31 resultados para Contractual Penalty


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The first level data cache un modern processors has become a major consumer of energy due to its increasing size and high frequency access rate. In order to reduce this high energy con sumption, we propose in this paper a straightforward filtering technique based on a highly accurate forwarding predictor. Specifically, a simple structure predicts whether a load instruction will obtain its corresponding data via forwarding from the load-store structure -thus avoiding the data cache access - or if it will be provided by the data cache. This mechanism manages to reduce the data cache energy consumption by an average of 21.5% with a negligible performance penalty of less than 0.1%. Furthermore, in this paper we focus on the cache static energy consumption too by disabling a portin of sets of the L2 associative cache. Overall, when merging both proposals, the combined L1 and L2 total energy consumption is reduced by an average of 29.2% with a performance penalty of just 0.25%. Keywords: Energy consumption; filtering; forwarding predictor; cache hierarchy

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The objective of this study was to propose a multi-criteria optimization and decision-making technique to solve food engineering problems. This technique was demostrated using experimental data obtained on osmotic dehydratation of carrot cubes in a sodium chloride solution. The Aggregating Functions Approach, the Adaptive Random Search Algorithm, and the Penalty Functions Approach were used in this study to compute the initial set of non-dominated or Pareto-optimal solutions. Multiple non-linear regression analysis was performed on a set of experimental data in order to obtain particular multi-objective functions (responses), namely water loss, solute gain, rehydration ratio, three different colour criteria of rehydrated product, and sensory evaluation (organoleptic quality). Two multi-criteria decision-making approaches, the Analytic Hierarchy Process (AHP) and the Tabular Method (TM), were used simultaneously to choose the best alternative among the set of non-dominated solutions. The multi-criteria optimization and decision-making technique proposed in this study can facilitate the assessment of criteria weights, giving rise to a fairer, more consistent, and adequate final compromised solution or food process. This technique can be useful to food scientists in research and education, as well as to engineers involved in the improvement of a variety of food engineering processes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper describes a fully automatic simultaneous lung vessel and airway enhancement filter. The approach consists of a Frangi-based multiscale vessel enhancement filtering specifically designed for lung vessel and airway detection, where arteries and veins have high contrast with respect to the lung parenchyma, and airway walls are hollow tubular structures with a non negative response using the classical Frangi's filter. The features extracted from the Hessian matrix are used to detect centerlines and approximate walls of airways, decreasing the filter response in those areas by applying a penalty function to the vesselness measure. We validate the segmentation method in 20 CT scans with different pathological states within the VESSEL12 challenge framework. Results indicate that our approach obtains good results, decreasing the number of false positives in airway walls.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The hot-spot phenomenon is a relatively frequent problem in current photovoltaic generators. It entails both a risk for the photovoltaic module's lifetime and a decrease in its operational efficiency. Nevertheless, there is still a lack of widely accepted procedures for dealing with them in practice. This paper presents the IES UPM observations on 200 affected modules. Visual and infrared inspection, electroluminescence, peak power and operating voltage tests have been accomplished. Hot-spot observation procedures and well defined acceptance and rejection criteria are proposed, addressing both the lifetime and the operational efficiency of the modules. The operating voltage has come out as the best parameter to control effective efficiency losses for the affected modules. This procedure is oriented to its possible application in contractual frameworks.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El objetivo de la presente investigación es el desarrollo de un modelo de cálculo rápido, eficiente y preciso, para la estimación de los costes finales de construcción, en las fases preliminares del proyecto arquitectónico. Se trata de una herramienta a utilizar durante el proceso de elaboración de estudios previos, anteproyecto y proyecto básico, no siendo por tanto preciso para calcular el “predimensionado de costes” disponer de la total definición grafica y literal del proyecto. Se parte de la hipótesis de que en la aplicación práctica del modelo no se producirán desviaciones superiores al 10 % sobre el coste final de la obra proyectada. Para ello se formulan en el modelo de predimensionado cinco niveles de estimación de costes, de menor a mayor definición conceptual y gráfica del proyecto arquitectónico. Los cinco niveles de cálculo son: dos que toman como referencia los valores “exógenos” de venta de las viviendas (promoción inicial y promoción básica) y tres basados en cálculos de costes “endógenos” de la obra proyectada (estudios previos, anteproyecto y proyecto básico). El primer nivel de estimación de carácter “exógeno” (nivel .1), se calcula en base a la valoración de mercado de la promoción inmobiliaria y a su porcentaje de repercusión de suelo sobre el valor de venta de las viviendas. El quinto nivel de valoración, también de carácter “exógeno” (nivel .5), se calcula a partir del contraste entre el valor externo básico de mercado, los costes de construcción y los gastos de promoción estimados de la obra proyectada. Este contraste entre la “repercusión del coste de construcción” y el valor de mercado, supone una innovación respecto a los modelos de predimensionado de costes existentes, como proceso metodológico de verificación y validación extrínseca, de la precisión y validez de las estimaciones resultantes de la aplicación práctica del modelo, que se denomina Pcr.5n (Predimensionado costes de referencia con .5niveles de cálculo según fase