47 resultados para lime kiln
em University of Michigan
Resumo:
The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Bibliography: leaves 110-117.
Resumo:
Absorbed Directory of cement, gypsum, lime, sand, gravel and crushed-stone plants in 1930 and assumed its volume numbering.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Exhibit guide inserted.
Resumo:
"May 1983."
Resumo:
"In cooperation with the Illinois Department of Transportation."
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
"Issued May 1946."