108 resultados para Office site selection


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Illinois EPA's initial evaluation of this site revealed problems such as erosion, exposed waste, low areas at the surface that allowed water to pond, and leachate seeps water that becomes contaminated after contact with landfill waste).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Contamination in soil and groundwater was found during an investigation of a property located on the east side of the Fox River in McHenry, at 3004 W. Elm Street (Route 120) during 2003-2006. The property, currently owned by Inverse Investments, Inc., is enrolled in an Illinois Environmental Protection Agency (Illinois EPA) cleanup program. It is the location of a car rental establishment. Gem Cleaners occupied the site from 1970 to 1977, after which it was occupied by a carpet dealer, an automotive repair facility, and a tire store. Historic use of solvents at the former dry cleaner location has resulted in contamination of the soil and groundwater with chlorinated organic compounds.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Description based on: 1984; title from cover.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"July 2007"

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In a 2002 Record of decision, the Illinois Environmental Protection Agency (IEPA) outlined remedies for four major sources of groundwater contamination found in the Southeast Rockford Groundwater Contamination Superfund Site. This fact sheet updates information on further investigations at the Area 4, Area 7, Area 9/10 and Area 11 locations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Accompanied by 50 facsimile reproductions of documents (36 cm.) in case.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Summer 1999"

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Annual supplement containing estimates for corn, soybeans, and wheat issued as: Illinois county estimates.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"September 2003."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Shipping list no.: 86-135-P.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Spine title: Site 45-OK-258, Chief Joseph Dam Project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Final report submitted to the U.S. Army Corps of Engineers, Seattle District ... Contract No. DACW67-78-C-0106."