30 resultados para electric power plant
Resumo:
Europe needs to restructure its energy system. The aim to decrease the reliance on fossil fuels to a higher dependence on renewable energy has now been imposed by The European Commission. In order to achieve this goal there is a great interest in Norway to become "The Green Battery of Europe". In the pursuit of this goal a GIS-tool was created to investigate the pump storage potential in Norway. The tool searches for possible connections between existing reservoirs and dams with the criteria selected by the user. The aim of this thesis was to test the tool and see if the results suggested were plausible, develop a cost calculation method for the PSH lines, and make suggestions for further development of the tool. During the process the tool presented many non-feasible pumped storage hydropower (PSH) connections. The area of Telemark was chosen for the more detailed study. The results were discussed and some improvements were suggested for further development of the tool. Also a sensitivity test was done to see which of the parameters set by the user are the most relevant for the PSH connection suggestion. From a range of the most promising PSH plants suggested by the tool, the one between Songavatn and Totak was chosen for a case study, where there already exists a power plant between both reservoirs. A new Pumped Storage Plant was designed with a power production of 1200 MW. There are still many topics open to discussion, such as how to deal with environmental restrictions, or how to deal with inflows and outflows of the reservoirs from the existing power plants. Consequently the GIS-tool can be a very useful tool to establish the best possible connections between existing reservoirs and dams, but it still needs a deep study and the creation of new parameters for the user.
Resumo:
Solar thermal power plants are usually installed in locations with high yearly average solar radiation, often deserts. In such conditions, cooling water required for thermodynamic cycles is rarely available. Moreover, when solar radiation is high, ambient temperature is very high as well; this leads to excessive condensation temperature, especially when air-condensers are used, and decreases the plant efficiency. However, temperature variation in deserts is often very high, which drives to relatively low temperatures during the night. This fact can be exploited with the use of a closed cooling system, so that the coolant (water) is chilled during the night and store. Chilled water is then used during peak temperature hours to cool the condenser (dry cooling), thus enhancing power output and efficiency. The present work analyzes the performance improvement achieved by night thermal cool storage, compared to its equivalent air cooled power plant. Dry cooling is proved to be energy-effective for moderately high day–night temperature differences (20 °C), often found in desert locations. The storage volume requirement for different power plant efficiencies has also been studied, resulting on an asymptotic tendency.
Resumo:
En el presente trabajo se estudia la producción potencial de biomasa procedente de los cultivos de centeno y triticale en las seis comarcas agrarias de la Comunidad de Madrid (CM) y la posibilidad de su aplicación a la producción de bioelectricidad en cada una de ellas. En primer lugar se realiza un estudio bibliográfico de la situación actual de la bioelectricidad. Uno de los principales datos a tener en cuenta es que en el PER 2011- 2020 se estima que el total de potencia eléctrica instalada a partir de biomasa en España en el año 2020 sea de 1.350 MW, unas dos veces y media la existente a finales de 2010. Además, se comenta el estado de la incentivación del uso de biomasa de cultivos energéticos para producción de electricidad, la cual se regula actualmente según el Real Decreto-ley 9/2013, de 12 de Julio, por el que se adoptaron medidas urgentes para garantizar la estabilidad financiera del sistema eléctrico, y se consideran los criterios de sostenibilidad en el uso de biocombustibles sólidos. Se realiza una caracterización de las seis comarcas agrarias que forman la Comunidad Autónoma de Madrid: Área Metropolitana, Campiña, Guadarrama, Lozoya- Somosierra, Sur-Occidental y Vegas, la cual consta de dos partes: una descripción de la climatología y otra de la distribución de la superficie dedicada a barbecho y cultivos herbáceos. Se hace una recopilación bibliográfica de los modelos de simulación más representativos de crecimiento de los cultivos (CERES y Cereal YES), así como de ensayos realizados con los cultivos de centeno y triticale para la producción de biomasa y de estudios efectuados mediante herramientas GIS y técnicas de análisis multicriterio para la ubicación de centrales de bioelectricidad y el estudio de la logística de la biomasa. Se propone un modelo de simulación de la productividad de biomasa de centeno y de triticale para la CM, que resulta de la combinación de un modelo de producción de grano en base a datos climatológicos y a la relación biomasa/grano media de ambos cultivos obtenida en una experiencia previa. Los modelos obtenidos responden a las siguientes ecuaciones (siendo TN = temperatura media normalizada a 9,9 ºC y PN = precipitación acumulada normalizada a 496,7 mm): - Producción biomasa centeno (t m.s./ha) = 2,785 * [1,078 * ln(TN + 2*PN) + 2,3256] - Producción biomasa triticale (t m.s./ha) = 2,595 * [2,4495 * ln(TN + 2*PN) + 2,6103] Posteriormente, aplicando los modelos desarrollados, se cuantifica el potencial de producción de biomasa de centeno y triticale en las distintas comarcas agrarias de la CM en cada uno de los escenarios establecidos, que se consideran según el uso de la superficie de barbecho de secano disponible (25%, 50%, 75% y 100%). Las producciones potenciales de biomasa, que se podrían alcanzar en la CM utilizando el 100% de la superficie de barbecho de secano, en base a los cultivos de centeno y triticale, se estimaron en 169.710,72 - 149.811,59 - 140.217,54 - 101.583,01 - 26.961,88 y 1.886,40 t anuales para las comarcas de Campiña - Vegas, Sur - Occidental - Área Metropolitana - Lozoya-Somosierra y Guadarrama, respectivamente. Se realiza un análisis multicriterio basado en la