347 resultados para Hazardous waste treatment facilities
Resumo:
"February 1997."
Resumo:
"HWRIC RR-057."
Resumo:
The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.
Resumo:
"September 2003."
Western Lion and Service Disposal #1 Landfill Sites : Loxa Road and Route 316, Charleston, Illinois.
Resumo:
"32322"--Colophon.
Resumo:
"B-231219."--P. [1].
Resumo:
Co-published: Illnois State Geological Survey, Hazardous Waste Research and Information Center.
Resumo:
"B-231219"--P. [1].
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Item 1045-A, 1045-B (microfiche)
Resumo:
"B-266331"--P. 1.
Resumo:
"November 17, 1992-Bennington, VT"--Pt. 2.
Resumo:
Prepared for the use of the Senate Committee on Labor and Public Welfare and the House Committee on Interstate and Foreign Commerce.
Resumo:
Mode of access: Internet.