de definición proyectual / ideación arquitectónica). Los otros tres niveles de predimensionado de costes de construcción “endógenos”, se estiman mediante cálculos analíticos internos por unidades de obra y cálculos sintéticos por sistemas constructivos y espacios funcionales, lo que se lleva a cabo en las etapas iniciales del proyecto correspondientes a estudios previos (nivel .2), anteproyecto (nivel .3) y proyecto básico (nivel .4). Estos cálculos teóricos internos son finalmente evaluados y validados mediante la aplicación práctica del modelo en obras de edificación residencial, de las que se conocen sus costes reales de liquidación final de obra. Según va evolucionando y se incrementa el nivel de definición y desarrollo del proyecto, desde los estudios previos hasta el proyecto básico, el cálculo se va perfeccionando en su nivel de eficiencia y precisión de la estimación, según la metodología aplicada: [aproximaciones sucesivas en intervalos finitos], siendo la hipótesis básica como anteriormente se ha avanzado, lograr una desviación máxima de una décima parte en el cálculo estimativo del predimensionado del coste real de obra. El cálculo del coste de ejecución material de la obra, se desarrolla en base a parámetros cúbicos funcionales “tridimensionales” del espacio proyectado y parámetros métricos constructivos “bidimensionales” de la envolvente exterior de cubierta/fachada y de la huella del edificio sobre el terreno. Los costes funcionales y constructivos se ponderan en cada fase del proceso de cálculo con sus parámetros “temáticos/específicos” de gestión (Pg), proyecto (Pp) y ejecución (Pe) de la concreta obra presupuestada, para finalmente estimar el coste de construcción por contrata, como resultado de incrementar al coste de ejecución material el porcentaje correspondiente al parámetro temático/especifico de la obra proyectada. El modelo de predimensionado de costes de construcción Pcr.5n, será una herramienta de gran interés y utilidad en el ámbito profesional, para la estimación del coste correspondiente al Proyecto Básico previsto en el marco técnico y legal de aplicación. Según el Anejo I del Código Técnico de la Edificación (CTE), es de obligado cumplimiento que el proyecto básico contenga una “Valoración aproximada de la ejecución material de la obra proyectada por capítulos”, es decir , que el Proyecto Básico ha de contener al menos un “presupuesto aproximado”, por capítulos, oficios ó tecnologías. El referido cálculo aproximado del presupuesto en el Proyecto Básico, necesariamente se ha de realizar mediante la técnica del predimensionado de costes, dado que en esta fase del proyecto arquitectónico aún no se dispone de cálculos de estructura, planos de acondicionamiento e instalaciones, ni de la resolución constructiva de la envolvente, por cuanto no se han desarrollado las especificaciones propias del posterior proyecto de ejecución. Esta estimación aproximada del coste de la obra, es sencilla de calcular mediante la aplicación práctica del modelo desarrollado, y ello tanto para estudiantes como para profesionales del sector de la construcción. Como se contiene y justifica en el presente trabajo, la aplicación práctica del modelo para el cálculo de costes en las fases preliminares del proyecto, es rápida y certera, siendo de sencilla aplicación tanto en vivienda unifamiliar (aisladas y pareadas), como en viviendas colectivas (bloques y manzanas). También, el modelo es de aplicación en el ámbito de la valoración inmobiliaria, tasaciones, análisis de viabilidad económica de promociones inmobiliarias, estimación de costes de obras terminadas y en general, cuando no se dispone del proyecto de ejecución y sea preciso calcular los costes de construcción de las obras proyectadas. Además, el modelo puede ser de aplicación para el chequeo de presupuestos calculados por el método analítico tradicional (estado de mediciones pormenorizadas por sus precios unitarios y costes descompuestos), tanto en obras de iniciativa privada como en obras promovidas por las Administraciones Públicas. Por último, como líneas abiertas a futuras investigaciones, el modelo de “predimensionado costes de referencia 5 niveles de cálculo”, se podría adaptar y aplicar para otros usos y tipologías diferentes a la residencial, como edificios de equipamientos y dotaciones públicas, valoración de edificios históricos, obras de urbanización interior y exterior de parcela, proyectos de parques y jardines, etc….. Estas lineas de investigación suponen trabajos paralelos al aquí desarrollado, y que a modo de avance parcial se recogen en las comunicaciones presentadas en los Congresos internacionales Scieconf/Junio 2013, Rics‐Cobra/Septiembre 2013 y en el IV Congreso nacional de patología en la edificación‐Ucam/Abril 2014. ABSTRACT The aim of this research is to develop a fast, efficient and accurate calculation model to estimate the final costs of construction, during the preliminary stages of the architectural project. It is a tool to be used during the preliminary study process, drafting and basic project. It is not therefore necessary to have the exact, graphic definition of the project in order to be able to calculate the cost‐scaling. It is assumed that no deviation 10% higher than the final cost of the projected work will occur during the implementation. To that purpose five levels of cost estimation are formulated in the scaling model, from a lower to a higher conceptual and graphic definition of the architectural project. The five calculation levels are: two that take as point of reference the ”exogenous” values of house sales (initial development and basic development), and three based on calculation of endogenous costs (preliminary study, drafting and basic project). The first ”exogenous” estimation level (level.1) is calculated over the market valuation of real estate development and the proportion the cost of land has over the value of the houses. The fifth level of valuation, also an ”exogenous” one (level.5) is calculated from the contrast between the basic external market value, the construction costs, and the estimated development costs of the projected work. This contrast between the ”repercussions of construction costs” and the market value is an innovation regarding the existing cost‐scaling models, as a methodological process of extrinsic verification and validation, of the accuracy and validity of the estimations obtained from the implementation of the model, which is called Pcr.5n (reference cost‐scaling with .5calculation levels according to the stage of project definition/ architectural conceptualization) The other three levels of “endogenous” construction cost‐scaling are estimated from internal analytical calculations by project units and synthetic calculations by construction systems and functional spaces. This is performed during the initial stages of the project corresponding to preliminary study process (level.2), drafting (level.3) and basic project (level.4). These theoretical internal calculations are finally evaluated and validated via implementation of the model in residential buildings, whose real costs on final payment of the works are known. As the level of definition and development of the project evolves, from preliminary study to basic project, the calculation improves in its level of efficiency and estimation accuracy, following the applied methodology: [successive approximations at finite intervals]. The basic hypothesis as above has been made, achieving a maximum deviation of one tenth, in the estimated calculation of the true cost of predimensioning work. The cost calculation for material execution of the works is developed from functional “three‐dimensional” cubic parameters for the planned space and constructive “two dimensional” metric parameters for the surface that envelopes around the facade and the building’s footprint on the plot. The functional and building costs are analyzed at every stage of the process of calculation with “thematic/specific” parameters of management (Pg), project (Pp) and execution (Pe) of the estimated work in question, and finally the cost of contractual construction is estimated, as a consequence of increasing the cost of material execution with the percentage pertaining to the thematic/specific parameter of the projected work. The construction cost‐scaling Pcr.5n model will be a useful tool of great interest in the professional field to estimate the cost of the Basic Project as prescribed in the technical and legal framework of application. According to the appendix of the Technical Building Code (CTE), it is compulsory that the basic project contains an “approximate valuation of the material execution of the work, projected by chapters”, that is, that the basic project must contain at least an “approximate estimate” by chapter, trade or technology. This approximate estimate in the Basic Project is to be performed through the cost‐scaling technique, given that structural calculations, reconditioning plans and definitive contruction details of the envelope are still not available at this stage of the architectural project, insofar as specifications pertaining to the later project have not yet been developed. This approximate estimate of the cost of the works is easy to calculate through the implementation of the given model, both for students and professionals of the building sector. As explained and justified in this work, the implementation of the model for cost‐scaling during the preliminary stage is fast and accurate, as well as easy to apply both in single‐family houses (detached and semi‐detached) and collective housing (blocks). The model can also be applied in the field of the real‐estate valuation, official appraisal, analysis of the economic viability of real estate developments, estimate of the cost of finished projects and, generally, when an implementation project is not available and it is necessary to calculate the building costs of the projected works. The model can also be applied to check estimates calculated by the traditional analytical method (state of measurements broken down into price per unit cost details), both in private works and those promoted by Public Authorities. Finally, as potential lines for future research, the “five levels of calculation cost‐scaling model”, could be adapted and applied to purposes and typologies other than the residential one, such as service buildings and public facilities, valuation of historical buildings, interior and exterior development works, park and garden planning, etc… These lines of investigation are parallel to this one and, by way of a preview, can be found in the dissertations given in the International Congresses Scieconf/June 2013, Rics‐Cobra/September 2013 and in the IV Congress on building pathology ‐Ucam/April 2014.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Negative co-occurrence is a common phenomenon in many signal processing applications. In some cases the signals involved are sparse, and this information can be exploited to recover them. In this paper, we present a sparse learning approach that explicitly takes into account negative co-occurrence. This is achieved by adding a novel penalty term to the LASSO cost function based on the cross-products between the reconstruction coefficients. Although the resulting optimization problem is non-convex, we develop a new and efficient method for solving it based on successive convex approximations. Results on synthetic data, for both complete and overcomplete dictionaries, are provided to validate the proposed approach.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Uno de los retos a los que se enfrenta la humanidad es la demanda de una sociedad con casi cero residuos: la búsqueda de una economía más eficiente en el uso de los recursos teniendo en cuenta el cambio climático y un abastecimiento sostenible de materias primas que permitan satisfacer las necesidades de una población mundial cada vez mayor, dentro de los límites sostenibles de los recursos naturales del planeta. Abordar este desafío implica la recuperación y reciclaje de materiales para reducir consumos de materias primas y, para ello, debe promoverse la innovación en la prevención y gestión de residuos, como estrategia hacia un desarrollo urbano sostenible. Los envases y embalajes forman parte de la cultura actual, relacionándose con el grado de desarrollo de países y regiones; el sector de la construcción no es ajeno a la problemática y genera un importante volumen de embalajes en las obras que no se gestionan de forma adecuada. El modelo de gestión de Residuos de Construcción Demolición (RCD) actual es poco eficaz, ya que los vertederos siguen recibiendo grandes cantidades de residuos valorizables. La normativa ha conseguido minimizar las prácticas ilegales, pero se comprueba que la gestión actual de los RCD en obra deja en manos de las plantas de tratamiento la misión de separar los residuos según su naturaleza