148 resultados para Borden Chemical Company (Illiopolis, Ill.)
Resumo:
"September 24, 1998."
Resumo:
Description based on: 1997; title from cover.
Resumo:
Includes bibliographies.
Resumo:
"December 2008"--Colophon.
Resumo:
"31642"--Colophon.
Resumo:
"December 4, 2008"
Resumo:
"November 1992."--Cover.
Resumo:
"June 1993."
Resumo:
Project no. 80.261.
Resumo:
The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.
Resumo:
"September 2003."
Resumo:
Translation of Einleitung indie chemische analyse
Resumo:
Issued, 1917- as Bulletin no. 15 of the Division of the State Water Surveys, Dept. of Registration and Education.
Resumo:
Includes bibliographical references.
Resumo:
Mode of access: Internet.