programación de compromiso para definir las comarcas agrarias con mejores características para la ubicación de centrales de bioelectricidad en base a los criterios de potencial de biomasa, infraestructura eléctrica, red de carreteras, espacios protegidos y superficie de núcleos urbanos. Al efectuar el análisis multicriterio, se obtiene la siguiente ordenación jerárquica en base a los criterios establecidos: Campiña, Sur Occidental, Vegas, Área Metropolitana, Lozoya-Somosierra y Guadarrama. Mediante la utilización de técnicas GIS se estudia la localización más conveniente de una central de bioelectricidad de 2,2 MW en cada una de las comarcas agrarias y según el uso de la superficie de barbecho de secano disponible (25%, 50%, 75% y 100%), siempre que exista potencial suficiente. Para el caso de la biomasa de centeno y de triticale en base seca se considera un PCI de 3500 kcal/kg, por lo que se necesitarán como mínimo 17.298,28 toneladas para satisfacer las necesidades de cada una de las centrales de 2,2 MW. Se analiza el potencial máximo de bioelectricidad en cada una de las comarcas agrarias en base a los cultivos de centeno y triticale como productores de biomasa. Según se considere el 25% o el 100% del barbecho de secano para producción de biomasa, la potencia máxima de bioelectricidad que se podría instalar en cada una de las comarcas agrarias variaría entre 5,4 y 21,58 MW en la comarca Campiña, entre 4,76 y 19,05 MW en la comarca Vegas, entre 4,46 y 17,83 MW en la comarca Sur Occidental, entre 3,23 y 12,92 MW en la comarca Área Metropolitana, entre 0,86 y 3,43 MW en la comarca Lozoya Somosierra y entre 0,06 y 0,24 MW en la comarca Guadarrama. La potencia total que se podría instalar en la CM a partir de la biomasa de centeno y triticale podría variar entre 18,76 y 75,06 MW según que se utilice el 25% o el 100% de las tierras de barbecho de secano para su cultivo. ABSTRACT In this work is studied the potential biomass production from rye and triticale crops in the six Madrid Community (MC) agricultural regions and the possibility of its application to the bioelectricity production in each of them. First is performed a bibliographical study of the current situation of bioelectricity. One of the main elements to be considered is that in the PER 2011-2020 is estimated that the total installed electric power from biomass in Spain in 2020 was 1.350 MW, about two and a half times as at end 2010. Also is discussed the status of enhancing the use of biomass energy crops for electricity production, which is currently regulated according to the Real Decreto-ley 9/2013, of July 12, by which urgent measures were adopted to ensure financial stability of the electrical system, and there are considered the sustainability criteria in the use of solid biofuels. A characterization of the six Madrid Community agricultural regions is carried out: Area Metropolitana, Campiña, Guadarrama, Lozoya-Somosierra, Sur-Occidental and Vegas, which consists of two parts: a description of the climatology and another about the distribution of the area under fallow and arable crops. It makes a bibliographic compilation of the most representative crop growth simulation models (CERES and Cereal YES), as well as trials carried out with rye and triticale crops for biomass production and studies conducted by GIS tools and techniques multicriteria analysis for the location of bioelectricity centrals and the study of the logistics of biomass. Is proposed a biomass productivity simulation model for rye and triticale for MC that results from the combination of grain production model based on climatological data and the average relative biomass/grain of both crops obtained in a prior experience. The models obtained correspond to the following equations (where TN = normalized average temperature and PN = normalized accumulated precipitation): - Production rye biomass (t d.m./ha) = 2.785 * [1.078 * ln (TN + 2*PN) + 2.3256] - Production triticale biomass (t d.m./ha) = 2,595 * [2.4495 * ln (TN + 2*PN) + 2.6103] Subsequently, applying the developed models, the biomass potential of the MC agricultural regions is quantified in each of the scenarios established, which are considered as the use of dry fallow area available (25%, 50%, 75 % and 100%). The potential biomass production that can be achieved within the MC using 100% of the rainfed fallow area based on rye and triticale crops, were estimated at 169.710,72 - 149.811,59 - 140.217,54 - 101.583,01 - 26.961,88 and 1.886,40 t annual for the regions of Campiña, Vegas, Sur Occidental, Area Metropolitana, Lozoya- Somosierra and Guadarrama, respectively. A multicriteria analysis is performed, based on compromise programming to define the agricultural regions with better features for the location of bioelectricity centrals, on the basis of biomass potential, electrical infrastructure, road network, protected areas and urban area criteria. Upon multicriteria analysis, is obtained the following hierarchical order based on criteria: Campiña, Sur Occidental, Vegas, Area Metropolitana, Lozoya-Somosierra and Guadarrama. Likewise, through the use of GIS techniques, the most suitable location for a 2,2 MW bioelectricity plant is studied in each of the agricultural regions and according to the use of dry fallow area available (25%, 50% , 75% and 100%), if there is sufficient potential. In the case of biomass rye and triticale dry basis is considered a PCI of 3500 kcal/kg, so it will take at least 17,298.28 t to satisfy the needs of each plant. Is analyzed the maximum bioelectricity potential on each of the agricultural regions on the basis of the rye and triticale crops as biomass producers. As deemed 25% or 100% dry fallow for biomass, the maximum bioelectricity potential varies between 5,4 and 21,58 MW in the Campiña region, between 4,76 and 19,05 MW in the Vegas region, between 4,46 and 17,83 MW in the Sur Occidental region, between 3,23 and 12,92 MW in the Area Metropolitana region, between 0,86 and 3,43 MW in the Lozoya-Somosierra region and between 0,06 and 0,24 MW in the Guadarrama region. The total power that could be installed in the CM from rye and triticale biomass could vary between 18.76 and 75.06 MW if is used the 25% or 100% of fallow land for rainfed crop.