y los datos aportados por las distintas plantas no permiten afirmar el grado de alcance de dicho objetivo, ni el destino de los mismos. Los envases y embalajes son un tipo de residuos que por su naturaleza suponen una fuente de recursos valorizables y por ello están presentes en directivas y leyes, dirigidas fundamentalmente al sector de la alimentación. En el ámbito de la construcción, hasta la fecha, no se habían tratado de forma específica, motivo que justifica este trabajo. Esta Tesis Doctoral tiene como objetivo principal mejorar la gestión de residuos de embalajes procedentes de materiales de construcción. Para ello se estudia un importante conjunto de obras de edificación residencial colectiva de 1173 viviendas, análisis que llevará a conocer los patrones de producción de los Residuos de Envases y Embalajes en Construcción (REEC) e identificar los productos o materiales responsables de su generación. La monitorización realizada, permitirá diseñar estrategias específicas que minimicen la generación de estos residuos y optimicen su valorización. Se ha podido comprobar que el tratamiento particularizado de los REEC puede mejorar los resultados de la gestión del conjunto de RCD, debido a que, al no mezclarse, se elimina un importante agente contaminador de los residuos inertes. Las obras analizadas alcanzan un nivel de segregación in situ muy bajo, y los capítulos de cerramientos e instalaciones suman más del 50% del global de REEC. Particularizando en cada tipo de material, el cartón predomina en los trabajos de electricidad, el plástico en las particiones y la madera en fachadas. Se evalúa la opción del eco-­‐rediseño para uno de los embalajes predominantes, y se identifican estrategias para minimizar su impacto. Se comprueba que el ahorro en la gestión de RCD en caso de impulsar la segregación in situ no es muy significativo en las obras estudiadas, si bien se demuestra que la viabilidad económica es el factor más importante para motivar a las empresas constructoras. Las Administraciones Públicas deberían incentivar la gestión responsable, estableciendo medidas de control en las plantas de tratamiento e implementando en sus obras medidas de gestión de RCD ejemplares para el mercado. Una adecuada planificación de la obra, y formación específica para el personal son medidas que facilitan la segregación in situ y mejoran los resultados. Los promotores, mediante su relación contractual con el resto de agentes, tienen la capacidad de establecer objetivos de reducción, planificación y gestión sostenible de los REEC. Por último, se propone un sistema de gestión de REEC, integrable dentro del Sistema de Gestión de la empresa constructora, que permite evitar que residuos valorizables tales como los envases y embalajes se envíen a vertedero, guiando al sector hacia un futuro más respetuoso, alineado con el desarrollo sostenible. ABSTRACT One of the challenges humanity faces is the demand of an almost zero waste society: the search for a more efficient economy in the use of resources, taking into account climate change and a sustainable supply of raw materials, that meet the needs of an increasing world population within the sustainable limits of the planet's natural resources. Addressing this challenge involves the recovery and recycling of materials to reduce consumption of raw materials, so innovation must therefore be promoted in the prevention and management of waste, as a strategy towards a sustainable urban development. Packaging is part of our current culture and is related to the degree of development of countries and regions; the construction sector is no stranger to this problem and generates a significant amount of packaging waste in the site works, which nowadays is not managed properly. The current Construction Demolition Waste (CDW) management model is ineffective, since landfills continue to receive large amounts of recoverable waste. The legislation has managed to minimize illegal practices, but it has been observed that the current management of CDW in the analysed works leaves the mission of separating waste according to their nature to the plants, and data provided by the latter does not allow for checking the scope of this objective, nor the destiny of the waste. Packaging is a type of waste which, by its nature, represents a source of recoverable resources and is therefore present in directives and laws, focused primarily on the food industry. It has not been specifically treated to date in the construction field, hence the reason that justifies this work. This Thesis aims to improve the management of packaging waste from construction materials. An important set of residential building works with 1173 dwellings is analysed, which leads to knowledge on the production patterns of packaging waste (PW) in the construction industry, and the identification of the products responsible for its generation. The monitorization also allows for the design of specific strategies which minimise the generation of waste and optimize recovery. It has been found that the individualized treatment of PW can improve the results of the management of the whole CDW since, when not mixed, a major pollutant of inert waste is removed. The analysed works reached a very low segregation level and the façades and building services phases account for more than 50% of the overall PW. Focusing on each type of material, cardboard predominates electricity works, plastic on partitions and wood on façades. Eco-­‐redesign is evaluated for one of the predominant packages, and strategies are identified to minimise their impact are . There is evidence that the savings in the CDW management in case of promoting segregation on site are not very significant at the studied works, although economic feasibility is the most important factor to motivate the construction companies. Public Administrations should encourage responsible management, establishing control measures in treatment plants and implementing CDW management exemplary measures on their work sites for the market. A proper planning of the works and specific training for the personnel are measures that facilitate in situ segregation and improve outcomes. The developers, through their contractual relationship with the other agents, have the ability to set reduction targets, planning and sustainable management of PW. Finally, a management system for PW is proposed, integrated within the Management System of the construction company, which aims to avoid that recoverable waste such as packaging is sent to landfill, leading the industry towards a more environmentally friendly future, aligned with sustainable development.