5 resultados para Military government

em Massachusetts Institute of Technology


Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the 1980’s, many United States industrial organizations started developing new production processes to improve quality, reduce cost, and better respond to customer needs and the pressures of global competition. This new paradigm was coined Lean Production (or simply “Lean”) in the book The Machine That Changed The World published in 1990 by researchers from MIT’s International Motor Vehicle Program. In 1993, a consortium of US defense aerospace firms and the USAF Aeronautical Systems Center, together with the AFRL Materials and Manufacturing Directorate, started the Lean Aircraft Initiative (LAI) at MIT. With expansion in 1998 to include government space products, the program was renamed the Lean Aerospace Initiative. LAI’s vision is to “Significantly reduce the cost and cycle time for military aerospace products throughout the entire value chain while continuing to improve product performance.” By late 1998, 23 industry and 13 government organizations with paying memberships, along with MIT and the UAW were participating in the LAI.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Free-word order languages have long posed significant problems for standard parsing algorithms. This thesis presents an implemented parser, based on Government-Binding (GB) theory, for a particular free-word order language, Warlpiri, an aboriginal language of central Australia. The words in a sentence of a free-word order language may swap about relatively freely with little effect on meaning: the permutations of a sentence mean essentially the same thing. It is assumed that this similarity in meaning is directly reflected in the syntax. The parser presented here properly processes free word order because it assigns the same syntactic structure to the permutations of a single sentence. The parser also handles fixed word order, as well as other phenomena. On the view presented here, there is no such thing as a "configurational" or "non-configurational" language. Rather, there is a spectrum of languages that are more or less ordered. The operation of this parsing system is quite different in character from that of more traditional rule-based parsing systems, e.g., context-free parsers. In this system, parsing is carried out via the construction of two different structures, one encoding precedence information and one encoding hierarchical information. This bipartite representation is the key to handling both free- and fixed-order phenomena. This thesis first presents an overview of the portion of Warlpiri that can be parsed. Following this is a description of the linguistic theory on which the parser is based. The chapter after that describes the representations and algorithms of the parser. In conclusion, the parser is compared to related work. The appendix contains a substantial list of test cases ??th grammatical and ungrammatical ??at the parser has actually processed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This white paper reports emerging findings at the end of Phase I of the Lean Aircraft Initiative in the Policy focus group area. Specifically, it provides details about research on program instability. Its objective is to discuss high-level findings detailing: 1) the relative contribution of different factors to a program’s overall instability; 2) the cost impact of program instability on acquisition programs; and 3) some strategies recommended by program managers for overcoming and/or mitigating the negative effects of program instability on their programs. Because this report comes as this research is underway, this is not meant to be a definitive document on the subject. Rather, is it anticipated that this research may potentially produce a number of reports on program instability-related topics. The government managers of military acquisition programs rated annual budget or production rate changes, changes in requirements, and technical difficulties as the three top contributors, respectively, to program instability. When asked to partition actual variance in their program’s planned cost and schedule to each of these factors, it was found that the combined effects of unplanned budget and requirement changes accounted for 5.2% annual cost growth and 20% total program schedule slip. At a rate of approximately 5% annual cost growth from these factors, it is easy to see that even conservative estimates of the cost benefits to be gained from acquisition reforms and process improvements can quickly be eclipsed by the added cost associated with program instability. Program management practices involving the integration of stakeholders from throughout the value chain into the decision making process were rated the most effective at avoiding program instability. The use of advanced information technologies was rated the most effective at mitigating the negative impact of program instability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This white paper reports emerging findings at the end of Phase I of the Lean Aircraft Initiative in the Policy focus group area. Specifically, it provides details about research on program instability. Its objective is to discuss high-level findings detailing: 1) the relative contribution of different factors to a program’s overall instability; 2) the cost impact of program instability on acquisition programs; and 3) some strategies recommended by program managers for overcoming and/or mitigating the negative effects of program instability on their programs. Because this report comes as this research is underway, this is not meant to be a definitive document on the subject. Rather, is it anticipated that this research may potentially produce a number of reports on program instability-related topics. The government managers of military acquisition programs rated annual budget or production rate changes, changes in requirements, and technical difficulties as the three top contributors, respectively, to program instability. When asked to partition actual variance in their program’s planned cost and schedule to each of these factors, it was found that the combined effects of unplanned budget and requirement changes accounted for 5.2% annual cost growth and 20% total program schedule slip. At a rate of approximately 5% annual cost growth from these factors, it is easy to see that even conservative estimates of the cost benefits to be gained from acquisition reforms and process improvements can quickly be eclipsed by the added cost associated with program instability. Program management practices involving the integration of stakeholders from throughout the value chain into the decision making process were rated the most effective at avoiding program instability. The use of advanced information technologies was rated the most effective at mitigating the negative impact of program instability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper examines key aspects of Japanese Government personnel practices, and draws comparisons with the practices in the U.S. civil service and, as appropriate, with other U.S. models. Particular reference is made to the practices of two major agencies in Japan, the Ministry of International Trade and Industry (MITI) and the Ministry of Posts and Telecommunications (MPT). As appropriate, selected government businesses practices other than personnel practices are noted.