124 resultados para Property--New Jersey--Early works to 1800


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes reprints of original title-pages.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"[Prepared for the Princeton Whig, Feb., 1844.]"

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"The chapters here presented are the daily dispatches to the Philadelphia Record as I sent them during the tour of the state together with parts of my weekly letters preceding and during the campaign."--Introd.