67 resultados para project summary


Relevância:

30.00% 30.00%

Publicador:

Resumo:

"The Illinois Department of Natural Resources/Office of Water Resources(IDNR/OWR) is cooperating with the Village of Garrett to construct a flood control project under the authority of the Flood Control Act of 1945, 615 ILCS 15 (2004 State Bar Edition)."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Files pursuant to section 5 of the Flood Control Act of 1945, 615 ILCS 151."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This executive summary report summarizes the results of an alternative evaluation and preliminary design study for improvements to, or removal of, the Glen D. Palmer Dam in Yorkville, Illinois. This study was conducted to recommend the best method of improving the hydraulic conditions at the downstream face of the dam, reconnect the river with respect to fish movement, and provide safe canoe passage through the dam site. The recommended alternative was developed by working with a Citizen Advisory Committee to involve the public throughout the study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Includes bibliography.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"The objective of the project was to develop methods for establishing output and input performance standards for the placement and placement-support functions of the United States Employment Service (ES)."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Purdue Research Foundation. Fellowship no.997. Project Ae-24. This research was supported by the United States Army, through the office of Ordnance Research, under Contract no.DA33-008 ORD-888."