994 resultados para voltage level
Resumo:
Fuel cells are a promising alternative for clean and efficient energy production. A fuel cell is probably the most demanding of all distributed generation power sources. It resembles a solar cell in many ways, but sets strict limits to current ripple, common mode voltages and load variations. The typically low output voltage from the fuel cell stack needs to be boosted to a higher voltage level for grid interfacing. Due to the high electrical efficiency of the fuel cell, there is a need for high efficiency power converters, and in the case of low voltage, high current and galvanic isolation, the implementation of such converters is not a trivial task. This thesis presents galvanically isolated DC-DC converter topologies that have favorable characteristics for fuel cell usage and reviews the topologies from the viewpoint of electrical efficiency and cost efficiency. The focus is on evaluating the design issues when considering a single converter module having large current stresses. The dominating loss mechanism in low voltage, high current applications is conduction losses. In the case of MOSFETs, the conduction losses can be efficiently reduced by paralleling, but in the case of diodes, the effectiveness of paralleling depends strongly on the semiconductor material, diode parameters and output configuration. The transformer winding losses can be a major source of losses if the windings are not optimized according to the topology and the operating conditions. Transformer prototyping can be expensive and time consuming, and thus it is preferable to utilize various calculation methods during the design process in order to evaluate the performance of the transformer. This thesis reviews calculation methods for solid wire, litz wire and copper foil winding losses, and in order to evaluate the applicability of the methods, the calculations are compared against measurements and FEM simulations. By selecting a proper calculation method for each winding type, the winding losses can be predicted quite accurately before actually constructing the transformer. The transformer leakage inductance, the amount of which can also be calculated with reasonable accuracy, has a significant impact on the semiconductor switching losses. Therefore, the leakage inductance effects should also be taken into account when considering the overall efficiency of the converter. It is demonstrated in this thesis that although there are some distinctive differences in the loss distributions between the converter topologies, the differences in the overall efficiency can remain within a range of a few percentage points. However, the optimization effort required in order to achieve the high efficiencies is quite different in each topology. In the presence of practical constraints such as manufacturing complexity or cost, the question of topology selection can become crucial.
Resumo:
In this paper a three-phase power flow for electrical distribution systems considering different models of voltage regulators is presented. A voltage regulator (VR) is an equipment that maintains the voltage level in a predefined value in a distribution line in spite of the load variations within its nominal power. Three different types of connections are analyzed: 1) wye-connected regulators, 2) open delta-connected regulators and 3) closed delta-connected regulators. To calculate the power flow, the three-phase backward/forward sweep algorithm is used. The methodology is tested on the IEEE 34 bus distribution system. ©2008 IEEE.
Resumo:
The search for new energy models arises as a necessity to have a sustainable power supply. The inclusion of distributed generation sources (DG) allows to reduce the cost of facilities, increase the security of the grid or alleviate problems of congestion through the redistribution of power flows. In remote microgrids it is needed in a particular way a safe and reliable supply, which can cover the demand for a low cost; due to this, distributed generation is an alternative that is being widely introduced in these grids. But the remote microgrids are especially weak grids because of their small size, low voltage level, reduced network mesh and distribution lines with a high ratio R/X. This ratio affects the coupling between grid voltages and phase shifts, and stability becomes an issue of greater importance than in interconnected systems. To ensure the appropriate behavior of generation sources inserted in remote microgrids -and, in general, any electrical equipment-, it is essential to have devices for testing and certification. These devices must, not only faithfully reproduce disturbances occurring in remote microgrids, but also to behave against the equipment under test (EUT) as a real weak grid. This also makes the device commercially competitive. To meet these objectives and based on the aforementioned, it has been designed, built and tested a voltage disturbances generator, in order to provide a simple, versatile, full and easily scalable device to manufacturers and laboratories in the sector.
