196 resultados para software quality management
Resumo:
"December 1988."--Cover.
Resumo:
"IEPA/WPC/88-020."
Resumo:
Includes bibliographies.
Resumo:
"Project no. 10.090."
Resumo:
Best Management Practices or BMPs refer to operating techniques and good housekeeping principals for reducing and preventing environmental problems. The overall philosophy behind BMPs is to conduct everyday activities in a more environmentally sound manner. By using BMPs, a facility can help protect the environment, save money, and improve community well-being all at the same time.
Resumo:
"May 1991."
Resumo:
"May 1995."
Resumo:
According to Section 305(b) of the Clean Water Act (i.e. a generic name that refers to the Federal Water Pollution Control Act of 1972, the Clean Water Act of 1977, and subsequent amendments) and guidance provided by the United States Environmental Protection Agency (USEPA), each state must prepare and submit annually to the U.S. Congress and the USEPA report that describes the resource quality of the surface waters of the state. Every other year, this report, commonly referred to as the "305(b) report," must be provided in written form, whereas in alternate years each state may submit an electronic database to meet the reporting requirement. In the 305(b) report, states must also explain how they determined the resource quality of the waters of the state in terms of the degree to which predefined beneficial uses of those waters are supported. Also, in the 305(b) report when any designated use for any water body is not fully supported, the state must report potential reasons for the impairment. Herein, is explained how the Illinois Environmental Protection Agency determines the resource quality of Illinois streams, inland lakes, and Lake Michigan.
Resumo:
"May 2007"--T.p.
Resumo:
The city of Marion has applied to the Illinois EPA for Section 401 water quality certification to construct a 1,172 surface acre, raw water impoundment reservoir on Sugar Creek, southeast of Creal Springs, Williamson County, Illinois. This proposal and the impacts are described in the Final EIS, DSI, and DSII. The proposed project will involve the construction of a reservoir on Sugar Creek and the mitigation for affected wetlands and jurisdictional waters of the United States.
Resumo:
"IEPA/BOW/01-009."--Cover.
Resumo:
"October 1982."
Resumo:
"November 02, 1992."--Cover.
Resumo:
The establishment of a Total Maximum Daily Load sets the pollutant reduction goal necessary to improve impaired waters. It determines the load, or quantity of any given pollutant that can be allowed in a particular water body. A TDML must consider all potential sources of pollutants whether point or nonpoint. It also takes into account a margin of safety, which reflects scientific uncertainty, as well as the effects of seasonal variation.
Resumo:
The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.