Resumo:
En el artículo se discute el papel de la energía hidroeléctrica en el marco del sistema eléctrico español, donde existe una elevada penetración de energías no gestionables con una tendencia clara a aumentar en los próximos años. El desarrollo de nuevas centrales hidroeléctricas se basará probablemente en centrales reversibles. La energía hidroeléctrica es una tecnología madura y eficiente para el almacenamiento de energía a gran escala y contribuye por tanto de manera decisiva a la integración de fuentes renovables no gestionables. Los beneficios obtenidos con la operación punta-valle pueden ser insuficientes para compensar el coste de una nueva central. Sin embargo, los ingresos obtenidos pueden incrementarse sustancialmente mediante su participación en los servicios de ajuste del sistema. Ello requeriría un diseño apropiado del mercado eléctrico. La contribución de las centrales hidráulicas reversibles al balance producción-consumo puede extenderse a las horas valle utilizando, bien bombeo en velocidad variable o bien una configuración de cortocircuito hidráulico. La necesidad de mitigar los efectos hidrológicos aguas abajo de las centrales hidroeléctricas puede introducir algunas restricciones en la operación que limitaría de algún modo los servicios descritos más arriba. Sin embargo, cabe esperar que los efectos ambientales provocados por las centrales hidráulicas reversibles sean significativamente menores. In this paper the role of hydropower in electric power systems is discussed, in the framework of the Spanish system, where a high penetration of intermittent power sources exists, showing a clear trend to increase in next years. The development of new hydro power facilities will be likely based on pumped storage hydro power plants. Hydropower is a mature and efficient technology for large-scale energy storage and therefore represents a key contribution for the integration of intermittent power sources, such as wind or photovoltaic. The benefits obtained from load shifting may be insufficient to compensate the costs of a new plant. However, the obtained revenues can significantly increase through its contribution to providing ancillary services. This would require an appropriate design of the electricity market. The contribution of pumped storage hydro power plants to balancing services can be extended to off-peak hours, using either variable speed pumping or the hydraulic shortcircuit configuration. The need to mitigate hydrological effects downstream of hydro plants may introduce some operational constraints which could limit to some extent the services described above. However environmental effects caused by pumped storage hydro power plants are expected to be significantly smaller.
Resumo:
El alcance de este proyecto es dimensionar un sistema de trigeneración para una industria papelera. El proyecto se realizará en base a la propuesta de la nueva reforma de la ley energética, por la cual no se podrá vender la energía eléctrica generada a la red sino que toda la energía generada ha de ser utilizada de forma exclusiva para autoconsumo. En primer lugar se desarrolla un proceso de selección de los equipos y tecnologías para la cogeneración, que posteriormente servirá para el dimensionamiento de la planta, en el cual se elegirá la tecnología oportuna para la generación de energía eléctrica y energía térmica, tanto en forma de frío como de calor. Con este estudio se podrá calcular el ahorro conseguido por el nuevo sistema propuesto, comparado con los costes de la generación por sistemas convencionales y desde ese ahorro, analizar la rentabilidad y viabilidad del proyecto en función de la inversión inicial que supone dicho proyecto. Abstract The scope of this project is to measure a trigeneration system for paper industry. The project will be based on the proposal of the new reform of the energy law, by which the electricity generated to the network may not be sold but that all the generated energy has to be used exclusively for self-consumption. First of all the study develops a process of selection of the equipment and technologies for cogeneration, which subsequently will be used for the dimensioning of the plant, the result will be an election of the appropriate technology for the generation of electric power and heat energy, both in the form of cold and heat. With this study the savings achieved by the new proposed system will be estimated, compared with costs of conventional generation and from these savings, analized for profitability and viability of the project on the basis of the initial investment involved in this project.
Resumo:
En el campo de la fusión nuclear y desarrollándose en paralelo a ITER (International Thermonuclear Experimental Reactor), el proyecto IFMIF (International Fusion Material Irradiation Facility) se enmarca dentro de las actividades complementarias encaminadas a solucionar las barreras tecnológicas que aún plantea la fusión. En concreto IFMIF es una instalación de irradiación cuya misión es caracterizar materiales resistentes a condiciones extremas como las esperadas en los futuros reactores de fusión como DEMO (DEMOnstration power plant). Consiste de dos aceleradores de deuterones que proporcionan un haz de 125 mA y 40 MeV cada uno, que al colisionar con un blanco de litio producen un flujo neutrónico intenso (1017 neutrones/s) con un espectro similar al de los neutrones de fusión [1], [2]. Dicho flujo neutrónico es empleado para irradiar los diferentes materiales candidatos a ser empleados en reactores de fusión, y las muestras son posteriormente examinadas en la llamada instalación de post-irradiación. Como primer paso en tan ambicioso proyecto, una fase de validación y diseño llamada IFMIFEVEDA (Engineering Validation and Engineering Design Activities) se encuentra actualmente en desarrollo. Una de las actividades contempladas en esta fase es la construcción y operación de una acelarador prototipo llamado LIPAc (Linear IFMIF Prototype Accelerator). Se trata de un acelerador de deuterones de alta intensidad idéntico a la parte de baja energía de los aceleradores de IFMIF. Los componentes del LIPAc, que será instalado en Japón, son suministrados por diferentes países europeos. El acelerador proporcionará un haz continuo de deuterones de 9 MeV con una potencia de 1.125 MW que tras ser caracterizado con diversos instrumentos deberá pararse de forma segura. Para ello se requiere un sistema denominado bloque de parada (Beam Dump en inglés) que absorba la energía del haz y la transfiera a un sumidero de calor. España tiene el compromiso de suministrar este componente y CIEMAT (Centro de Investigaciones Energéticas Medioambientales y Tecnológicas) es responsable