Resumo:
In the last 15 years, the use of doubly fed induction machines in modern variable-speed wind turbines has increased rapidly. This development has been driven by the cost reduction as well as the low-loss generation of Insulated Gate Bipolar Transistors (IGBT). According to new grid code requirements, wind turbines must remain connected to the grid during grid disturbances. Moreover, they must also contribute to voltage support during and after grid faults. The crowbar system is essential to avoid the disconnection of the doubly fed induction wind generators from the network during faults. The insertion of the crowbar in the rotor circuits for a short period of time enables a more efficient terminal voltage control. As a general rule, the activation and the deactivation of the crowbar system is based only on the DC-link voltage level of the back-to-back converters. In this context, the authors discuss the critical rotor speed to analyze the instability of doubly fed induction generators during grid faults.
Resumo:
This work presents the development and implementation of an artificial neural network based algorithm for transmission lines distance protection. This algorithm was developed to be used in any transmission line regardless of its configuration or voltage level. The described ANN-based algorithm does not need any topology adaptation or ANN parameters adjustment when applied to different electrical systems. This feature makes this solution unique since all ANN-based solutions presented until now were developed for particular transmission lines, which means that those solutions cannot be implemented in commercial relays. (c) 2011 Elsevier Ltd. All rights reserved.
Resumo:
Detailed information on probing behavior of the Asian citrus psyllid, Diaphorina citri Kuwayama (Hemiptera: Psyllidae), is critical for understanding the transmission process of phloem-limited bacteria (Candidatus Liberibacter spp.) associated with citrus `huanglongbing` by this vector. In this study, we investigated stylet penetration activities of D. citri on seedlings of Citrus sinensis (L.) Osbeck cv. Pera (Rutaceae) by using the electrical penetration graph (EPG-DC system) technique. EPG waveforms were described based on amplitude, frequency, voltage level, and electrical origin of the observed traces during stylet penetration into plant tissues. The main waveforms were correlated with histological observations of salivary sheath termini in plant tissues, to determine the putative location of stylet tips. The behavioral activities were also inferred based on waveform similarities in relation to other Sternorrhyncha, particularly aphids and whiteflies. In addition, we correlated the occurrence of specific waveforms with the acquisition of the phloem-limited bacterium Ca. Liberibacter asiaticus by D. citri. The occurrence of a G-like xylem sap ingestion waveform in starved and unstarved psyllids was also compared. By analyzing 8-h EPGs of adult females, five waveforms were described: (C) salivary sheath secretion and other stylet pathway activities; (D) first contact with phloem (distinct from other waveforms reported for Sternorrhyncha); (E1) putative salivation in phloem sieve tubes; (E2) phloem sap ingestion; and (G) probably xylem sap ingestion. Diaphorina citri initiates a probe with stylet pathway through epidermis and parenchyma (C). Interestingly, no potential drops were observed during the stylet pathway phase, as are usually recorded in aphids and other Sternorrhyncha. Once in C, D. citri shows a higher propensity to return to non-probing than to start a phloem or xylem phase. Several probes are usually observed before the phloem phase; waveform D is observed upon phloem contact, always immediately followed by E1. After E1, D. citri either returns to pathway activity (C) or starts phloem sap ingestion, which was the longest activity observed.