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Underspanned suspension bridges are structures with important economical and aesthetic advantages, due to their high structural efficiency. However, road bridges of this typology are still uncommon because of limited knowledge about this structural system. In particular, there remains some uncertainty over the dynamic behaviour of these bridges, due to their extreme lightness. The vibrations produced by vehicles crossing the viaduct are one of the main concerns. In this work, traffic-induced dynamic effects on this kind of viaduct are addressed by means of vehicle-bridge dynamic interaction models. A finite element method is used for the structure, and multibody dynamic models for the vehicles, while interaction is represented by means of the penalty method. Road roughness is included in this model in such a way that the fact that profiles under left and right tyres are different, but not independent, is taken into account. In addition, free software {PRPgenerator) to generate these profiles is presented in this paper. The structural dynamic sensitivity of underspanned suspension bridges was found to be considerable, as well as the dynamic amplification factors and deck accelerations. It was also found that vehicle speed has a relevant influence on the results. In addition, the impact of bridge deformation on vehicle vibration was addressed, and the effect on the comfort of vehicle users was shown to be negligible.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We propose a new algorithm for the design of prediction structures with low delay and limited penalty in the rate-distortion performance for multiview video coding schemes. This algorithm constitutes one of the elements of a framework for the analysis and optimization of delay in multiview coding schemes that is based in graph theory. The objective of the algorithm is to find the best combination of prediction dependencies to prune from a multiview prediction structure, given a number of cuts. Taking into account the properties of the graph-based analysis of the encoding delay, the algorithm is able to find the best prediction dependencies to eliminate from an original prediction structure, while limiting the number of cut combinations to evaluate. We show that this algorithm obtains optimum results in the reduction of the encoding latency with a lower computational complexity than exhaustive search alternatives.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Optical filters are crucial elements in optical communications. The influence of cascaded filters in the optical signal will affect the communications quality seriously. In this paper we will study and simulate the optical signal impairment caused by different kinds of filters which include Butterworth, Bessel, Fiber Bragg Grating (FBG) and Fabry-Perot (FP). Optical signal impairment is analyzed from an Eye Opening Penalty (EOP) and optical spectrum point of view. The simulation results show that when the center frequency of all filters aligns with the laser’s frequency, the Butterworth has the smallest influence to the signal while the F-P has the biggest. With a -1dB EOP, the amount of cascaded Butterworth optical filters with a bandwidth of 50 GHz is 18 in 40 Gbps NRZ-DQPSK systems and 12 in 100 Gbps PMNRZ- DQPSK systems. The value is reduced to 9 and 6 respectively for Febry-Perot optical filters. In the situation of frequency misalignment, the impairment caused by filters is more serious. Our research shows that with a frequency deviation of 5 GHz, only 12 and 9 Butterworth optical filters can be cascaded in 40 Gbps NRZ-DQPSK and 100 Gbps PM-NRZ-DQPSK systems respectively. We also study the signal impairment caused by different orders of the Butterworth filter model. Our study shows that although the higher-order has a smaller clipping effect in the transmission spectrum, it will introduce a more serious phase ripple which seriously affects the signal. Simulation result shows that the 2nd order Butterworth filter has the best performance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The hot-spot phenomenon is a relatively frequent problem occurring in current photovoltaic generators. It entails both a risk for the photovoltaic module’s lifetime and a decrease in its operational efficiency. Nevertheless, there is still a lack of widely accepted procedures for dealing with them in practice. This paper presents the IES–UPM observations on 200 affected photovoltaic modules. Visual and infrared inspection, as well as electroluminescence, peak power rating and operating voltage tests have been carried out. Thermography under steady state conditions and photovoltaic module operating voltage, both at normal photovoltaic system operating conditions, are the selected methods to deal in practice with hot-spots. The temperature difference between the hot-spot and its surroundings, and the operating voltage differences between affected and non-affected photovoltaic modules are the base for establishing defective criteria, at the lights of both lifetime and operating efficiency considerations. Hot-spots temperature gradients larger than 20 °C, in any case, and larger than 10 °C when, at the same time, voltage operating losses are larger than the allowable power losses fixed at the photovoltaic module warranties, are proposed as rejecting conditions for routine inspections under contractual frameworks. The upper threshold of 20 °C is deduced for temperate climates from the basic criterion of keeping absolute hot-spot temperatures below 20 °C.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Chemical-looping combustion allows an integration of CO2 capture in a thermal power plant without energy penalty; secondly, a less exergy destruction in the combustion chemical transformation is achieved, leading to a greater overall thermal efficiency. This paper focus on the study of the energetic performance of this concept of combustion in an integrated gasification combined cycle power plant when synthesis gas is used as fuel for the gas turbines. After thermodynamic modelling and optimization of some cycle parameters, the power plant performance is evaluated under diverse working conditions and compared to a conventional integrated gasification combined cycle with precombustion capture. Energy savings in CO2 capture and storage has been quantified. The overall efficiency increase is found to be significant and even notable, reaching values of around 7%. In order to analyze the influence of syngas composition on the results, different H2-content fuels are considered.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

