507 resultados para Huron River (Oakland County--Monroe County, Mich.)
Resumo:
Signed by Chairman, N.B. Bradley...[et al].
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Typescript (carbon copy).
Resumo:
Includes bibliographical references and index.
Resumo:
Mode of access: Internet.
Resumo:
Instructions & blanks for submitting bids.
Resumo:
Mode of access: Internet.
Resumo:
The 17-acre landfill southwest of Decatur on the south bank of the Sangamon River was permitted in 1974 as a demolition debris landfill. It originated as an open dump in 1918. The site had a history of not complying with the state landfill rules in the 1980s. The landfill also exceeded its permitted waste disposal limits, by the time that the operations stopped in 1991. The owner failed to comply with an August 1994 court order requiring proper cover to be installed and maintained. Visible leachate seeps (leachate is water that has traveled through the landfill and contacts waste material) and exposed refuse were observed along the bank of the Sangamon River. ... This landfill was one of the 33 landfills in Illinois identified by the Illinois EPA in 1998 as most in need of immediate repairs. The state legislature responded by passing legislation that allocated $50 million over five years to address these 33 sites. These 33 landfills are being managed through the Abandoned Landfill Program.
Resumo:
Includes bibliographical references (p. [103]-109).
Resumo:
Illinois EPA's initial evaluation of this site revealed problems such as erosion, exposed waste, low areas at the surface that allowed water to pond, and leachate seeps water that becomes contaminated after contact with landfill waste).
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.
Resumo:
Includes 87 or more reports on individual lakes in Illinois; some will be updated periodically.
Resumo:
This executive summary report summarizes the results of an alternative evaluation and preliminary design study for improvements to, or removal of, the Glen D. Palmer Dam in Yorkville, Illinois. This study was conducted to recommend the best method of improving the hydraulic conditions at the downstream face of the dam, reconnect the river with respect to fish movement, and provide safe canoe passage through the dam site. The recommended alternative was developed by working with a Citizen Advisory Committee to involve the public throughout the study.
Resumo:
Cover title.