de dicha tarea. La pieza central del bloque de parada, donde se para el haz de iones, es un cono de cobre con un ángulo de 3.5o, 2.5 m de longitud y 5 mm de espesor. Dicha pieza está refrigerada por agua que fluye en su superficie externa por el canal que se forma entre el cono de cobre y otra pieza concéntrica con éste. Este es el marco en que se desarrolla la presente tesis, cuyo objeto es el diseño del sistema de refrigeración del bloque de parada del LIPAc. El diseño se ha realizado utilizando un modelo simplificado unidimensional. Se han obtenido los parámetros del agua (presión, caudal, pérdida de carga) y la geometría requerida en el canal de refrigeración (anchura, rugosidad) para garantizar la correcta refrigeración del bloque de parada. Se ha comprobado que el diseño permite variaciones del haz respecto a la situación nominal siendo el flujo crítico calorífico al menos 2 veces superior al nominal. Se han realizado asimismo simulaciones fluidodinámicas 3D con ANSYS-CFX en aquellas zonas del canal de refrigeración que lo requieren. El bloque de parada se activará como consecuencia de la interacción del haz de partículas lo que impide cualquier cambio o reparación una vez comenzada la operación del acelerador. Por ello el diseño ha de ser muy robusto y todas las hipótesis utilizadas en la realización de éste deben ser cuidadosamente comprobadas. Gran parte del esfuerzo de la tesis se centra en la estimación del coeficiente de transferencia de calor que es determinante en los resultados obtenidos, y que se emplea además como condición de contorno en los cálculos mecánicos. Para ello por un lado se han buscado correlaciones cuyo rango de aplicabilidad sea adecuado para las condiciones del bloque de parada (canal anular, diferencias de temperatura agua-pared de decenas de grados). En un segundo paso se han comparado los coeficientes de película obtenidos a partir de la correlación seleccionada (Petukhov-Gnielinski) con los que se deducen de simulaciones fluidodinámicas, obteniendo resultados satisfactorios. Por último se ha realizado una validación experimental utilizando un prototipo y un circuito hidráulico que proporciona un flujo de agua con los parámetros requeridos en el bloque de parada. Tras varios intentos y mejoras en el experimento se han obtenido los coeficientes de película para distintos caudales y potencias de calentamiento. Teniendo en cuenta la incertidumbre de las medidas, los valores experimentales concuerdan razonablemente bien (en el rango de 15%) con los deducidos de las correlaciones. Por motivos radiológicos es necesario controlar la calidad del agua de refrigeración y minimizar la corrosión del cobre. Tras un estudio bibliográfico se identificaron los parámetros del agua más adecuados (conductividad, pH y concentración de oxígeno disuelto). Como parte de la tesis se ha realizado asimismo un estudio de la corrosión del circuito de refrigeración del bloque de parada con el doble fin de determinar si puede poner en riesgo la integridad del componente, y de obtener una estimación de la velocidad de corrosión para dimensionar el sistema de purificación del agua. Se ha utilizado el código TRACT (TRansport and ACTivation code) adaptándalo al caso del bloque de parada, para lo cual se trabajó con el responsable (Panos Karditsas) del código en Culham (UKAEA). Los resultados confirman que la corrosión del cobre en las condiciones seleccionadas no supone un problema. La Tesis se encuentra estructurada de la siguiente manera: En el primer capítulo se realiza una introducción de los proyectos IFMIF y LIPAc dentro de los cuales se enmarca esta Tesis. Además se describe el bloque de parada, siendo el diseño del sistema de rerigeración de éste el principal objetivo de la Tesis. En el segundo y tercer capítulo se realiza un resumen de la base teórica así como de las diferentes herramientas empleadas en el diseño del sistema de refrigeración. El capítulo cuarto presenta los resultados del relativos al sistema de refrigeración. Tanto los obtenidos del estudio unidimensional, como los obtenidos de las simulaciones fluidodinámicas 3D mediante el empleo del código ANSYS-CFX. En el quinto capítulo se presentan los resultados referentes al análisis de corrosión del circuito de refrigeración del bloque de parada. El capítulo seis se centra en la descripción del montaje experimental para la obtención de los valores de pérdida de carga y coeficiente de transferencia del calor. Asimismo se presentan los resultados obtenidos en dichos experimentos. Finalmente encontramos un capítulo de apéndices en el que se describen una serie de experimentos llevados a cabo como pasos intermedios en la obtención del resultado experimental del coeficiente de película. También se presenta el código informático empleado para el análisis unidimensional del sistema de refrigeración del bloque de parada llamado CHICA (Cooling and Heating Interaction and Corrosion Analysis). ABSTRACT In the nuclear fusion field running in parallel to ITER (International Thermonuclear Experimental Reactor) as one of the complementary activities headed towards solving the technological barriers, IFMIF (International Fusion Material Irradiation Facility) project aims to provide an irradiation facility to qualify advanced materials resistant to extreme conditions like the ones expected in future fusion reactors like DEMO (DEMOnstration Power Plant). IFMIF consists of two constant wave deuteron accelerators delivering a 125 mA and 40 MeV beam each that will collide on a lithium target producing an intense neutron fluence (1017 neutrons/s) with a similar spectra to that of fusion neutrons [1], [2]. This neutron flux is employed to irradiate the different material candidates to be employed in the future fusion reactors, and the samples examined after irradiation at the so called post-irradiative facilities. As a first step in such an ambitious project, an engineering validation and engineering design activity phase called IFMIF-EVEDA (Engineering Validation and Engineering Design Activities) is presently going on. One of the activities consists on the construction and operation of an accelerator prototype named LIPAc (Linear IFMIF Prototype Accelerator). It is a high intensity deuteron accelerator identical to the low energy part of the IFMIF accelerators. The LIPAc components, which will be installed in Japan, are delivered by different european countries. The accelerator supplies a 9 MeV constant wave beam of deuterons with a power of 1.125 MW, which after being characterized by different instruments has to be stopped safely. For such task a beam dump to absorb the beam energy and take it to a heat sink is needed. Spain has the compromise