La combustión mediante lazo químico permite una integración de captura de CO2 en una planta térmica de potencia sin penalización energética. Se alcanza una menor destrucción exergética, alcanzándose un rendimiento térmico idóneo. Este proyecto se centra en el estudio del rendimiento energético en una planta de potencia con gasificación integrada cuando la cámara de combustión de las turbinas de gas se sustituye por un sistema de combustión CLC. Después del diseño termodinámico y optimización de algunos parámetros del ciclo, el rendimiento de la planta de potencia es evaluado bajo distintas condiciones de trabajo y comparado con el que se obtendría en una planta de ciclo combinado convencional con gasificación integrada y captura pre-combustión. Abstract Chemical-looping combustion allows an integration of CO2 capture in a thermal power plant without energy penalty. A less exergy destruction in the combustion chemical transformation is achieved, leading to a greater overall thermal efficiency. This Project focus on the study of the energetic performance in a cycle power plant with integrated gasification when the chamber combustion is supplied by a combustion system CLC. After thermodynamic modeling and optimization of some cycle parameters, the power plant performance is evaluated under diverse working conditions and compared to a conventional integrated gasification combined cycle with pre-combustion capture.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

La frecuencia con la que se producen explosiones sobre edificios, ya sean accidentales o intencionadas, es reducida, pero sus efectos pueden ser catastróficos. Es deseable poder predecir de forma suficientemente precisa las consecuencias de estas acciones dinámicas sobre edificaciones civiles, entre las cuales las estructuras reticuladas de hormigón armado son una tipología habitual. En esta tesis doctoral se exploran distintas opciones prácticas para el modelado y cálculo numérico por ordenador de estructuras de hormigón armado sometidas a explosiones. Se emplean modelos numéricos de elementos finitos con integración explícita en el tiempo, que demuestran su capacidad efectiva para simular los fenómenos físicos y estructurales de dinámica rápida y altamente no lineales que suceden, pudiendo predecir los daños ocasionados tanto por la propia explosión como por el posible colapso progresivo de la estructura. El trabajo se ha llevado a cabo empleando el código comercial de elementos finitos LS-DYNA (Hallquist, 2006), desarrollando en el mismo distintos tipos de modelos de cálculo que se pueden clasificar en dos tipos principales: 1) modelos basados en elementos finitos de continuo, en los que se discretiza directamente el medio continuo mediante grados de libertad nodales de desplazamientos; 2) modelos basados en elementos finitos estructurales, mediante vigas y láminas, que incluyen hipótesis cinemáticas para elementos lineales o superficiales. Estos modelos se desarrollan y discuten a varios niveles distintos: 1) a nivel del comportamiento de los materiales, 2) a nivel de la respuesta de elementos estructurales tales como columnas, vigas o losas, y 3) a nivel de la respuesta de edificios completos o de partes significativas de los mismos. Se desarrollan modelos de elementos finitos de continuo 3D muy detallados que modelizan el hormigón en masa y el acero de armado de forma segregada. El hormigón se representa con un modelo constitutivo del hormigón CSCM (Murray et al., 2007), que tiene un comportamiento inelástico, con diferente respuesta a tracción y compresión, endurecimiento, daño por fisuración y compresión, y rotura. El acero se representa con un modelo constitutivo elastoplástico bilineal con rotura. Se modeliza la geometría precisa del hormigón mediante elementos finitos de continuo 3D y cada una de las barras de armado mediante elementos finitos tipo viga, con su posición exacta dentro de la masa de hormigón. La malla del modelo se construye mediante la superposición de los elementos de continuo de hormigón y los elementos tipo viga de las armaduras segregadas, que son obligadas a seguir la deformación del sólido en cada punto mediante un algoritmo de penalización, simulando así el comportamiento del hormigón armado. En este trabajo se denominarán a estos modelos simplificadamente como modelos de EF de continuo. Con estos modelos de EF de continuo se analiza la respuesta estructural de elementos constructivos (columnas, losas y pórticos) frente a acciones explosivas. Asimismo se han comparado con resultados experimentales, de ensayos sobre vigas y losas con distintas cargas de explosivo, verificándose una coincidencia aceptable y permitiendo una calibración de los parámetros de cálculo. Sin embargo estos modelos tan detallados no son recomendables para analizar edificios completos, ya que el elevado número de elementos finitos que serían necesarios eleva su coste computacional hasta hacerlos inviables para los recursos de cálculo actuales. Adicionalmente, se desarrollan modelos de elementos finitos estructurales (vigas y láminas) que, con un coste computacional reducido, son capaces de reproducir el comportamiento global de la estructura con una precisión similar. Se modelizan igualmente el hormigón en masa y el acero de armado de forma segregada. El hormigón se representa con el modelo constitutivo del hormigón EC2 (Hallquist et al., 2013), que también presenta un comportamiento inelástico, con diferente respuesta a tracción y compresión, endurecimiento, daño por fisuración y compresión, y rotura, y se usa en elementos finitos tipo lámina. El acero se representa de nuevo con un modelo constitutivo elastoplástico bilineal con rotura, usando elementos finitos tipo viga. Se modeliza una geometría equivalente del hormigón y del armado, y se tiene en cuenta la posición relativa del acero dentro de la masa de hormigón. Las mallas de ambos se unen mediante nodos comunes, produciendo una respuesta conjunta. En este trabajo se denominarán a estos modelos simplificadamente como modelos de EF estructurales. Con estos modelos de EF estructurales se simulan