápido que la velocidad de la luz en el aire, producen una radiación luminosa azulada conocida como radiación Cherenkov durante unos pocos nanosegundos. Desde la superficie de la Tierra, algunos telescopios especiales, conocidos como telescopios Cherenkov o IACTs (Imaging Atmospheric Cherenkov Telescopes), son capaces de detectar la radiación Cherenkov e incluso de tomar imágenes de la forma de la cascada Cherenkov. A partir de estas imágenes es posible conocer las principales características del rayo γ original, y con suficientes rayos se pueden deducir características importantes del objeto que los emitió, a cientos de años luz de distancia. Sin embargo, detectar cascadas Cherenkov procedentes de rayos γ no es nada fácil. Las cascadas generadas por fotones γ de bajas energías emiten pocos fotones, y durante pocos nanosegundos, y las correspondientes a rayos γ de alta energía, si bien producen más electrones y duran más, son más improbables conforme mayor es su energía. Esto produce dos líneas de desarrollo de telescopios Cherenkov: Para observar cascadas de bajas energías son necesarios grandes reflectores que recuperen muchos fotones de los pocos que tienen estas cascadas. Por el contrario, las cascadas de altas energías se pueden detectar con telescopios pequeños, pero conviene cubrir con ellos una superficie grande en el suelo para aumentar el número de eventos detectados. Con el objetivo de mejorar la sensibilidad de los telescopios Cherenkov actuales, en el rango de energía alto (> 10 TeV), medio (100 GeV - 10 TeV) y bajo (10 GeV - 100 GeV), nació el proyecto CTA (Cherenkov Telescope Array). Este proyecto en el que participan más de 27 países, pretende construir un observatorio en cada hemisferio, cada uno de los cuales contará con 4 telescopios grandes (LSTs), unos 30 medianos (MSTs) y hasta 70 pequeños (SSTs). Con un array así, se conseguirán dos objetivos. En primer lugar, al aumentar drásticamente el área de colección respecto a los IACTs actuales, se detectarán más rayos γ en todos los rangos de energía. En segundo lugar, cuando una misma cascada Cherenkov es observada por varios telescopios a la vez, es posible analizarla con mucha más precisión gracias a las técnicas estereoscópicas. La presente tesis recoge varios desarrollos técnicos realizados como aportación a los telescopios medianos y grandes de CTA, concretamente al sistema de trigger. Al ser las cascadas Cherenkov tan breves, los sistemas que digitalizan y leen los datos de cada píxel tienen que funcionar a frecuencias muy altas (≈1 GHz), lo que hace inviable que funcionen de forma continua, ya que la cantidad de datos guardada será inmanejable. En su lugar, las señales analógicas se muestrean, guardando las muestras analógicas en un buffer circular de unos pocos µs. Mientras las señales se mantienen en el buffer, el sistema de trigger hace un análisis rápido de las señales recibidas, y decide si la imagen que hay en el buér corresponde a una cascada Cherenkov y merece ser guardada, o por el contrario puede ignorarse permitiendo que el buffer se sobreescriba. La decisión de si la imagen merece ser guardada o no, se basa en que las cascadas Cherenkov producen detecciones de fotones en píxeles cercanos y en tiempos muy próximos, a diferencia de los fotones de NSB (night sky background), que llegan aleatoriamente. Para detectar cascadas grandes es suficiente con comprobar que más de un cierto número de píxeles en una región hayan detectado más de un cierto número de fotones en una ventana de tiempo de algunos nanosegundos. Sin embargo, para detectar cascadas pequeñas es más conveniente tener en cuenta cuántos fotones han sido detectados en cada píxel (técnica conocida como sumtrigger). El sistema de trigger desarrollado en esta tesis pretende optimizar la sensibilidad a bajas energías, por lo que suma analógicamente las señales recibidas en cada píxel en una región de trigger y compara el resultado con un umbral directamente expresable en fotones detectados (fotoelectrones). El sistema diseñado permite utilizar regiones de trigger de tamaño seleccionable entre 14, 21 o 28 píxeles (2, 3, o 4 clusters de 7 píxeles cada uno), y con un alto grado de solapamiento entre ellas. De este modo, cualquier exceso de luz en una región compacta de 14, 21 o 28 píxeles es detectado y genera un pulso de trigger. En la versión más básica del sistema de trigger, este pulso se distribuye por toda la cámara de forma que todos los clusters sean leídos al mismo tiempo, independientemente de su posición en la cámara, a través de un delicado sistema de distribución. De este modo, el sistema de trigger guarda una imagen completa de la cámara cada vez que se supera el número de fotones establecido como umbral en una región de trigger. Sin embargo, esta forma de operar tiene dos inconvenientes principales. En primer lugar, la cascada casi siempre ocupa sólo una pequeña zona de la cámara, por lo que se guardan muchos píxeles sin información alguna. Cuando se tienen muchos telescopios como será el caso de CTA, la cantidad de información inútil almacenada por este motivo puede ser muy considerable. Por otro lado, cada trigger supone guardar unos pocos nanosegundos alrededor del instante de disparo. Sin embargo, en el caso de cascadas grandes la duración de las mismas puede ser bastante mayor, perdiéndose parte de la información debido al truncamiento temporal. Para resolver ambos problemas se ha propuesto un esquema de trigger y lectura basado en dos umbrales. El umbral alto decide si hay un evento en la cámara y, en caso positivo, sólo las regiones de trigger que superan el nivel bajo son leídas, durante un tiempo más largo. De este modo se evita guardar información de píxeles vacíos y las imágenes fijas de las cascadas se pueden convertir en pequeños \vídeos" que representen el desarrollo temporal de la cascada. Este nuevo esquema recibe el nombre de COLIBRI (Concept for an Optimized Local Image Building and Readout Infrastructure), y se ha descrito detalladamente en el capítulo 5. Un problema importante que afecta a los esquemas de sumtrigger como el que se presenta en esta tesis es que para sumar adecuadamente las señales provenientes de cada píxel, estas deben tardar lo mismo en llegar al sumador. Los fotomultiplicadores utilizados en cada píxel introducen diferentes retardos que deben compensarse para realizar las sumas adecuadamente. El efecto de estos retardos ha sido estudiado, y se ha desarrollado un sistema para compensarlos. Por último, el siguiente nivel de los sistemas de trigger para distinguir efectivamente las cascadas Cherenkov del NSB consiste en buscar triggers simultáneos (o en tiempos muy próximos) en telescopios vecinos. Con esta función, junto con otras de interfaz entre sistemas, se ha desarrollado un sistema denominado Trigger Interface Board (TIB). Este sistema consta de un módulo que irá montado en la cámara de cada LST o MST, y que estará conectado mediante fibras ópticas a los telescopios vecinos. Cuando un telescopio tiene un trigger local, este se envía a todos los vecinos conectados y viceversa, de modo que cada telescopio sabe si sus vecinos han dado trigger. Una vez compensadas las diferencias de retardo debidas a la propagación en las fibras ópticas y de los propios fotones Cherenkov en el aire dependiendo de la dirección de apuntamiento, se buscan coincidencias, y en el caso de que la condición de trigger se cumpla, se lee la cámara en cuestión, de forma sincronizada con el trigger local. Aunque todo el sistema de trigger es fruto de la colaboración entre varios grupos, fundamentalmente IFAE, CIEMAT, ICC-UB y UCM en España, con la ayuda de grupos franceses y japoneses, el núcleo de esta tesis son el Level 1 y la Trigger Interface Board, que son los dos sistemas en los que que el autor ha sido el ingeniero principal. Por este motivo, en la presente tesis se ha incluido abundante información técnica relativa a estos sistemas. Existen actualmente importantes