of delivering such device and CIEMAT (Centro de Investigaciones Energéticas Medioambientales y Tecnológicas) is responsible for such task. The central piece of the beam dump, where the ion beam is stopped, is a copper cone with an angle of 3.5o, 2.5 m long and 5 mm width. This part is cooled by water flowing on its external surface through the channel formed between the copper cone and a concentric piece with the latter. The thesis is developed in this realm, and its objective is designing the LIPAc beam dump cooling system. The design has been performed employing a simplified one dimensional model. The water parameters (pressure, flow, pressure loss) and the required annular channel geometry (width, rugoisty) have been obtained guaranteeing the correct cooling of the beam dump. It has been checked that the cooling design allows variations of the the beam with respect to the nominal position, being the CHF (Critical Heat Flux) at least twice times higher than the nominal deposited heat flux. 3D fluid dynamic simulations employing ANSYS-CFX code in the beam dump cooling channel sections which require a more thorough study have also been performed. The beam dump will activateasaconsequenceofthe deuteron beam interaction, making impossible any change or maintenance task once the accelerator operation has started. Hence the design has to be very robust and all the hypotheses employed in the design mustbecarefully checked. Most of the work in the thesis is concentrated in estimating the heat transfer coefficient which is decisive in the obtained results, and is also employed as boundary condition in the mechanical analysis. For such task, correlations which applicability range is the adequate for the beam dump conditions (annular channel, water-surface temperature differences of tens of degrees) have been compiled. In a second step the heat transfer coefficients obtained from the selected correlation (Petukhov- Gnielinski) have been compared with the ones deduced from the 3D fluid dynamic simulations, obtaining satisfactory results. Finally an experimental validation has been performed employing a prototype and a hydraulic circuit that supplies a flow with the requested parameters in the beam dump. After several tries and improvements in the experiment, the heat transfer coefficients for different flows and heating powers have been obtained. Considering the uncertainty in the measurements the experimental values agree reasonably well (in the order of 15%) with the ones obtained from the correlations. Due to radiological reasons the quality of the cooling water must be controlled, hence minimizing the copper corrosion. After performing a bibligraphic study the most adequate water parameters were identified (conductivity, pH and dissolved oxygen concentration). As part of this thesis a corrosion study of the beam dump cooling circuit has been performed with the double aim of determining if corrosion can pose a risk for the copper beam dump , and obtaining an estimation of the corrosion velocitytodimension the water purification system. TRACT code(TRansport and ACTivation) has been employed for such study adapting the code for the beam dump case. For such study a collaboration with the code responsible (Panos Karditsas) at Culham (UKAEA) was established. The work developed in this thesis has supposed the publication of three articles in JCR journals (”Journal of Nuclear Materials” y ”Fusion Engineering and Design”), as well as presentations in more than four conferences and relevant meetings.
Resumo:
One of the main objectives of European Commission related to climate and energy is the well-known 20-20-20 targets to be achieved in 2020: Europe has to reduce greenhouse gas emissions of at least 20% below 1990 levels, 20% of EU energy consumption has to come from renewable resources and, finally, a 20% reduction in primary energy use compared with projected levels, has to be achieved by improving energy efficiency. In order to reach these objectives, it is necessary to reduce the overall emissions, mainly in transport (reducing CO2, NOx and other pollutants), and to increase the penetration of the intermittent renewable energy. A high deployment of battery electric (BEVs) and plug-in hybrid electric vehicles (PHEVs), with a low-cost source of energy storage, could help to achieve both targets. Hybrid electric vehicles (HEVs) use a combination of a conventional internal combustion engine (ICE) with one (or more) electric motor. There are different grades of hybridation from micro-hybrids with start-stop capability, mild hybrids (with kinetic energy recovery), medium hybrids (mild hybrids plus energy assist) and full hybrids (medium hybrids plus electric launch capability). These last types of vehicles use a typical battery capacity around 1-2 kWh. Plug in hybrid electric vehicles (PHEVs) use larger battery capacities to achieve limited electric-only driving range. These vehicles are charged by on-board electricity generation or either plugging into electric outlets. Typical battery capacity is around 10 kWh. Battery Electric Vehicles (BEVs) are only driven by electric power and their typical battery capacity is around 15-20 kWh. One type of PHEV, the Extended Range Electric Vehicle (EREV), operates as a BEV until its plug-in battery capacity is depleted; at which point its gasoline engine powers an electric generator to extend the vehicle's range. The charging of PHEVs (including EREVs) and BEVs will have different impacts to the electric grid, depending on the number of vehicles and the start time for charging. Initially, the lecture will start analyzing the electrical power requirements for charging PHEVs-BEVs in Flanders region (Belgium) under different charging scenarios. Secondly and based on an activity-based microsimulation mobility model, an efficient method to reduce this impact will be presented.
Resumo:
In this paper, a hydroelectric power plant with long tail-race tunnel has been modelled for assessing its contribution to secondary regulation reserve. Cavitation problems, caused by the discharge conduit length, are expected downstream the turbine where low pressure appears during regulation manoeuvres. Therefore, governor's gains should be selected taking into account these phenomena. On the other hand, regulation services bidden by the plant operator should fulfil TSO (Transmission System Operator) quality requirements. A methodology for tuning governor PI gains is proposed and applied to a Hydro power plant in pre-design phase in northwest area of Spain. The PI gains adjustment proposed provides a proper plant response, according to some established indexes, while avoiding cavitation phenomena.