los mismos elementos constructivos que con los modelos de EF de continuo, y comparando sus respuestas estructurales frente a explosión se realiza la calibración de los primeros, de forma que se obtiene un comportamiento estructural similar con un coste computacional reducido. Se comprueba que estos mismos modelos, tanto los modelos de EF de continuo como los modelos de EF estructurales, son precisos también para el análisis del fenómeno de colapso progresivo en una estructura, y que se pueden utilizar para el estudio simultáneo de los daños de una explosión y el posterior colapso. Para ello se incluyen formulaciones que permiten considerar las fuerzas debidas al peso propio, sobrecargas y los contactos de unas partes de la estructura sobre otras. Se validan ambos modelos con un ensayo a escala real en el que un módulo con seis columnas y dos plantas colapsa al eliminar una de sus columnas. El coste computacional del modelo de EF de continuo para la simulación de este ensayo es mucho mayor que el del modelo de EF estructurales, lo cual hace inviable su aplicación en edificios completos, mientras que el modelo de EF estructurales presenta una respuesta global suficientemente precisa con un coste asumible. Por último se utilizan los modelos de EF estructurales para analizar explosiones sobre edificios de varias plantas, y se simulan dos escenarios con cargas explosivas para un edificio completo, con un coste computacional moderado. The frequency of explosions on buildings whether they are intended or accidental is small, but they can have catastrophic effects. Being able to predict in a accurate enough manner the consequences of these dynamic actions on civil buildings, among which frame-type reinforced concrete buildings are a frequent typology is desirable. In this doctoral thesis different practical options for the modeling and computer assisted numerical calculation of reinforced concrete structures submitted to explosions are explored. Numerical finite elements models with explicit time-based integration are employed, demonstrating their effective capacity in the simulation of the occurring fast dynamic and highly nonlinear physical and structural phenomena, allowing to predict the damage caused by the explosion itself as well as by the possible progressive collapse of the structure. The work has been carried out with the commercial finite elements code LS-DYNA (Hallquist, 2006), developing several types of calculation model classified in two main types: 1) Models based in continuum finite elements in which the continuous medium is discretized directly by means of nodal displacement degrees of freedom; 2) Models based on structural finite elements, with beams and shells, including kinematic hypothesis for linear and superficial elements. These models are developed and discussed at different levels: 1) material behaviour, 2) response of structural elements such as columns, beams and slabs, and 3) response of complete buildings or significative parts of them. Very detailed 3D continuum finite element models are developed, modeling mass concrete and reinforcement steel in a segregated manner. Concrete is represented with a constitutive concrete model CSCM (Murray et al., 2007), that has an inelastic behaviour, with different tension and compression response, hardening, cracking and compression damage and failure. The steel is represented with an elastic-plastic bilinear model with failure. The actual geometry of the concrete is modeled with 3D continuum finite elements and every and each of the reinforcing bars with beam-type finite elements, with their exact position in the concrete mass. The mesh of the model is generated by the superposition of the concrete continuum elements and the beam-type elements of the segregated reinforcement, which are made to follow the deformation of the solid in each point by means of a penalty algorithm, reproducing the behaviour of reinforced concrete. In this work these models will be called continuum FE models as a simplification. With these continuum FE models the response of construction elements (columns, slabs and frames) under explosive actions are analysed. They have also been compared with experimental results of tests on beams and slabs with various explosive charges, verifying an acceptable coincidence and allowing a calibration of the calculation parameters. These detailed models are however not advised for the analysis of complete buildings, as the high number of finite elements necessary raises its computational cost, making them unreliable for the current calculation resources. In addition to that, structural finite elements (beams and shells) models are developed, which, while having a reduced computational cost, are able to reproduce the global behaviour of the structure with a similar accuracy. Mass concrete and reinforcing steel are also modeled segregated. Concrete is represented with the concrete constitutive model EC2 (Hallquist et al., 2013), which also presents an inelastic behaviour, with a different tension and compression response, hardening, compression and cracking damage and failure, and is used in shell-type finite elements. Steel is represented once again with an elastic-plastic bilineal with failure constitutive model, using beam-type finite elements. An equivalent geometry of the concrete and the steel is modeled, considering the relative position of the steel inside the concrete mass. The meshes of both sets of elements are bound with common nodes, therefore producing a joint response. These models will be called structural FE models as a simplification. With these structural FE models the same construction elements as with the continuum FE models are simulated, and by comparing their response under explosive actions a calibration of the former is carried out, resulting in a similar response with a reduced computational cost. It is verified that both the continuum FE models and the structural FE models are also accurate for the analysis of the phenomenon of progressive collapse of a structure, and that they can be employed for the simultaneous study of an explosion damage and the resulting collapse. Both models are validated with an experimental full-scale test in which a six column, two floors module collapses after the removal of one of its columns. The computational cost of the continuum FE model for the simulation of this test is a lot higher than that of the structural FE model, making it non-viable for its application to full buildings, while the structural FE model presents a global response accurate enough with an admissible cost. Finally, structural FE models are used to analyze explosions on several story buildings, and two scenarios are simulated with explosive charges for a full building, with a moderate computational cost.