31 resultados para Transport Construction Project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Prepared for U.S. Army Engineer District, Mobile."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Work Performed in 1977 through 1981 Under Specifications No. DC-7292"

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"UNC-5014 (Volume A) Final Report covering the period 20 March 1961 - 31 May 1962."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Project 7719, Task 17124."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Prepared in cooperation with the Soil Conservation Service, USDA.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Description of a project to reduce ponding and flooding in Cortland by construction of a storm sewer and detention basin for runoff.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Prepared for Illinois Dept. of Energy and Natural Resources, Energy and Environmental Affairs Division.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The city of Marion has applied to the Illinois EPA for Section 401 water quality certification to construct a 1,172 surface acre, raw water impoundment reservoir on Sugar Creek, southeast of Creal Springs, Williamson County, Illinois. This proposal and the impacts are described in the Final EIS, DSI, and DSII. The proposed project will involve the construction of a reservoir on Sugar Creek and the mitigation for affected wetlands and jurisdictional waters of the United States.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Final Report, November 1997-October 1999."