Resumo:
The more and more demanding conditions in the power generation sector requires to apply all the available technologies to optimize processes and reduce costs. An integrated asset management strategy, combining technical analysis and operation and maintenance management can help to improve plant performance, flexibility and reliability. In order to deploy such a model it is necessary to combine plant data and specific equipment condition information, with different systems devoted to analyze performance and equipment condition, and take advantage of the results to support operation and maintenance decisions. This model that has been dealt in certain detail for electricity transmission and distribution networks, is not yet broadly extended in the power generation sector, as proposed in this study for the case of a combined power plant. Its application would turn in direct benefit for the operation and maintenance and for the interaction to the energy market
Resumo:
La energía transportada por el oleaje a través de los océanos (energía undimotriz) se enmarca dentro de las denominadas energías oceánicas. Su aprovechamiento para generar energía eléctrica (o ser aprovechada de alguna otra forma) es una idea reflejada ya hace más de dos siglos en una patente (1799). Desde entonces, y con especial intensidad desde los años 70, ha venido despertando el interés de instituciones ligadas al I+D+i y empresas del sector energético y tecnológico, debido principalmente a la magnitud del recurso disponible. Actualmente se puede considerar al sector en un estado precomercial, con un amplio rango de dispositivos y tecnologías en diferente grado de desarrollo en los que ninguno destaca sobre los otros (ni ha demostrado su viabilidad económica), y sin que se aprecie una tendencia a converger un único dispositivo (o un número reducido de ellos). El recurso energético que se está tratando de aprovechar, pese a compartir la característica de no-controlabilidad con otras fuentes de energía renovable como la eólica o la solar, presenta una variabilidad adicional. De esta manera, diferentes localizaciones, pese a poder presentar recursos de contenido energético similar, presentan oleajes de características muy diferentes en términos de alturas y periodos de oleaje, y en la dispersión estadística de estos valores. Esta variabilidad en el oleaje hace que cobre especial relevancia la adecuación de los dispositivos de aprovechamiento de energía undimotriz (WEC: Wave Energy Converter) a su localización, de cara a mejorar su viabilidad económica. Parece razonable suponer que, en un futuro, el proceso de diseño de un parque de generación undimotriz implique un rediseño (en base a una tecnología conocida) para cada proyecto de implantación en una nueva localización. El objetivo de esta tesis es plantear un procedimiento de dimensionado de una tecnología de aprovechamiento de la energía undimotriz concreta: los absorbedores puntuales. Dicha metodología de diseño se plantea como un problema de optimización matemático, el cual se resuelve utilizando un algoritmo de optimización bioinspirado: evolución diferencial. Este planteamiento permite automatizar la fase previa de dimensionado implementando la metodología en un código de programación. El proceso de diseño de un WEC es un problema de ingería complejo, por lo que no considera factible el planteamiento de un diseño completo mediante un único procedimiento de optimización matemático. En vez de eso, se platea el proceso de diseño en diferentes etapas, de manera que la metodología desarrollada en esta tesis se utilice para obtener las dimensiones básicas de una solución de referencia de WEC, la cual será utilizada como punto de partida para continuar con las etapas posteriores del proceso de diseño. La metodología de dimensionado previo presentada en esta tesis parte de unas condiciones de contorno de diseño definidas previamente, tales como: localización, características del sistema de generación de energía eléctrica (PTO: Power Take-Off), estrategia de extracción de energía eléctrica y concepto concreto de WEC). Utilizando un algoritmo de evolución diferencial multi-objetivo se obtiene un conjunto de soluciones factibles (de acuerdo con una ciertas restricciones técnicas y dimensionales) y óptimas (de acuerdo con una serie de funciones objetivo de pseudo-coste y pseudo-beneficio). Dicho conjunto de soluciones o dimensiones de WEC es utilizado como caso de referencia en las posteriores etapas de diseño. En el documento de la tesis se presentan dos versiones de dicha metodología con dos modelos diferentes de evaluación de las soluciones candidatas. Por un lado, se presenta un modelo en el dominio de la frecuencia que presenta importantes simplificaciones en cuanto al tratamiento del recurso del oleaje. Este procedimiento presenta una menor carga computacional pero una mayor incertidumbre en los resultados, la cual puede traducirse en trabajo adicional en las etapas posteriores del proceso de diseño. Sin embargo, el uso de esta metodología resulta conveniente para realizar análisis paramétricos previos de las condiciones de contorno, tales como la localización seleccionada. Por otro lado, la segunda metodología propuesta utiliza modelos en el domino estocástico, lo que aumenta la carga computacional, pero permite obtener resultados con menos incertidumbre e información estadística muy útil para el proceso de diseño. Por este motivo, esta metodología es más adecuada para su uso en un proceso de dimensionado completo de un WEC. La metodología desarrollada durante la tesis ha sido utilizada en un proyecto industrial de evaluación energética preliminar de una planta de energía undimotriz. En dicho proceso de evaluación, el método de dimensionado previo fue utilizado en una primera etapa, de cara a obtener un conjunto de soluciones factibles de acuerdo con una serie de restricciones técnicas básicas. La selección y refinamiento de la geometría de la solución geométrica de WEC propuesta fue realizada a posteriori (por otros participantes del proyecto) utilizando un modelo detallado en el dominio del tiempo y un modelo de evaluación económica del dispositivo. El uso de esta metodología puede ayudar a reducir las iteraciones manuales y a mejorar los resultados obtenidos en estas últimas etapas del proyecto. ABSTRACT The energy transported by ocean waves (wave energy) is framed within the so-called oceanic energies. Its use to generate electric energy (or desalinate ocean water, etc.) is an idea expressed first time in a patent two centuries ago (1799). Ever since, but specially since the 1970’s, this energy has become interesting for R&D institutions and companies related with the technological and energetic sectors mainly because of the magnitude of available energy. Nowadays the development of this technology can be considered to be in a pre-commercial stage, with a wide range of devices and technologies developed to different degrees but with none standing out nor economically viable. Nor do these technologies seem ready to converge to a single device (or a reduce number of devices). The energy resource to be exploited shares its non-controllability with other renewable energy sources such as wind and solar. However, wave energy presents an additional short-term variability due to its oscillatory nature. Thus, different locations may show waves with similar energy content but different characteristics such as wave height or wave period. This variability in ocean waves makes it very important that the devices for harnessing wave energy (WEC: Wave Energy Converter) fit closely to the characteristics of their location in order to improve their economic viability. It seems reasonable to assume that, in the future, the process of designing a wave power plant will involve a re-design (based on a well-known technology) for each implementation project in any new location. The objective of this PhD thesis is to propose a dimensioning method for a specific wave-energy-harnessing technology: point absorbers. This design methodology is presented as a mathematical optimization problem solved by using an optimization bio-inspired algorithm: differential evolution. This approach allows automating the preliminary dimensioning stage by implementing the methodology in programmed code. The design process of a WEC is a complex engineering problem, so the complete design is not feasible using a single mathematical optimization procedure. Instead, the design process is proposed in different stages, so the methodology developed in this thesis is used for the basic dimensions of a reference solution of the WEC, which would be used as a starting point for the later stages of the design process. The preliminary dimensioning methodology presented in this thesis starts from some previously defined boundary conditions such as: location, power take-off (PTO) characteristic, strategy of energy extraction and specific WEC technology. Using a differential multi-objective evolutionary algorithm produces a set of feasible solutions (according to certain technical and dimensional constraints) and optimal solutions (according to a set of pseudo-cost and pseudo-benefit objective functions). This set of solutions or WEC dimensions are used as a reference case in subsequent stages of design. In the document of this thesis, two versions of this methodology with two different models of evaluation of candidate solutions are presented. On the one hand, a model in the frequency domain that has significant simplifications in the treatment of the wave resource is presented. This method implies a lower computational load but increased uncertainty in the results, which may lead to additional work in the later stages of the design process. However, use of this methodology is useful in order to perform previous parametric analysis of boundary conditions such as the selected location. On the other hand, the second method uses stochastic models, increasing the computational load, but providing results with smaller uncertainty and very useful statistical information for the design process. Therefore, this method is more suitable to be used in a detail design process for full dimensioning of the WEC. The methodology developed throughout the thesis has been used in an industrial project for preliminary energetic assessment of a wave energy power plant. In this assessment process, the method of previous dimensioning was used in the first stage, in order to obtain a set of feasible solutions according to a set of basic technical constraints. The geometry of the WEC was refined and selected subsequently (by other project participants) using a detailed model in the time domain and a model of economic evaluation of the device. Using this methodology can help to reduce the number of design iterations and to improve the results obtained in the last stages of the project.