líneas de desarrollo futuras relativas tanto al trigger de la cámara (implementación en ASICs), como al trigger entre telescopios (trigger topológico), que darán lugar a interesantes mejoras sobre los diseños actuales durante los próximos años, y que con suerte serán de provecho para toda la comunidad científica participante en CTA. ABSTRACT -ray astronomy studies the most energetic particles arriving to the Earth from outer space. This -rays are not generated by thermal processes in mere stars, but by means of particle acceleration mechanisms in astronomical objects such as active galactic nuclei, pulsars, supernovas or as a result of dark matter annihilation processes. The γ rays coming from these objects and their characteristics provide with valuable information to the scientist which try to understand the underlying physical fundamentals of these objects, as well as to develop theoretical models able to describe them accurately. The problem when observing rays is that they are absorbed in the highest layers of the atmosphere, so they don't reach the Earth surface (otherwise the planet would be uninhabitable). Therefore, there are only two possible ways to observe γ rays: by using detectors on-board of satellites, or by observing their secondary effects in the atmosphere. When a γ ray reaches the atmosphere, it interacts with the particles in the air generating a highly energetic electron-positron pair. These secondary particles generate in turn more particles, with less energy each time. While these particles are still energetic enough to travel faster than the speed of light in the air, they produce a bluish radiation known as Cherenkov light during a few nanoseconds. From the Earth surface, some special telescopes known as Cherenkov telescopes or IACTs (Imaging Atmospheric Cherenkov Telescopes), are able to detect the Cherenkov light and even to take images of the Cherenkov showers. From these images it is possible to know the main parameters of the original -ray, and with some -rays it is possible to deduce important characteristics of the emitting object, hundreds of light-years away. However, detecting Cherenkov showers generated by γ rays is not a simple task. The showers generated by low energy -rays contain few photons and last few nanoseconds, while the ones corresponding to high energy -rays, having more photons and lasting more time, are much more unlikely. This results in two clearly differentiated development lines for IACTs: In order to detect low energy showers, big reflectors are required to collect as much photons as possible from the few ones that these showers have. On the contrary, small telescopes are able to detect high energy showers, but a large area in the ground should be covered to increase the number of detected events. With the aim to improve the sensitivity of current Cherenkov showers in the high (> 10 TeV), medium (100 GeV - 10 TeV) and low (10 GeV - 100 GeV) energy ranges, the CTA (Cherenkov Telescope Array) project was created. This project, with more than 27 participating countries, intends to build an observatory in each hemisphere, each one equipped with 4 large size telescopes (LSTs), around 30 middle size telescopes (MSTs) and up to 70 small size telescopes (SSTs). With such an array, two targets would be achieved. First, the drastic increment in the collection area with respect to current IACTs will lead to detect more -rays in all the energy ranges. Secondly, when a Cherenkov shower is observed by several telescopes at the same time, it is possible to analyze it much more accurately thanks to the stereoscopic techniques. The present thesis gathers several technical developments for the trigger system of the medium and large size telescopes of CTA. As the Cherenkov showers are so short, the digitization and readout systems corresponding to each pixel must work at very high frequencies (_ 1 GHz). This makes unfeasible to read data continuously, because the amount of data would be unmanageable. Instead, the analog signals are sampled, storing the analog samples in a temporal ring buffer able to store up to a few _s. While the signals remain in the buffer, the trigger system performs a fast analysis of the signals and decides if the image in the buffer corresponds to a Cherenkov shower and deserves to be stored, or on the contrary it can be ignored allowing the buffer to be overwritten. The decision of saving the image or not, is based on the fact that Cherenkov showers produce photon detections in close pixels during near times, in contrast to the random arrival of the NSB phtotons. Checking if more than a certain number of pixels in a trigger region have detected more than a certain number of photons during a certain time window is enough to detect large showers. However, taking also into account how many photons have been detected in each pixel (sumtrigger technique) is more convenient to optimize the sensitivity to low energy showers. The developed trigger system presented in this thesis intends to optimize the sensitivity to low energy showers, so it performs the analog addition of the signals received in each pixel in the trigger region and compares the sum with a threshold which can be directly expressed as a number of detected photons (photoelectrons). The trigger system allows to select trigger regions of 14, 21, or 28 pixels (2, 3 or 4 clusters with 7 pixels each), and with extensive overlapping. In this way, every light increment inside a compact region of 14, 21 or 28 pixels is detected, and a trigger pulse is generated. In the most basic version of the trigger system, this pulse is just distributed throughout the camera in such a way that all the clusters are read at the same time, independently from their position in the camera, by means of a complex distribution system. Thus, the readout saves a complete camera image whenever the number of photoelectrons set as threshold is exceeded in a trigger region. However, this way of operating has two important drawbacks. First, the shower usually covers only a little part of the camera, so many pixels without relevant information are stored. When there are many telescopes as will be the case of CTA, the amount of useless stored information can be very high. On the other hand, with every trigger only some nanoseconds of information around the trigger time are stored. In the case of large showers, the duration of the shower can be quite larger, loosing information due to the temporal cut. With the aim to solve both limitations, a trigger and readout scheme based on two thresholds has been proposed. The high threshold decides if there is a relevant event in the camera, and in the positive case, only the trigger regions exceeding the low threshold are read, during a longer time. In this way, the information from empty pixels is not stored and the fixed images of the showers become to little \`videos" containing the temporal development of the shower. This new scheme is named COLIBRI (Concept for an Optimized Local Image Building and Readout Infrastructure), and it has been described in depth in chapter 5. An important problem affecting sumtrigger schemes like the one presented in this thesis is that in order to add the signals from each pixel properly, they must arrive at the same time. The photomultipliers used in each pixel introduce different delays which must be compensated to perform the additions properly. The effect of these delays has been analyzed, and a delay compensation system has been developed. The next trigger level consists of looking for simultaneous (or very near in time) triggers in neighbour telescopes. These function, together with others relating to interfacing different systems, have been developed in a system named Trigger Interface Board (TIB). This system is comprised of one module which will be placed inside the LSTs and MSTs cameras, and which will be connected to the neighbour telescopes through optical