48 resultados para Honduras interoceanic railway.
Resumo:
This paper focuses on the design of railway timetables considering a variable elastic demand profile along a whole design day. Timetabling is the third stage in the classical hierarchical railway planning process. Most of previous works on this topic consider a uniform demand behavior for short planning intervals. In this paper, we propose a MINLP model for designing non-periodic timetables on a railway corridor where demand is dependent on waiting times. In the elastic demand case, long waiting times lead to a loss of passengers, who may select an alternative transportation mode. The mode choice is modeled using two alternative methods. The first one is based on a sigmoid function and can be used in case of absence of information for competitor modes. In the second one, the mode choice probability is obtained using a Logit model that explicitly considers the existence of a main alternative mode. With the purpose of obtaining optimal departure times, in both cases, a minimization of the loss of passengers is used as objective function. Finally, as illustration, the timetabling MINLP model with both mode choice methods is applied to a real case and computational results are shown.
Resumo:
The analysis of the running safety of railway vehicles on viaducts subject to strong lateral actions such as cross winds requires coupled nonlinear vehicle-bridge interaction models, capable to study extreme events. In this paper original models developed by the authors are described, based on finite elements for the structure, multibody and finite element models for the vehicle, and specially developed interaction elements for the interface between wheel and rail. The models have been implemented within ABAQUS and have full nonlinear capabilities for the structure, the vehicle and the contact interface. An application is developed for the Ulla Viaduct, a 105 m tall arch in the Spanish high-speed railway network. The dynamic analyses allow obtaining critical wind curves, which define the running safety conditions for a given train in terms of speed of circulation and wind speed
Resumo:
The location of ground faults in railway electric lines in 2 × 5 kV railway power supply systems is a difficult task. In both 1 × 25 kV and transmission power systems it is common practice to use distance protection relays to clear ground faults and localize their positions. However, in the particular case of this 2 × 25 kV system, due to the widespread use of autotransformers, the relation between the distance and the impedance seen by the distance protection relays is not linear and therefore the location is not accurate enough. This paper presents a simple and economical method to identify the subsection between autotransformers and the conductor (catenary or feeder) where the ground fault is happening. This method is based on the comparison of the angle between the current and the voltage of the positive terminal in each autotransformer. Consequently, after the identification of the subsection and the conductor with the ground defect, only the subsection where the ground fault is present will be quickly removed from service, with the minimum effect on rail traffic. This method has been validated through computer simulations and laboratory tests with positive results.