116 resultados para Alternative View
Resumo:
"August 1985."
Resumo:
Includes bibliographical references.
Resumo:
Prepared for the Cache River Joint Venture Partnership (JVP): Illinois Department of Natural Resources, The Nature Conservancy, U.S. Fish and Wildlife Service, Ducks Unlimited, Natural Resources Conservation Service.
Resumo:
Includes bibliographical references.
Resumo:
Cover title.
Resumo:
Sunset project manager : Terry H. Stoica.
Resumo:
Cover title.
Resumo:
"May 1, 1990."
Resumo:
Cover title.
Resumo:
"January 1973."
Resumo:
Vol. 2 has subtitle: Alternative proposal no. 2. Tables.
Resumo:
"Project no. 20.065."
Resumo:
This executive summary report summarizes the results of an alternative evaluation and preliminary design study for improvements to, or removal of, the Glen D. Palmer Dam in Yorkville, Illinois. This study was conducted to recommend the best method of improving the hydraulic conditions at the downstream face of the dam, reconnect the river with respect to fish movement, and provide safe canoe passage through the dam site. The recommended alternative was developed by working with a Citizen Advisory Committee to involve the public throughout the study.
Resumo:
Mode of access: Internet.
Resumo:
"April 1980."