fibers. When a telescope receives a local trigger, it is resent to all the connected neighbours and vice-versa, so every telescope knows if its neighbours have been triggered. Once compensated the delay differences due to propagation in the optical fibers and in the air depending on the pointing direction, the TIB looks for coincidences, and in the case that the trigger condition is accomplished, the camera is read a fixed time after the local trigger arrived. Despite all the trigger system is the result of the cooperation of several groups, specially IFAE, Ciemat, ICC-UB and UCM in Spain, with some help from french and japanese groups, the Level 1 and the Trigger Interface Board constitute the core of this thesis, as they have been the two systems designed by the author of the thesis. For this reason, a large amount of technical information about these systems has been included. There are important future development lines regarding both the camera trigger (implementation in ASICS) and the stereo trigger (topological trigger), which will produce interesting improvements for the current designs during the following years, being useful for all the scientific community participating in CTA.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Short-term variability in the power generated by large grid-connected photovoltaic (PV) plants can negatively affect power quality and the network reliability. New grid-codes require combining the PV generator with some form of energy storage technology in order to reduce short-term PV power fluctuation. This paper proposes an effective method in order to calculate, for any PV plant size and maximum allowable ramp-rate, the maximum power and the minimum energy storage requirements alike. The general validity of this method is corroborated with extensive simulation exercises performed with real 5-s one year data of 500 kW inverters at the 38.5 MW Amaraleja (Portugal) PV plant and two other PV plants located in Navarra (Spain), at a distance of more than 660 km from Amaraleja.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

La aproximación de las organizaciones a la mejora de sus procesos ha venido por distintos caminos. Muchas Administraciones Públicas se acercaron a este universo a través del modelo EFQM de calidad y excelencia que surgió en la década de los 80 y que sirvió como referente en el ámbito de la Unión Europea como vía de autoevaluación y determinación de procesos de mejora continua. Está basado en la identificación de los puntos fuertes y débiles aplicados a diferentes ámbitos de la organización, siendo éstos el punto de partida para el proceso de mejora continua. Se trata de un modelo en el que puedes decir que estás en calidad aunque tu puntuación sea muy pequeña, por lo que, por imagen, muchas empresas públicas empezaron a implantarlo. La empresa privada sin embargo se decantó por los sistemas de calidad basados en normas ISO. En estos sistemas has de tener un nivel mínimo para poder exhibir una certificación o acreditación del sistema de calidad. La más extendida es la ISO 9001:2008 ya que es válida para todo tipo de empresa. Este sistema se centra en la satisfacción del cliente y está basada en gran medida en el PDCA, acrónimo de Plan, Do, Check, Act (Planificar, Hacer, Verificar y Actuar). Al tratarse de sistemas documentados, pasados los años se llega a la misma conclusión, aquellas empresas que simplemente tienen un certificado colgado en la pared y que arreglan los papeles antes de la auditoría no tienen nada que aporte valor añadido a la empresa y se autoengañan. La potencia de todo sistema de gestión de calidad reside en aprovechar el potencial de sus recursos humanos dirigiendo los recursos de la empresa de forma eficiente y haciendo participe de los objetivos de la organización a su personal para que se impliquen y sepan que se espera de cada uno. La formación de ingeniero siempre nos hace ser críticos con los modelos existentes y tratar de buscar caminos alternativos que sean más eficientes. Para ello es necesario tener un conocimiento muy preciso de la organización. Por ello, después de más de cinco años trabajando en la Organización, desempeñando diversos cometidos, analizando diferentes esferas de actuación y tras estudiar informes de diferentes organizaciones que supervisan el funcionamiento de la empresa me di cuenta que la Dirección General de la Marina Mercante podía cambiar de forma de actuar para modernizarse y ser más transparente, eficaz y eficiente. Esta tesis versa sobre la posibilidad de implantar un nuevo servicio en la Dirección General de la Marina Mercante que le permita mejorar su competitividad a nivel mundial, como estado de abanderamiento, y que, dentro de nuestras fronteras, haga que sus servicios se reorienten aprovechando el conocimiento de su personal, teniendo en cuenta las necesidades de sus usuarios y los recursos de la Organización. Las cartas de servicio permiten acercar al ciudadano al funcionamiento de la organización. Le informa de las condiciones en las que se presta el servicio, los compromisos de la empresa y la forma en la que puede participar para mejorarlos, entre otros. Por otra parte, la empresa no necesita previamente tener ningún sistema de calidad implantado, aunque, como veremos en el capítulo tres y cuatro siempre ayuda a la hora de tener sistemas de aseguramiento implantados. En el capítulo seis se detallan los objetivos que se lograrían con la implantación de las cartas de servicio en la DGMM y en el capítulo siete se discuten dichos resultados y conclusiones. ABSTRACT Different ways have been used by organizations to approach process improvement. Many Public Administrations chose quality and excellence EFQM model for that approachment. This quality program began in 80 decade and that it was the Europe Unión reference to continuous improvement autoevaluation and determination. It is based on strong and weak points of different organization fields, and they are considered as starting point for continuous improvement. This model allows enterprises to say that they are working on a quality scheme even though their score is very little, and this was why a lot of Public Administrations began using it. Nevertheless private enterprises chose quality management systems based on ISO standards. In these systems there is a threshold you must have to be able to have a certification or an accreditation of quality management system. ISO 9001:2008 is the standard most used because of it can be applied to a great range of enterprises. This system is focused on customer satisfaction and it is based on PDCA, Plan, Do, Check, Act. All these systems are documented ones, so once time goes by the same conclusion is reached: enterprises that have the certificate hung on the wall and that papers are fixed for audits have nothing that give them added value and they self-delusion. Quality management system power is related to the usage of human resources potential to lead enterprise resources efficiently and to make them participate in organization objectives. Naval architect training makes them to be critic with existing models and to try to find alternative ways to be more efficient. To achieve this goal, a precise knowledge of the organization is needed. That is the reason why, after five years in quality related issues in the Organization, in different chores, analyzing our scope and reports of organizations that supervise our operation, I realized that Merchant Marine Directorate could change the way of operation to modernize and be more transparent, efficient and effective. This thesis is about the possibility of implantation of a new service in Merchant Marine Directorate that will make it possible to improve their worldwide competitiveness as Flag State, and that to reorient all services taking into account citizens needs and Organization resources. Citizen’s charters able approachment to organization operation. It gives the