Resumo:
El sector energético, en España en particular, y de forma similar en los principales países de Europa, cuenta con una significativa sobrecapacidad de generación, debido al rápido y significativo crecimiento de las energías renovables en los últimos diez años y la reducción de la demanda energética, como consecuencia de la crisis económica. Esta situación ha hecho que las centrales térmicas de generación de electricidad, y en concreto los ciclos combinados de gas, operen con un factor de utilización extremadamente bajo, del orden del 10%. Además de la reducción de ingresos, esto supone para las plantas trabajar continuamente fuera del punto de diseño, provocando una significativa pérdida de rendimiento y mayores costes de explotación. En este escenario, cualquier contribución que ayude a mejorar la eficiencia y la condición de los equipos, es positivamente considerada. La gestión de activos está ganando relevancia como un proceso multidisciplinar e integrado, tal y como refleja la reciente publicación de las normas ISO 55000:2014. Como proceso global e integrado, la gestión de activos requiere el manejo de diversos procesos y grandes volúmenes de información, incluso en tiempo real. Para ello es necesario utilizar tecnologías de la información y aplicaciones de software. Esta tesis desarrolla un concepto integrado de gestión de activos (Integrated Plant Management – IPM) aplicado a centrales de ciclo combinado y una metodología para estimar el beneficio aportado por el mismo. Debido a las incertidumbres asociadas a la estimación del beneficio, se ha optado por un análisis probabilístico coste-beneficio. Así mismo, el análisis cuantitativo se ha completado con una validación cualitativa del beneficio aportado por las tecnologías incorporadas al concepto de gestión integrada de activos, mediante una entrevista realizada a expertos del sector de generación de energía. Los resultados del análisis coste-beneficio son positivos, incluso en el desfavorable escenario con un factor de utilización de sólo el 10% y muy prometedores para factores de utilización por encima del 30%. ABSTRACT The energy sector particularly in Spain, and in a similar way in Europe, has a significant overcapacity due to the big growth of the renewable energies in the last ten years, and it is seriously affected by the demand decrease due to the economic crisis. That situation has forced the thermal plants and in particular, the combined cycles to operate with extremely low annual average capacity factors, very close to 10%. Apart from the incomes reduction, working in out-of-design conditions, means getting a worse performance and higher costs than expected. In this scenario, anything that can be done to improve the efficiency and the equipment condition is positively received. Asset Management, as a multidisciplinary and integrated process, is gaining prominence, reflected in the recent publication of the ISO 55000 series in 2014. Dealing Asset Management as a global, integrated process needs to manage several processes and significant volumes of information, also in real time, that requires information technologies and software applications to support it. This thesis proposes an integrated asset management concept (Integrated Plant Management-IPM) applied to combined cycle power plants and develops a methodology to assess the benefit that it can provide. Due to the difficulties in getting deterministic benefit estimation, a statistical approach has been adopted for the cot-benefit analysis. As well, the quantitative analysis has been completed with a qualitative validation of the technologies included in the IPM and their contribution to key power plant challenges by power generation sector experts. The cost- benefit analysis provides positive results even in the negative scenario of annual average capacity factor close to 10% and is promising for capacity factors over 30%.