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El consumo de combustible en un automóvil es una característica que se intenta mejorar continuamente debido a los precios del carburante y a la creciente conciencia medioambiental. Esta tesis doctoral plantea un algoritmo de optimización del consumo que tiene en cuenta las especificaciones técnicas del vehículo, el perfil de orografía de la carretera y el tráfico presente en ella. El algoritmo de optimización calcula el perfil de velocidad óptima que debe seguir el vehículo para completar un recorrido empleando un tiempo de viaje especificado. El cálculo del perfil de velocidad óptima considera los valores de pendiente de la carretera así como también las condiciones de tráfico vehicular de la franja horaria en que se realiza el recorrido. El algoritmo de optimización reacciona ante condiciones de tráfico cambiantes y adapta continuamente el perfil óptimo de velocidad para que el vehículo llegue al destino cumpliendo el horario de llegada establecido. La optimización de consumo es aplicada en vehículos convencionales de motor de combustión interna y en vehículos híbridos tipo serie. Los datos de consumo utilizados por el algoritmo de optimización se obtienen mediante la simulación de modelos cuasi-estáticos de los vehículos. La técnica de minimización empleada por el algoritmo es la Programación Dinámica. El algoritmo divide la optimización del consumo en dos partes claramente diferenciadas y aplica la Programación Dinámica sobre cada una de ellas. La primera parte corresponde a la optimización del consumo del vehículo en función de las condiciones de tráfico. Esta optimización calcula un perfil de velocidad promedio que evita, cuando es posible, las retenciones de tráfico. El tiempo de viaje perdido durante una retención de tráfico debe recuperarse a través de un aumento posterior de la velocidad promedio que incrementaría el consumo del vehículo. La segunda parte de la optimización es la encargada del cálculo de la velocidad óptima en función de la orografía y del tiempo de viaje disponible. Dado que el consumo de combustible del vehículo se incrementa cuando disminuye el tiempo disponible para finalizar un recorrido, esta optimización utiliza factores de ponderación para modular la influencia que tiene cada una de estas dos variables en el proceso de minimización. Aunque los factores de ponderación y la orografía de la carretera condicionan el nivel de ahorro de la optimización, los perfiles de velocidad óptima calculados logran ahorros de consumo respecto de un perfil de velocidad constante que obtiene el mismo tiempo de recorrido. Las simulaciones indican que el ahorro de combustible del vehículo convencional puede lograr hasta un 8.9% mientras que el ahorro de energía eléctrica del vehículo híbrido serie un 2.8%. El algoritmo fusiona la optimización en función de las condiciones del tráfico y la optimización en función de la orografía durante el cálculo en tiempo real del perfil óptimo de velocidad. La optimización conjunta se logra cuando el perfil de velocidad promedio resultante de la optimización en función de las condiciones de tráfico define los valores de los factores de ponderación de la optimización en función de la orografía. Aunque el nivel de ahorro de la optimización conjunta depende de las condiciones de tráfico, de la orografía, del tiempo de recorrido y de las características propias del vehículo, las simulaciones indican ahorros de consumo superiores al 6% en ambas clases de vehículo respecto a optimizaciones que no logran evitar retenciones de tráfico en la carretera. ABSTRACT Fuel consumption of cars is a feature that is continuously being improved due to the fuel price and an increasing environmental awareness. This doctoral dissertation describes an optimization algorithm to decrease the fuel consumption taking into account the technical specifications of the vehicle, the terrain profile of the road and the traffic conditions of the trip. The algorithm calculates the optimal speed profile that completes a trip having a specified travel time. This calculation considers the road slope and the expected traffic conditions during the trip. The optimization algorithm is also able to react to changing traffic conditions and tunes the optimal speed profile to reach the destination within the specified arrival time. The optimization is applied on a conventional vehicle and also on a Series Hybrid Electric vehicle (SHEV). The fuel consumption optimization algorithm uses data obtained from quasi-static simulations. The algorithm is based on Dynamic Programming and divides the fuel consumption optimization problem into two parts. The first part of the optimization process reduces the fuel consumption according to foreseeable traffic conditions. It calculates an average speed profile that tries to avoid, if possible, the traffic jams on the road. Traffic jams that delay drivers result in higher vehicle speed to make up for lost time. A higher speed of the vehicle within an already defined time scheme increases fuel consumption. The second part of the optimization process is in charge of calculating the optimal speed profile according to the road slope and the remaining travel time. The optimization tunes the fuel consumption and travel time relevancies by using two penalty factors. Although the optimization results depend on the road slope and the travel time, the optimal speed profile produces improvements of 8.9% on the fuel consumption of the conventional car and of 2.8% on the spent energy of the hybrid vehicle when compared with a constant speed profile. The two parts of the optimization process are combined during the Real-Time execution of the algorithm. The average speed profile calculated by the optimization according to the traffic conditions provides values for the two penalty factors utilized by the second part of the optimization process. Although the savings depend on the road slope, traffic conditions, vehicle features, and the remaining travel time, simulations show that this joint optimization process can improve the energy consumption of the two vehicles types by more than 6%.