following information: which are terms in which service is given, enterprise compromises, ways in which citizen can collaborate to improve them, and etc. Additionally, no quality management system is needed to be implemented. Although we’ll see in chapter three and four that having it is of great help. In chapter six are detailed goals achieved if citizen’s charters are implemented in Merchant Marine Directorate, and in chapter seven conclusions and results are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, a hydroelectric power plant with long tail-race tunnel has been modelled for assessing its contribution to secondary regulation reserve. Cavitation problems, caused by the discharge conduit length, are expected downstream the turbine where low pressure appears during regulation manoeuvres. Therefore, governor's gains should be selected taking into account these phenomena. On the other hand, regulation services bidden by the plant operator should fulfil TSO (Transmission System Operator) quality requirements. A methodology for tuning governor PI gains is proposed and applied to a Hydro power plant in pre-design phase in northwest area of Spain. The PI gains adjustment proposed provides a proper plant response, according to some established indexes, while avoiding cavitation phenomena.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

I. GENERALIDADES 1.1. Introducción Entre los diversos tipos de perturbaciones eléctricas, los huecos de tensión son considerados el problema de calidad de suministro más frecuente en los sistemas eléctricos. Este fenómeno es originado por un aumento extremo de la corriente en el sistema, causado principalmente por cortocircuitos o maniobras inadecuadas en la red. Este tipo de perturbación eléctrica está caracterizado básicamente por dos parámetros: tensión residual y duración. Típicamente, se considera que el hueco se produce cuando la tensión residual alcanza en alguna de las fases un valor entre 0.01 a 0.9 pu y tiene una duración de hasta 60 segundos. Para un usuario final, el efecto más relevante de un hueco de tensión es la interrupción o alteración de la operación de sus equipos, siendo los dispositivos de naturaleza electrónica los principalmente afectados (p. ej. ordenador, variador de velocidad, autómata programable, relé, etc.). Debido al auge tecnológico de las últimas décadas y a la búsqueda constante de automatización de los procesos productivos, el uso de componentes electrónicos resulta indispensable en la actualidad. Este hecho, lleva a que los efectos de los huecos de tensión sean más evidentes para el usuario final, provocando que su nivel de exigencia de la calidad de energía suministrada sea cada vez mayor. De forma general, el estudio de los huecos de tensión suele ser abordado bajo dos enfoques: en la carga o en la red. Desde el punto de vista de la carga, se requiere conocer las características de sensibilidad de los equipos para modelar su respuesta ante variaciones súbitas de la tensión del suministro eléctrico. Desde la perspectiva de la red, se busca estimar u obtener información adecuada que permita caracterizar su comportamiento en términos de huecos de tensión. En esta tesis, el trabajo presentado se encuadra en el segundo aspecto, es decir, en el modelado y estimación de la respuesta de un sistema eléctrico de potencia ante los huecos de tensión. 1.2. Planteamiento del problema A pesar de que los huecos de tensión son el problema de calidad de suministro más frecuente en las redes, hasta la actualidad resulta complejo poder analizar de forma adecuada este tipo de perturbación para muchas compañías del sector eléctrico. Entre las razones más comunes se tienen: - El tiempo de monitorización puede llegar a ser de varios años para conseguir una muestra de registros de huecos estadísticamente válida. - La limitación de recursos económicos para la adquisición e instalación de equipos de monitorización de huecos. - El elevado coste operativo que implica el análisis de los datos de los medidores de huecos de tensión instalados. - La restricción que tienen los datos de calidad de energía de las compañías eléctricas. Es decir, ante la carencia de datos que permitan analizar con mayor detalle los huecos de tensión, es de interés de las compañías eléctricas y la academia poder crear métodos fiables que permitan profundizar en el estudio, estimación y supervisión de este fenómeno electromagnético. Los huecos de tensión, al ser principalmente originados por eventos fortuitos como los cortocircuitos, son el resultado de diversas variables exógenas como: (i) la ubicación de la falta, (ii) la impedancia del material de contacto, (iii) el tipo de fallo, (iv) la localización del fallo en la red, (v) la duración del evento, etc. Es decir, para plantear de forma adecuada cualquier modelo teórico sobre los huecos de tensión, se requeriría representar esta incertidumbre combinada de las variables para proveer métodos realistas y, por ende, fiables para los usuarios. 1.3. Objetivo La presente tesis ha tenido como objetivo el desarrollo diversos métodos estocásticos para el estudio, estimación y supervisión de los huecos de tensión en los sistemas eléctricos de potencia. De forma específica, se ha profundizado en los siguientes ámbitos: - En el modelado realista de las variables que influyen en la caracterización de los huecos. Esto es, en esta Tesis se ha propuesto un método que permite representar de forma verosímil su cuantificación y aleatoriedad en el tiempo empleando distribuciones de probabilidad paramétricas. A partir de ello, se ha creado una herramienta informática que permite estimar la severidad de los huecos de tensión en un sistema eléctrico genérico. - Se ha analizado la influencia la influencia de las variables de entrada en la estimación de los huecos de tensión. En este caso, el estudio se ha enfocado en las variables de mayor divergencia en su caracterización de las propuestas existentes. - Se ha desarrollado un método que permite estima el número de huecos de tensión de una zona sin monitorización a través de la información de un conjunto limitado de medidas de un sistema eléctrico. Para ello, se aplican los principios de la estadística Bayesiana, estimando el número de huecos de tensión más probable de un emplazamiento basándose en los registros de huecos de otros nudos de la red. - Plantear una estrategia para optimizar la monitorización de los huecos de tensión en un sistema eléctrico. Es decir, garantizar una supervisión del sistema a través de un número de medidores menor que el número de nudos de la red. II. ESTRUCTURA DE LA TESIS Para plantear las propuestas anteriormente indicadas, la presente Tesis se ha estructurado en seis capítulos. A continuación, se describen brevemente los mismos. A manera de capítulo introductorio, en el capítulo 1, se realiza una descripción del planteamiento y estructura de la presente tesis. Esto es, se da una visión amplia de la problemática a tratar, además de describir el alcance de cada capítulo de la misma. En el capítulo 2, se presenta una breve descripción de los fundamentos y conceptos generales de los huecos de tensión. Los mismos, buscan brindar al lector de una mejor comprensión de los términos e indicadores más empleados en el análisis de severidad de los huecos de tensión en las redes eléctricas. Asimismo, a manera de antecedente, se presenta un resumen de las principales características de las técnicas o métodos existentes aplicados en la predicción y monitorización óptima de los huecos de tensión. En el capítulo 3, se busca fundamentalmente conocer la importancia de las variables que determinen la frecuencia o severidad de los huecos de tensión. Para ello, se ha implementado una herramienta de estimación de huecos de tensión que, a través de un conjunto predeterminado de experimentos mediante la técnica denominada Diseño de experimentos, analiza la importancia de la parametrización de las variables de entrada