366 resultados para Ashland Flood Control Project (Ill.)


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project staff: Laurie J. Batchelor ... [et al.].

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Description based on: 2000 edition.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Includes 87 or more reports on individual lakes in Illinois; some will be updated periodically.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"October 1994."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Description based on: FY 1989 (Sept. 1988) ; title from cover.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Latest issue consulted: Federal fiscal year 1988.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This executive summary report summarizes the results of an alternative evaluation and preliminary design study for improvements to, or removal of, the Glen D. Palmer Dam in Yorkville, Illinois. This study was conducted to recommend the best method of improving the hydraulic conditions at the downstream face of the dam, reconnect the river with respect to fish movement, and provide safe canoe passage through the dam site. The recommended alternative was developed by working with a Citizen Advisory Committee to involve the public throughout the study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In accordance with 15-ILCS 15/11, from Chapter 127, paragraph 1811, the following report is offered to summarize the reorganization of the Department of the Lottery, the Liquor Control Commission, and the Illinois Racing Board merger with the Department of Revenue, pursuant to Executive Order 9, which took effect on June 1, 2003. As part of the governor's ongoing effort to streamline state government and improve efficiency, the consolidation eliminated duplication by integrating administrative functions of the agencies with the Department of Revenue. The change resulted in savings of $3 million on an annual basis from 29 fewer positions and a reduction of leased office space at 7 Lottery locations throughout the state. Streamlined operations were achieved by merging human resource management, procurement, accounting, information technology, and other administrative support services. In addition, Lottery headquarters in Springfield and Chicago, as well as sales district office locations throughout the state were merged with existing Department of Revenue offices, significantly reducing state lease costs. Core functions of the Lottery, Liquor Control Commission, and Racing Board remain intact, and the boards and commission that oversee these entities retain their regulatory responsibilities. The department is considering recommending "clean-up" legislation to replace statutory references to the "Department of the Lottery" with the "Division of the Lottery" or "Department of Revenue Division of the Lottery".

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"The Sierra Cooperative Pilot Project, United States Department of the Interior, Bureau of Reclamation, Division of Research, Office of Atmospheric Resources Management, Denver, Colorado."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

[Conceptual Sketches], untitled. Brown ink sketches on shirt cardboard, 8x12 inches [from photographic copy by Lance Burgharrdt]