200 resultados para Update summaries
Resumo:
Mode of access: Internet.
Resumo:
Description based on: 1999 ; title from cover.
Resumo:
"31642"--Colophon.
Resumo:
Caption title.
Resumo:
Description based on: Winter 1995.
Resumo:
Provides information on current legislation, recycling activities, grants and upcoming programs pertaining to solid waste issues in Illinois.
Resumo:
Cover title.
Resumo:
Previous plan prepared by the SCOPE 80's Task Force.
Resumo:
"August 2009."
Resumo:
"IEPA/ENV/02-018."
Resumo:
"November, 1987."
Resumo:
"LPU order 29356"--Colophon.
Resumo:
Title from caption.
Resumo:
"Prepared for State of Illinois, Department of Transportation, Division of Water Resources."
Resumo:
The potentially responsible parties (PRPs) have removed the beaver dams and have collected the sediment samples they need for treatability studies. The treatability studies will establish the correct silt fence to minimize releases of sediment during the actual dredging to occur this fall. The studies will also determine the types and amounts of materials (lime, kiln dust, fly ash, etc.) required to stabilize the sediment, chemically tie up the metals and insure the sediment mixture will bear the weight of the cap on the Interim Storage Cell where the sediment will be placed. The Illinois Environmental Protection Agency (Illinois EPA) anticipates work to be completed by late fall or early winter 2004, if lake and river levels that affect the South Ditch are at their normal seasonal levels.