del modelo. Su análisis, es realizado mediante la técnica de análisis de la varianza (ANOVA), la cual permite establecer con rigor matemático si la caracterización de una determinada variable afecta o no la respuesta del sistema en términos de los huecos de tensión. En el capítulo 4, se propone una metodología que permite predecir la severidad de los huecos de tensión de todo el sistema a partir de los registros de huecos de un conjunto reducido de nudos de dicha red. Para ello, se emplea el teorema de probabilidad condicional de Bayes, el cual calcula las medidas más probables de todo el sistema a partir de la información proporcionada por los medidores de huecos instalados. Asimismo, en este capítulo se revela una importante propiedad de los huecos de tensión, como es la correlación del número de eventos de huecos de tensión en diversas zonas de las redes eléctricas. En el capítulo 5, se desarrollan dos métodos de localización óptima de medidores de huecos de tensión. El primero, que es una evolución metodológica del criterio de observabilidad; aportando en el realismo de la pseudo-monitorización de los huecos de tensión con la que se calcula el conjunto óptimo de medidores y, por ende, en la fiabilidad del método. Como una propuesta alternativa, se emplea la propiedad de correlación de los eventos de huecos de tensión de una red para plantear un método que permita establecer la severidad de los huecos de todo el sistema a partir de una monitorización parcial de dicha red. Finalmente, en el capítulo 6, se realiza una breve descripción de las principales aportaciones de los estudios realizados en esta tesis. Adicionalmente, se describen diversos temas a desarrollar en futuros trabajos. III. RESULTADOS En base a las pruebas realizadas en las tres redes planteadas; dos redes de prueba IEEE de 24 y 118 nudos (IEEE-24 e IEEE-118), además del sistema eléctrico de la República del Ecuador de 357 nudos (EC-357), se describen los siguientes puntos como las observaciones más relevantes: A. Estimación de huecos de tensión en ausencia de medidas: Se implementa un método estocástico de estimación de huecos de tensión denominado PEHT, el cual representa con mayor realismo la simulación de los eventos de huecos de un sistema a largo plazo. Esta primera propuesta de la tesis, es considerada como un paso clave para el desarrollo de futuros métodos del presente trabajo, ya que permite emular de forma fiable los registros de huecos de tensión a largo plazo en una red genérica. Entre las novedades más relevantes del mencionado Programa de Estimación de Huecos de Tensión (PEHT) se tienen: - Considerar el efecto combinado de cinco variables aleatorias de entrada para simular los eventos de huecos de tensión en una pseudo-monitorización a largo plazo. Las variables de entrada modeladas en la caracterización de los huecos de tensión en el PEHT son: (i) coeficiente de fallo, (ii) impedancia de fallo, (iii) tipo de fallo, (iv) localización del fallo y (v) duración. - El modelado estocástico de las variables de entrada impedancia de fallo y duración en la caracterización de los eventos de huecos de tensión. Para la parametrización de las variables mencionadas, se realizó un estudio detallado del comportamiento real de las mismas en los sistemas eléctricos. Asimismo, se define la función estadística que mejor representa la naturaleza aleatoria de cada variable. - Considerar como variables de salida del PEHT a indicadores de severidad de huecos de uso común en las normativas, como es el caso de los índices: SARFI-X, SARFI-Curve, etc. B. Análisis de sensibilidad de los huecos de tensión: Se presenta un estudio causa-efecto (análisis de sensibilidad) de las variables de entrada de mayor divergencia en su parametrización entre las referencias relacionadas a la estimación de los huecos de tensión en redes eléctricas. De forma específica, se profundiza en el estudio de la influencia de la parametrización de las variables coeficiente de fallo e impedancia de fallo en la predicción de los huecos de tensión. A continuación un resumen de las conclusiones más destacables: - La precisión de la variable de entrada coeficiente de fallo se muestra como un parámetro no influyente en la estimación del número de huecos de tensión (SARFI-90 y SARFI-70) a largo plazo. Es decir, no se requiere de una alta precisión del dato tasa de fallo de los elementos del sistema para obtener una adecuada estimación de los huecos de tensión. - La parametrización de la variable impedancia de fallo se muestra como un factor muy sensible en la estimación de la severidad de los huecos de tensión. Por ejemplo, al aumentar el valor medio de esta variable aleatoria, se disminuye considerablemente la severidad reportada de los huecos en la red. Por otra parte, al evaluar el parámetro desviación típica de la impedancia de fallo, se observa una relación directamente proporcional de este parámetro con la severidad de los huecos de tensión de la red. Esto es, al aumentar la desviación típica de la impedancia de fallo, se evidencia un aumento de la media y de la variación interanual de los eventos SARFI-90 y SARFI-70. - En base al análisis de sensibilidad desarrollado en la variable impedancia de fallo, se considera muy cuestionable la fiabilidad de los métodos de estimación de huecos de tensión que omiten su efecto en el modelo planteado. C. Estimación de huecos de tensión en base a la información de una monitorización parcial de la red: Se desarrolla un método que emplea los registros de una red parcialmente monitorizada para determinar la severidad de los huecos de todo el sistema eléctrico. A partir de los casos de estudio realizados, se observa que el método implementado (PEHT+MP) posee las siguientes características: - La metodología propuesta en el PEHT+MP combina la teoría clásica de cortocircuitos con diversas técnicas estadísticas para estimar, a partir de los datos de los medidores de huecos instalados, las medidas de huecos de los nudos sin monitorización de una red genérica. - El proceso de estimación de los huecos de tensión de la zona no monitorizada de la red se fundamenta en la aplicación del teorema de probabilidad condicional de Bayes. Es decir, en base a los datos observados (los registros de los nudos monitorizados), el PEHT+MP calcula de forma probabilística la severidad de los huecos de los nudos sin monitorización del sistema. Entre las partes claves del procedimiento propuesto se tienen los siguientes puntos: (i) la creación de una base de datos realista de huecos de tensión a través del Programa de Estimación de Huecos de Tensión (PEHT) propuesto en el capítulo anterior; y, (ii) el criterio de máxima verosimilitud empleado para estimar las medidas de huecos de los nudos sin monitorización de la red evaluada. - Las predicciones de medidas de huecos de tensión del PEHT+MP se ven potenciadas por la propiedad de correlación de los huecos de tensión en diversas zonas de un sistema eléctrico. Esta característica intrínseca de las redes eléctricas limita de forma significativa la respuesta de las zonas fuertemente correlacionadas del sistema ante un eventual hueco de tensión. Como el PEHT+MP está basado en principios probabilísticos, la reducción del rango de las posibles medidas de huecos se ve reflejado en una mejor predicción de las medidas de huecos de la zona no monitorizada. - Con los datos de un conjunto de medidores relativamente pequeño del sistema, es posible obtener estimaciones precisas (error nulo) de la severidad de los huecos de la zona sin monitorizar en las tres redes estudiadas. - El PEHT+MP se puede aplicar a diversos tipos de indicadores de severidad de los huecos de tensión, como es el caso de los índices: SARFI-X, SARFI-Curve, SEI, etc. D. Localización óptima de medidores de huecos de tensión: Se plantean dos métodos para ubicar de forma estratégica al sistema de monitorización de huecos en una red genérica. La primera propuesta, que es una evolución