19 resultados para MIP Mathematical Programming Job Shop Scheduling
Resumo:
Dynamic scheduling increases the expressive power of logic programming languages, but also introduces some overhead. In this paper we present two classes of program transformations designed to reduce this additional overhead, while preserving the operational semantics of the original programs, modulo ordering of literals woken at the same time. The first class of transformations simplifies the delay conditions while the second class moves delayed literals later in the rule body. Application of the program transformations can be automated using information provided by compile-time analysis. We provide experimental results obtained from an implementation of the proposed techniques using the CIAO prototype compiler. Our results show that the techniques can lead to substantial performance improvement.
Resumo:
Acoplamiento del sistema informático de control de piso de producción (SFS) con el conjunto de equipos de fabricación (SPE) es una tarea compleja. Tal acoplamiento involucra estándares abiertos y propietarios, tecnologías de información y comunicación, entre otras herramientas y técnicas. Debido a la turbulencia de mercados, ya sea soluciones personalizadas o soluciones basadas en estándares eventualmente requieren un esfuerzo considerable de adaptación. El concepto de acoplamiento débil ha sido identificado en la comunidad de diseño organizacional como soporte para la sobrevivencia de la organización. Su presencia reduce la resistencia de la organización a cambios en el ambiente. En este artículo los resultados obtenidos por la comunidad de diseño organizacional son identificados, traducidos y organizados para apoyar en la solución del problema de integración SFS-SPE. Un modelo clásico de acoplamiento débil, desarrollado por la comunidad de estudios de diseño organizacional, es resumido y trasladado al área de interés. Los aspectos claves son identificados para utilizarse como promotores del acoplamiento débil entre SFS-SPE, y presentados en forma de esquema de referencia. Así mismo, este esquema de referencia es presentado como base para el diseño e implementación de una solución genérica de acoplamiento o marco de trabajo (framework) de acoplamiento, a incluir como etapa de acoplamiento débil entre SFS y SPE. Un ejemplo de validación con varios conjuntos de equipos de fabricación, usando diferentes medios físicos de comunicación, comandos de controlador, lenguajes de programación de equipos y protocolos de comunicación es presentado, mostrando un nivel aceptable de autonomía del SFS. = Coupling shop floor software system (SFS) with the set of production equipment (SPE) becomes a complex task. It involves open and proprietary standards, information and communication technologies among other tools and techniques. Due to market turbulence, either custom solutions or standards based solutions eventually require a considerable effort of adaptation. Loose coupling concept has been identified in the organizational design community as a compensator for organization survival. Its presence reduces organization reaction to environment changes. In this paper the results obtained by the organizational de sign community are identified, translated and organized to support the SFS-SPE integration problem solution. A classical loose coupling model developed by organizational studies community is abstracted and translated to the area of interest. Key aspects are identified to be used as promoters of SFS-SPE loose coupling and presented in a form of a reference scheme. Furthermore, this reference scheme is proposed here as a basis for the design and implementation of a generic coupling solution or coupling framework, that is included as a loose coupling stage between SFS and SPE. A validation example with various sets of manufacturing equipment, using different physical communication media, controller commands, programming languages and wire protocols is presented, showing an acceptable level of autonomy gained by the SFS.
Resumo:
The operating theatres are the engine of the hospitals; proper management of the operating rooms and its staff represents a great challenge for managers and its results impact directly in the budget of the hospital. This work presents a MILP model for the efficient schedule of multiple surgeries in Operating Rooms (ORs) during a working day. This model considers multiple surgeons and ORs and different types of surgeries. Stochastic strategies are also implemented for taking into account the uncertain in surgery durations (pre-incision, incision, post-incision times). In addition, a heuristic-based methods and a MILP decomposition approach is proposed for solving large-scale ORs scheduling problems in computational efficient way. All these computer-aided strategies has been implemented in AIMMS, as an advanced modeling and optimization software, developing a user friendly solution tool for the operating room management under uncertainty.
Resumo:
The Train Timetabling Problem (TTP) has been widely studied for freight and passenger rail systems. A lesser effort has been devoted to the study of high-speed rail systems. A modeling issue that has to be addressed is to model departure time choice of passengers on railway services. Passengers who use these systems attempt to travel at predetermined hours due to their daily life necessities (e.g., commuter trips). We incorporate all these features into TTP focusing on high-speed railway systems. We propose a Rail Scheduling and Rolling Stock (RSch-RS) model for timetable planning of high-speed railway systems. This model is composed of two essential elements: i) an infrastructure model for representing the railway network: it includes capacity constraints of the rail network and the Rolling-Stock constraints; and ii) a demand model that defines how the passengers choose the departure time. The resulting model is a mixed-integer programming model which objective function attempts to maximize the profit for the rail operator