978 resultados para water supply


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The supply of water to a centrifuge experiment has always been important. This paper details a new system which has been successfully commissioned for use on the geotechnical centrifuge at University of Cambridge. High water pressures and large flow rates were delivered to an experimental package, for the modelling of water injection-aided pile jacking. The practicalities of such a system are discussed in relation to existing alternatives, in addition to the precautions taken to ensure safe centrifuge operation. A method for calculating water pressures in the system away from instrumented locations is also proposed, using a linear relationship between energy per unit volume and the flow rate squared. Experimental data are presented to support these relationships.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The supply of water is often required during a centrifuge experiment. For the case of pile jetting, significant flow volumes and pressures are required from the water supply. This paper aims to detail the successful provision of water at high pressures and large flow rates to a centrifuge, using a novel water supply system. An impeller pump was used to pressurise the water in advance of the slip rings, with further pressure provided by the fluid accelerating along the centrifuge beam arm. A maximum pressure of 2 MPa and continuous flow rate of 6 litres per minute were achieved. The calculation of water pressure away from the measurement location is presented, offering a repeatable solution for the pressure at any point in the pipe work. © 2010 Taylor & Francis Group, London.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A site investigation was conducted to correlate the relationships between microcystins (MC) concentration and algal growth in Dianchi Lake in China. Laboratory experiments were undertaken to test the effects of sediment adsorption, photoirradiation and biodegradation on microcystins removal. Bioaccumulation of microcystins was also determined using silver carp fish. It was observed that MC concentrations varied in accordance with algae growth in Dianchi Lake. The results obtained in the laboratory demonstrated that the removal of MC with fresh sediments was less than 10%, photoirradiation removed more than 75% MC within two hours, and the biodegradation needed much longer time to produce substantial degradation of MC. The results suggest that bioaccumulation of microcystins in fish was not significant in Dianchi Lake.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper addresses the potential of public water operations in achieving developmental goals such as the Millennium Development Goals, and argues that the public sector has a comparative advantage in developing water services. The global importance of the public sector in urban water supply is examined through a review of current practice in the world's largest cities, including operational presence and distribution and ongoing trends. Empirical evidence shows that, in transition and developing countries, public operators are capable of undergoing successful reform. One explanatory factor is proposed to be the creation through the public sphere of highly interconnected networks among stakeholders. Such accountability networks act as vehicles for the generation and distribution of public knowledge among stakeholders, which in turn inform rational decision making on the reform and management of operations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report describes a novel technology for arsenic removal from groundwater. The work was carried out in India in collaboratio with three Indian and three European partners. European partners include Leiden University of the Netherlands and Stuttgart University of Germany. The work was funded by The World Bank.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Over the years, build-operate-transfer (BOT) has continuously attracted research interests. Many studies on BOT have been carried out. Variations of BOT such as build-own-operate-transfer and build-own-operate have also been reported in some relevant publications. However, few investigations thus far have been conducted for transfer-operate-transfer (TOT). Therefore, there is a knowledge gap in this particular field. TOT is a new model that is suitable for existing infrastructure and public utility projects formerly funded by the governments and currently operated by state-owned enterprises. It refers to the transfer of a running public project to a foreign business or domestic private entity. Based on four case studies carried out in the Chinese water supply industry, this paper examines why there is an increasing need for TOT projects and identifies the distinctive features of TOT practice in China. This is followed by an introduction of a framework of critical success factors (CSFs) for TOT projects. The most important factors include project profitability, asset quality, fair risk allocation, competitive tendering, internal coordination within government, employment of professional advisors, corporate governance, and government supervision. The identification of CSFs provides a useful guidance to project parties planning to participate in TOT practice.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The fast increase in the energy’s price has brought a growing concern about the highly expensive task of transporting water. By creating an hydraulic model of the Water Supply System’s (WSS) network and predicting its behaviour, it is possible to take advantage of the energy’s tariffs, reducing the total cost on pumping activities. This thesis was developed, in association with a technology transfer project called the E-Pumping. It focuses on finding a flexible supervision and control strategy, adaptable to any existent Water Supply System (WSS), as well as forecasting the water demand on a time period chosen by the end user, so that the pumping actions could be planned to an optimum schedule, that minimizes the total operational cost. The OPC protocol, associated to a MySQL database were used to develop a flexible tool of supervision and control, due to their adaptability to function with equipments from various manufacturers, being another integrated modular part of the E-Pumping project. Furthermore, in this thesis, through the study and performance tests of several statistical models based on time series, specifically applied to this problem, a forecasting tool adaptable to any station, and whose model parameters are automatically refreshed at runtime, was developed and added to the project as another module. Both the aforementioned modules were later integrated with an Graphical User Interface (GUI) and installed in a pilot application at the ADDP’s network. The implementation of this software on WSSs across the country will reduce the water supply companies’ running costs, improving their market competition and, ultimately, lowering the water price to the end costumer.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report (20 page booklet) on a water supply for the town of St. Catharines by Thomas Monro, civil engineer. This is addressed to Lucious S. Oille, M.D., chairman of the Water Committee of St. Catharines, June 10, 1875.