metodológica de la localización óptima de medidores de huecos basada en el criterio de observabilidad (LOM+OBS); y, como segunda propuesta, un método que determina la localización de los medidores de huecos según el criterio del área de correlación (LOM+COR). Cada método de localización óptima de medidores propuesto tiene un objetivo concreto. En el caso del LOM+OBS, la finalidad del método es determinar el conjunto óptimo de medidores que permita registrar todos los fallos que originen huecos de tensión en la red. Por otro lado, en el método LOM+COR se persigue definir un sistema óptimo de medidores que, mediante la aplicación del PEHT+MP (implementado en el capítulo anterior), sea posible estimar de forma precisa las medidas de huecos de tensión de todo el sistema evaluado. A partir del desarrollo de los casos de estudio de los citados métodos de localización óptima de medidores en las tres redes planteadas, se describen a continuación las observaciones más relevantes: - Como la generación de pseudo-medidas de huecos de tensión de los métodos de localización óptima de medidores (LOM+OBS y LOM+COR) se obtienen mediante la aplicación del algoritmo PEHT, la formulación del criterio de optimización se realiza en base a una pseudo-monitorización realista, la cual considera la naturaleza aleatoria de los huecos de tensión a través de las cinco variables estocásticas modeladas en el PEHT. Esta característica de la base de datos de pseudo-medidas de huecos de los métodos LOM+OBS y LOM+COR brinda una mayor fiabilidad del conjunto óptimo de medidores calculado respecto a otros métodos similares en la bibliografía. - El conjunto óptimo de medidores se determina según la necesidad del operador de la red. Esto es, si el objetivo es registrar todos los fallos que originen huecos de tensión en el sistema, se emplea el criterio de observabilidad en la localización óptima de medidores de huecos. Por otra parte, si se plantea definir un sistema de monitorización que permita establecer la severidad de los huecos de tensión de todo el sistema en base a los datos de un conjunto reducido de medidores de huecos, el criterio de correlación resultaría el adecuado. De forma específica, en el caso del método LOM+OBS, basado en el criterio de observabilidad, se evidenciaron las siguientes propiedades en los casos de estudio realizados: - Al aumentar el tamaño de la red, se observa la tendencia de disminuir el porcentaje de nudos monitorizados de dicho sistema. Por ejemplo, para monitorizar los fallos que originan huecos en la red IEEE-24, se requiere monitorizar el 100\% de los nudos del sistema. En el caso de las redes IEEE-118 y EC-357, el método LOM+OBS determina que con la monitorización de un 89.5% y 65.3% del sistema, respectivamente, se cumpliría con el criterio de observabilidad del método. - El método LOM+OBS permite calcular la probabilidad de utilización del conjunto óptimo de medidores a largo plazo, estableciendo así un criterio de la relevancia que tiene cada medidor considerado como óptimo en la red. Con ello, se puede determinar el nivel de precisión u observabilidad (100%, 95%, etc.) con el cual se detectarían los fallos que generan huecos en la red estudiada. Esto es, al aumentar el nivel de precisión de detección de los fallos que originan huecos, se espera que aumente el número de medidores requeridos en el conjunto óptimo de medidores calculado. - El método LOM+OBS se evidencia como una técnica aplicable a todo tipo de sistema eléctrico (radial o mallado), el cual garantiza la detección de los fallos que originan huecos de tensión en un sistema según el nivel de observabilidad planteado. En el caso del método de localización óptima de medidores basado en el criterio del área de correlación (LOM+COR), las diversas pruebas realizadas evidenciaron las siguientes conclusiones: - El procedimiento del método LOM+COR combina los métodos de estimación de huecos de tensión de capítulos anteriores (PEHT y PEHT+MP) con técnicas de optimización lineal para definir la localización óptima de los medidores de huecos de tensión de una red. Esto es, se emplea el PEHT para generar los pseudo-registros de huecos de tensión, y, en base al criterio planteado de optimización (área de correlación), el LOM+COR formula y calcula analíticamente el conjunto óptimo de medidores de la red a largo plazo. A partir de la información registrada por este conjunto óptimo de medidores de huecos, se garantizaría una predicción precisa de la severidad de los huecos de tensión de todos los nudos del sistema con el PEHT+MP. - El método LOM+COR requiere un porcentaje relativamente reducido de nudos del sistema para cumplir con las condiciones de optimización establecidas en el criterio del área de correlación. Por ejemplo, en el caso del número total de huecos (SARFI-90) de las redes IEEE-24, IEEE-118 y EC-357, se calculó un conjunto óptimo de 9, 12 y 17 medidores de huecos, respectivamente. Es decir, solamente se requeriría monitorizar el 38\%, 10\% y 5\% de los sistemas indicados para supervisar los eventos SARFI-90 en toda la red. - El método LOM+COR se muestra como un procedimiento de optimización versátil, el cual permite reducir la dimensión del sistema de monitorización de huecos de redes eléctricas tanto radiales como malladas. Por sus características, este método de localización óptima permite emular una monitorización integral del sistema a través de los registros de un conjunto pequeño de monitores. Por ello, este nuevo método de optimización de medidores sería aplicable a operadores de redes que busquen disminuir los costes de instalación y operación del sistema de monitorización de los huecos de tensión. ABSTRACT I. GENERALITIES 1.1. Introduction Among the various types of electrical disturbances, voltage sags are considered the most common quality problem in power systems. This phenomenon is caused by an extreme increase of the current in the network, primarily caused by short-circuits or inadequate maneuvers in the system. This type of electrical disturbance is basically characterized by two parameters: residual voltage and duration. Typically, voltage sags occur when the residual voltage, in some phases, reaches a value between 0.01 to 0.9 pu and lasts up to 60 seconds. To an end user, the most important effect of a voltage sags is the interruption or alteration of their equipment operation, with electronic devices the most affected (e.g. computer, drive controller, PLC, relay, etc.). Due to the technology boom of recent decades and the constant search for automating production processes, the use of electronic components is essential today. This fact makes the effects of voltage sags more noticeable to the end user, causing the level of demand for a quality energy supply to be increased. In general, the study of voltage sags is usually approached from one of two aspects: the load or the network. From the point of view of the load, it is necessary to know the sensitivity characteristics of the equipment to model their response to sudden changes in power supply voltage. From the perspective of the network, the goal is to estimate or obtain adequate information to characterize the network behavior in terms of voltage sags. In this thesis, the work presented fits into the second aspect; that is, in the modeling and estimation of the response of a power system to voltage sag events. 