14 resultados para Pollutant dispersions
em University of Michigan
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Chiefly tables.
Resumo:
March 1980.
Resumo:
Mode of access: Internet.
Resumo:
"Contract number 68-C9-0033 and Cooperative Agreement number CR-816862."
Resumo:
"Printed: March 1990."
Resumo:
At head of title: Preliminary and confidential. Copy no. 13.
Resumo:
Bibliography: p. 47-51.
Resumo:
Mode of access: Internet.
Resumo:
The establishment of a Total Maximum Daily Load sets the pollutant reduction goal necessary to improve impaired waters. It determines the load, or quantity of any given pollutant that can be allowed in a particular water body. A TDML must consider all potential sources of pollutants whether point or nonpoint. It also takes into account a margin of safety, which reflects scientific uncertainty, as well as the effects of seasonal variation.
Resumo:
Summary: On June 22, 2001, the groundwork was laid for the construction of new electric generation in the state of Illinois when the Illinois Resource Development and Energy Act was signed. Overwhelmingly approved by the Illinois General Assembly, this broad-based $3.5 billion package is designed to reinvigorate the Illinois coal industry and to strengthen the state's ability to provide electricity to its citizens. The legislation (Public Act 92-0012) provides tax incentives and financial assistance to builders of new electric plants generating in excess of 400 megawatts that create Illinois coal-mining jobs, new and expanding coal mines, and natural gas-fired baseload electric plants with a capacity of 1,000 megawatts. The legislation also directs the the Illinois Environmental Protection Agency to explore the need for a state-level, multi-pollutant strategy to reduce emissions from coal-fired electric generating plants.
Resumo:
This fact sheet is an outreach tool, designed to assist producers as they attempt to determine whether their operations require coverage under a CAFO National Pollutant Discharge Elimination System (NPEDS) permit. The following common livestock production scenarios and the correlating permitting status for each are designed to assist livestock producers in determining whether an operation requires a permit. A site evaluation by Agency staff may also provide design and operating criteria by which permit problems can be successfully reduced or avoided.