2 resultados para 46BS1986-1_14

em Universidad Politécnica de Madrid


Relevância:

10.00% 10.00%

Publicador:

Resumo:

In order to manage properly ontology development projects in complex settings and to apply correctly the NeOn Methodology, it is crucial to have knowledge of the entire ontology development life cycle before starting the development projects. The ontology project plan and scheduling helps the ontology development team to have this knowledge and to monitor the project execution. To facilitate the planning and scheduling of ontology development projects, the NeOn Toolkit plugin called gOntt has been developed. gOntt is a tool that supports the scheduling of ontology network development projects and helps to execute them. In addition, prescriptive methodological guidelines for scheduling ontology development projects using gOntt are provided.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The project to verify the performance of space tether technology was successfully demonstrated by the launch of the sounding rocket S520 the 25tu. The project is the space demonstration of science and engineering technologies of a bare tape electrodynamic tether (EDT) in the international campaign between Japan, USA, Europe and Australia. Method of "Inverse ORIGAMI (Tape tether folding)" was employed in order to deploy the bare tape EDT in a short period time of the suborbital flight. The deployment of tape tether was tested in a various experimental schemes on ground to show high reliability of tape tether deployment. The rocket was launched on the summer of 2010 and deployed a bare electro-dynamic tape tether with length 132.6 m, which is the world record of the length deployment of tape tether. The verification of tether technology has found a variety kind of science and technology results as the first in the humankind and will lead a large number of applications of space tether technologies