1.2. Problem Statement Although voltage sags are the most frequent quality supply problem in electrical networks, thistype of disturbance remains complex and challenging to analyze properly. Among the most common reasons for this difficulty are: - The sag monitoring time, because it can take up to several years to get a statistically valid sample. - The limitation of funds for the acquisition and installation of sag monitoring equipment. - The high operating costs involved in the analysis of the voltage sag data from the installed monitors. - The restrictions that electrical companies have with the registered power quality data. That is, given the lack of data to further voltage sag analysis, it is of interest to electrical utilities and researchers to create reliable methods to deepen the study, estimation and monitoring of this electromagnetic phenomenon. Voltage sags, being mainly caused by random events such as short-circuits, are the result of various exogenous variables such as: (i) the number of faults of a system element, (ii) the impedance of the contact material, (iii) the fault type, (iv) the fault location, (v) the duration of the event, etc. That is, to properly raise any theoretical model of voltage sags, it is necessary to represent the combined uncertainty of variables to provide realistic methods that are reliable for users. 1.3. Objective This Thesis has been aimed at developing various stochastic methods for the study, estimation and monitoring of voltage sags in electrical power systems. Specifically, it has deepened the research in the following areas: - This research furthers knowledge in the realistic modeling of the variables that influence sag characterization. This thesis proposes a method to credibly represent the quantification and randomness of the sags in time by using parametric probability distributions. From this, a software tool was created to estimate the severity of voltage sags in a generic power system. - This research also analyzes the influence of the input variables in the estimation of voltage sags. In this case, the study has focused on the variables of greatest divergence in their characterization of the existing proposals. - A method was developed to estimate the number of voltage sags of an area without monitoring through the information of a limited set of sag monitors in an electrical system. To this end, the principles of Bayesian statistics are applied, estimating the number of sags most likely to happen in a system busbar based in records of other sag network busbars. - A strategy was developed to optimize the monitorization of voltage sags on a power system. Its purpose is to ensure the monitoring of the system through a number of monitors lower than the number of busbars of the network assessed. II. THESIS STRUCTURE To describe in detail the aforementioned proposals, this Thesis has been structured into six chapters. Below is are brief descriptions of them: As an introductory chapter, Chapter 1, provides a description of the approach and structure of this thesis. It presents a wide view of the problem to be treated, in addition to the description of the scope of each chapter. In Chapter 2, a brief description of the fundamental and general concepts of voltage sags is presented to provide to the reader a better understanding of the terms and indicators used in the severity analysis of voltage sags in power networks. Also, by way of background, a summary of the main features of existing techniques or methods used in the prediction and optimal monitoring of voltage sags is also presented. Chapter 3 essentially seeks to know the importance of the variables that determine the frequency or severity of voltage sags. To do this, a tool to estimate voltage sags is implemented that, through a predetermined set of experiments using the technique called Design of Experiments, discusses the importance of the parameters of the input variables of the model. Its analysis is interpreted by using the technique of analysis of variance (ANOVA), which provides mathematical rigor to establish whether the characterization of a particular variable affects the system response in terms of voltage sags or not. In Chapter 4, a methodology to predict the severity of voltage sags of an entire system through the sag logs of a reduced set of monitored busbars is proposed. For this, the Bayes conditional probability theorem is used, which calculates the most likely sag severity of the entire system from the information provided by the installed monitors. Also, in this chapter an important property of voltage sags is revealed, as is the correlation of the voltage sags events in several zones of a power system. In Chapter 5, two methods of optimal location of voltage sag monitors are developed. The first one is a methodological development of the observability criteria; it contributes to the realism of the sag pseudo-monitoring with which the optimal set of sag monitors is calculated and, therefore, to the reliability of the proposed method. As an alternative proposal, the correlation property of the sag events of a network is used to raise a method that establishes the sag severity of the entire system from a partial monitoring of the network. Finally, in Chapter 6, a brief description of the main contributions of the studies in this Thesis is detailed. Additionally, various themes to be developed in future works are described. III. RESULTS. Based on tests on the three networks presented, two IEEE test networks of 24 and 118 busbars (IEEE-24 and IEEE-118) and the electrical system of the Republic of Ecuador (EC-357), the following points present the most important observations: A. Estimation of voltage sags in the absence of measures: A stochastic estimation method of voltage sags, called PEHT, is implemented to represent with greater realism the long-term simulation of voltage sags events in a system. This first proposal of this thesis is considered a key step for the development of future methods of this work, as it emulates in a reliable manner the voltage sag long-term records in a generic network. Among the main innovations of this voltage sag estimation method are the following: - Consideration of the combined effect of five random input variables to simulate the events of voltage sags in long-term monitoring is included. The input variables modeled in the characterization of voltage sags on the PEHT are as follows: (i) fault coefficient, (ii) fault impedance, (iii) type of fault, (iv) location of the fault, and (v) fault duration. - Also included is the stochastic modeling of the input variables of fault impedance and duration in the characterization of the events of voltage sags. For the parameterization of these variables, a detailed study of the real behavior in power systems is developed. Also, the statistical function best suited to the random nature of each variable is defined. - Consideration of sag severity indicators used in standards as PEHT output variables, including such as indices as SARFI-X, SARFI-Curve, etc. B. Sensitivity analysis of voltage sags: A cause-effect study (sensitivity analysis) of the input variables of greatest divergence between reference parameterization related to the estimation of voltage sags in electrical networks is presented. Specifically, it delves into the study of the influence of the parameterization of the variables fault coefficient and fault impedance in the voltage sag estimation. Below is a summary of the most notable observations: - The accuracy of the input variable fault coefficient is shown as a non-influential parameter in the long-term estimation of the number of voltage sags (SARFI-90 and SARFI-70). That is, it does not require a high accuracy of the fault rate data of system elements for a proper voltage sag estimation. - The parameterization of the variable fault impedance is shown to be a very sensitive factor in the estimation of the voltage sag severity. For example, by increasing the average value of this random variable, the reported sag severity in the network significantly decreases. Moreover, in assessing the standard deviation of the fault impedance parameter, a direct relationship of this parameter with the voltage sag severity of the network is observed. That is, by increasing the fault impedance standard deviation, an increase of the average and the interannual variation of the SARFI-90 and SARFI-70 events is evidenced. - Based on the sensitivity analysis developed in the variable fault impedance, the omission of