Resumo:
El accidente de pérdida de refrigerante (LOCA) en un reactor nuclear es uno de los accidentes Base de Diseño más preocupantes y estudiados desde el origen del uso de la tecnología de fisión en la industria productora de energía. El LOCA ocupa, desde el punto de vista de los análisis de seguridad, un lugar de vanguardia tanto en el análisis determinista (DSA) como probabilista (PSA), cuya diferenciada perspectiva ha ido evolucionando notablemente en lo que al crédito a la actuación de las salvaguardias y las acciones del operador se refiere. En la presente tesis se aborda el análisis sistemático de de las secuencias de LOCA por pequeña y mediana rotura en diferentes lugares de un reactor nuclear de agua a presión (PWR) con fallo total de Inyección de Seguridad de Alta Presión (HPSI). Tal análisis ha sido desarrollado en base a la metodología de Análisis Integrado de Seguridad (ISA), desarrollado por el Consejo de Seguridad Nuclear (CSN) y consistente en la aplicación de métodos avanzados de simulación y PSA para la obtención de Dominios de Daño, que cuantifican topológicamente las probabilidades de éxito y daño en función de determinados parámetros inciertos. Para la elaboración de la presente tesis, se ha hecho uso del código termohidráulico TRACE v5.0 (patch 2), avalado por la NRC de los EEUU como código de planta para la simulación y análisis de secuencias en reactores de agua ligera (LWR). Los objetivos del trabajo son, principalmente: (1) el análisis exhaustivo de las secuencias de LOCA por pequeña-mediana rotura en diferentes lugares de un PWR de tres lazos de diseño Westinghouse (CN Almaraz), con fallo de HPSI, en función de parámetros de gran importancia para los transitorios, tales como el tamaño de rotura y el tiempo de retraso en la respuesta del operador; (2) la obtención y análisis de los Dominios de Daño para transitorios de LOCA en PWRs, de acuerdo con la metodología ISA; y (3) la revisión de algunos de los resultados genéricos de los análisis de seguridad para secuencias de LOCA en las mencionadas condiciones. Los resultados de la tesis abarcan tres áreas bien diferenciadas a lo largo del trabajo: (a) la fenomenología física de las secuencias objeto de estudio; (b) las conclusiones de los análisis de seguridad practicados a los transitorios de LOCA; y (c) la relevancia de las consecuencias de las acciones humanas por parte del grupo de operación. Estos resultados, a su vez, son de dos tipos fundamentales: (1) de respaldo del conocimiento previo sobre el tipo de secuencias analizado, incluido en la extensa bibliografía examinada; y (2) hallazgos en cada una de las tres áreas mencionadas, no referidos en la bibliografía. En resumidas cuentas, los resultados de la tesis avalan el uso de la metodología ISA como método de análisis alternativo y sistemático para secuencias accidentales en LWRs. ABSTRACT The loss of coolant accident (LOCA) in nuclear reactors is one of the most concerning and analized accidents from the beginning of the use of fission technology for electric power production. From the point of view of safety analyses, LOCA holds a forefront place in both Deterministic (DSA) and Probabilistic Safety Analysis (PSA), which have significantly evolved from their original state in both safeguard performance credibility and human actuation. This thesis addresses a systematic analysis of small and medium LOCA sequences, in different places of a nuclear Pressurized Water Reactor (PWR) and with total failure of High Pressure Safety Injection (HPSI). Such an analysis has been grounded on the Integrated Safety Assessment (ISA) methodology, developed by the Spanish Nuclear Regulatory Body (CSN). ISA involves the application of advanced methods of simulation and PSA for obtaining Damage Domains that topologically quantify the likelihood of success and damage regarding certain uncertain parameters.TRACE v5.0 (patch 2) code has been used as the thermalhydraulic simulation tool for the elaboration of this work. Nowadays, TRACE is supported by the US NRC as a plant code for the simulation and analysis of sequences in light water reactors (LWR). The main objectives of the work are the following ones: (1) the in-depth analysis of small and medium LOCA sequences in different places of a Westinghouse three-loop PWR (Almaraz NPP), with failed HPSI, regarding important parameters, such as break size or delay in operator response; (2) obtainment and analysis of Damage Domains related to LOCA transients in PWRs, according to ISA methodology; and (3) review some of the results of generic safety analyses for LOCA sequences in those conditions. The results of the thesis cover three separated areas: (a) the physical phenomenology of the sequences under study; (b) the conclusions of LOCA safety analyses; and (c) the importance of consequences of human actions by the operating crew. These results, in turn, are of two main types: (1) endorsement of previous knowledge about this kind of sequences, which is included in the literature; and (2) findings in each of the three aforementioned areas, not reported in the reviewed literature. In short, the results of this thesis support the use of ISA-like methodology as an alternative method for systematic analysis of LWR accidental sequences.
Resumo:
Linear Fresnel collectors are identified as a technology that should play a main role in order to reduce cost of Concentrating Solar Power. An optical and thermal analysis of the different blocks of the solar power plant is carried out, where Fresnel arrays are compared with the most extended linear technology: parabolic trough collectors. It is demonstrated that the optical performance of Fresnel array is very close to that of PTC, with similar values of maximum flux intensities. In addition, if the heat carrier fluid flows in series by the tubes of the receiver, relatively high thermal efficiencies are achieved. Thus, an annual solar to electricity efficiency of 19% is expected, which is similar to the state of the art in PTCs; this is done with a reduction of costs, thanks to lighter structures, that drives to an estimation of LCOE of around 6.5 c€/kWh.
Resumo:
This article has been extracted from the results of a thesis entitled “Potential bioelectricity production of the Madrid Community Agricultural Regions based on rye and triticale biomass.” The aim was, first, to quantify the potential of rye (Secale Cereale L.) and triticale ( Triticosecale Aestivum L.) biomass in each of the Madrid Community agricultural regions, and second, to locate the most suitable areas for the installation of power plants using biomass. At least 17,339.9 t d.m. of rye and triticale would be required to satisfy the biomass needs of a 2.2 MW power plant, (considering an efficiency of 21.5%, 8,000 expected operating hours/year and a biomass LCP of 4,060 kcal/kg for both crops), and 2,577 ha would be used (which represent 2.79% of the Madrid Community fallow dry land surface). Biomass yields that could be achieved in Madrid Community using 50% of the fallow dry land surface (46,150 ha representing 5.75% of the Community area), based on rye and triticale crops, are estimated at 84,855, 74,906, 70,109, 50,791, 13,481, and 943 t annually for the Campiña, Vegas, Sur Occidental, Área Metropolitana, Lozoya-Somosierra, and Guadarrama regions. The latter represents a bioelectricity potential of 10.77, 9.5, 8.9, 6.44, 1.71, and 0.12 MW, respectively.
Resumo:
This paper presents a work whose objective is, first, to quantify the potential of the triticale biomass existing in each of the agricultural regions in the Madrid Community through a crop simulation model based on regression techniques and multiple correlation. Second, a methodology for defining which area has the best conditions for the installation of electricity plants from biomass has been described and applied. The study used a methodology based on compromise programming in a discrete multicriteria decision method (MDM) context. To make a ranking, the following criteria were taken into account: biomass potential, electric power infrastructure, road networks, protected spaces, and urban nuclei surfaces. The results indicate that, in the case of the Madrid Community, the Campiña region is the most suitable for setting up plants powered by biomass. A minimum of 17,339.9 tons of triticale will be needed to satisfy the requirements of a 2.2 MW power plant. The minimum range of action for obtaining the biomass necessary in Campiña region would be 6.6 km around the municipality of Algete, based on Geographic Information Systems. The total biomass which could be made available in considering this range in this region would be 18,430.68 t.