this variable in the voltage sag estimation would significantly call into question the reliability of the responses obtained. C. Voltage sag estimation from the information of a network partially monitored: A method that uses the voltage sag records of a partially monitored network for the sag estimation of all the power system is developed. From the case studies performed, it is observed that the method implemented (PEHT+MP) has the following characteristics: - The methodology proposed in the PEHT+MP combines the classical short-circuit theory with several statistical techniques to estimate, from data the of the installed sag meters, the sag measurements of unmonitored busbars of a generic power network. - The estimation process of voltage sags of the unmonitored zone of the network is based on the application of the conditional probability theorem of Bayes. That is, based on the observed data (monitored busbars records), the PEHT+MP calculates probabilistically the sag severity at unmonitored system busbars. Among the key parts of the proposed procedure are the following: (i) the creation of a realistic data base of voltage sags through of the sag estimation program (PEHT); and, (ii) the maximum likelihood criterion used to estimate the sag indices of system busbars without monitoring. - The voltage sag measurement estimations of PEHT+MP are potentiated by the correlation property of the sag events in power systems. This inherent characteristic of networks significantly limits the response of strongly correlated system zones to a possible voltage sag. As the PEHT+MP is based on probabilistic principles, a reduction of the range of possible sag measurements is reflected in a better sag estimation of the unmonitored area of the power system. - From the data of a set of monitors representing a relatively small portion of the system, to obtain accurate estimations (null error) of the sag severity zones without monitoring is feasible in the three networks studied. - The PEHT+MP can be applied to several types of sag indices, such as: SARFI-X, SARFI-Curve, SEI, etc. D. Optimal location of voltage sag monitors in power systems: Two methods for strategically locating the sag monitoring system are implemented for a generic network. The first proposal is a methodological development of the optimal location of sag monitors based on the observability criterion (LOM + OBS); the second proposal is a method that determines the sag monitor location according to the correlation area criterion (LOM+COR). Each proposed method of optimal location of sag monitors has a specific goal. In the case of LOM+OBS, the purpose of the method is to determine the optimal set of sag monitors to record all faults that originate voltage sags in the network. On the other hand, the LOM+COR method attempts to define the optimal location of sag monitors to estimate the sag indices in all the assessed network with the PEHT+MP application. From the development of the case studies of these methods of optimal location of sag monitors in the three networks raised, the most relevant observations are described below: - As the generation of voltage sag pseudo-measurements of the optimal location methods (LOM+OBS and LOM+COR) are obtained by applying the algorithm PEHT, the formulation of the optimization criterion is performed based on a realistic sag pseudo-monitoring, which considers the random nature of voltage sags through the five stochastic variables modeled in PEHT. This feature of the database of sag pseudo-measurements of the LOM+OBS and LOM+COR methods provides a greater reliability of the optimal set of monitors calculated when compared to similar methods in the bibliography. - The optimal set of sag monitors is determined by the network operator need. That is, if the goal is to record all faults that originate from voltage sags in the system, the observability criterion is used to determine the optimal location of sag monitors (LOM+OBS). Moreover, if the objective is to define a monitoring system that allows establishing the sag severity of the system from taken from information based on a limited set of sag monitors, the correlation area criterion would be appropriate (LOM+COR). Specifically, in the case of the LOM+OBS method (based on the observability criterion), the following properties were observed in the case studies: - By increasing the size of the network, there was observed a reduction in the percentage of monitored system busbars required. For example, to monitor all the faults which cause sags in the IEEE-24 network, then 100% of the system busbars are required for monitoring. In the case of the IEEE-118 and EC-357 networks, the method LOM+OBS determines that with monitoring 89.5 % and 65.3 % of the system, respectively, the observability criterion of the method would be fulfilled. - The LOM+OBS method calculates the probability of using the optimal set of sag monitors in the long term, establishing a relevance criterion of each sag monitor considered as optimal in the network. With this, the level of accuracy or observability (100%, 95%, etc.) can be determined, with which the faults that caused sags in the studied network are detected. That is, when the accuracy level for detecting faults that cause sags in the system is increased, a larger number of sag monitors is expected when calculating the optimal set of monitors. - The LOM + OBS method is demonstrated to be a technique applicable to any type of electrical system (radial or mesh), ensuring the detection of faults that cause voltage sags in a system according to the observability level raised. In the case of the optimal localization of sag monitors based on the criterion of correlation area (LOM+COR), several tests showed the following conclusions: - The procedure of LOM+COR method combines the implemented algorithms of voltage sag estimation (PEHT and PEHT+MP) with linear optimization techniques to define the optimal location of the sag monitors in a network. That is, the PEHT is used to generate the voltage sag pseudo-records, and, from the proposed optimization criterion (correlation area), the LOM+COR formulates and analytically calculates the optimal set of sag monitors of the network in the long term. From the information recorded by the optimal set of sag monitors, an accurate prediction of the voltage sag severity at all the busbars of the system is guaranteed with the PEHT+MP. - The LOM + COR method is shown to be a versatile optimization procedure, which reduces the size of the sag monitoring system both at radial as meshed grids. Due to its characteristics, this optimal location method allows emulation of complete system sag monitoring through the records of a small optimal set of sag monitors. Therefore, this new optimization method would be applicable to network operators that looks to reduce the installation and operation costs of the voltage sag monitoring system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The ESS-Bilbao facility, hosted by the University of the Basque Country (UPV/EHU), envisages the operation of a high-current proton accelerator delivering beams with energies up to 50 MeV. The time-averaged proton current will be 2.25 mA, delivered by 1.5 ms proton pulses with a repetition rate of 20 Hz. This beam will feed a neutron source based upon the Be (p,n) reaction, which will enable the provision of relevant neutron experimentation capabilities. The neutron source baseline concept consists in a rotating beryllium target cooled by water. The target structure will comprise a rotatable disk made of 6061-T6 aluminium alloy holding 20 beryllium plates. Heat dissipation from the target relies upon a distribution of coolant-flow channels. The practical implementation of such a concept is here described with emphasis put on the beryllium plates thermo-mechanical optimization, the chosen coolant distribution system as well as the mechanical behavior of the assembly.