Resumo:
The sharpshooter Bucephalogonia xanthophis (Berg) (Homoptera: Cicadellidae) is a vector of the xylem-limited bacterium, Xylella fastidiosa (Wells, Raju, Hung, Weisburg, Mandelco-Paul, and Brenner), which causes citrus variegated chlorosis. Despite the importance of citrus variegated chlorosis, the probing behavior of vectors on citrus and its implications for transmission of X. fastidiosa have not been studied. Here we studied electrical penetration graph (EPG-DC system) waveforms produced by B. xanthophis on Citrus sinensis (L.) Osbeck (Rutaceae), and their relationships with stylet activities and xylem ingestion. Electrical penetration graph waveforms were described based on amplitude, frequency, voltage level, and electrical origin of the observed traces during stylet penetration on plant tissues. The main waveforms were correlated with histological observations of salivary sheaths in plant tissues and excretion analysis, in order to determine stylet activities and their precise position. Six waveforms and associated activities are described: (S) secretion of salivary sheath and intracellular stylet pathway, (R) resting during stylet pathway, (Xc) contact of stylets with xylem vessels, (Xi) active xylem ingestion, (N) interruption within the xylem phase (during Xc or Xi), and (W) withdrawal of stylet from the plant. The sharpshooter spent 91.8% of its probing time with its stylet in the xylem, where the main activity was ingestion (Xi: 97.5%). During a probe, the most likely sequence of events is secretion of salivary sheath and pathway (S) through epidermal and parenchyma cells (all individuals), followed by contact with xylem (Xc) (67.6% of all individuals) and ingestion (Xi) (88.3% of those that exhibit waveform Xc). The mean time to contact the xylem (Xc) and initiate ingestion (Xi) after onset of the first probe was 27.8 and 34.2 min, respectively. However, sustained xylem ingestion (Xi > 5 min) was established after 39.8 min, on average. This information is basic for future studies on the transmission mechanisms of X. fastidiosa and in order to establish control strategies aimed at interfering with this process.
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Energia
Resumo:
Tipicamente as redes elétricas de distribuição apresentam uma topologia parcialmente malhada e são exploradas radialmente. A topologia radial é obtida através da abertura das malhas nos locais que otimizam o ponto de operação da rede, através da instalação de aparelhos de corte que operam normalmente abertos. Para além de manterem a topologia radial, estes equipamentos possibilitam também a transferência de cargas entre saídas, aquando da ocorrência de defeitos. As saídas radiais são ainda dotadas de aparelhos de corte que operam normalmente fechados, estes têm como objetivo maximizar a fiabilidade e isolar defeitos, minimizando a área afetada pelos mesmos. Assim, na presente dissertação são desenvolvidos dois algoritmos determinísticos para a localização ótima de aparelhos de corte normalmente abertos e fechados, minimizando a potência ativa de perdas e o custo da energia não distribuída. O algoritmo de localização de aparelhos de corte normalmente abertos visa encontrar a topologia radial ótima que minimiza a potência ativa de perdas. O método é desenvolvido em ambiente Matlab – Tomlab, e é formulado como um problema de programação quadrática inteira mista. A topologia radial ótima é garantida através do cálculo de um trânsito de potências ótimo baseado no modelo DC. A função objetivo é dada pelas perdas por efeito de Joule. Por outro lado o problema é restringido pela primeira lei de Kirchhoff, limites de geração das subestações, limites térmicos dos condutores, trânsito de potência unidirecional e pela condição de radialidade. Os aparelhos de corte normalmente fechados são localizados ao longo das saídas radiais obtidas pelo anterior algoritmo, e permite minimizar o custo da energia não distribuída. No limite é possível localizar um aparelho de corte normalmente fechado em todas as linhas de uma rede de distribuição, sendo esta a solução que minimiza a energia não distribuída. No entanto, tendo em conta que a cada aparelho de corte está associado um investimento, é fundamental encontrar um equilíbrio entre a melhoria de fiabilidade e o investimento. Desta forma, o algoritmo desenvolvido avalia os benefícios obtidos com a instalação de aparelhos de corte normalmente fechados, e retorna o número e a localização dos mesmo que minimiza o custo da energia não distribuída. Os métodos apresentados são testados em duas redes de distribuição reais, exploradas com um nível de tensão de 15 kV e 30 kV, respetivamente. A primeira rede é localizada no distrito do Porto e é caraterizada por uma topologia mista e urbana. A segunda rede é localizada no distrito de Bragança e é caracterizada por uma topologia maioritariamente aérea e rural.
Resumo:
The application of the three voltage level 20/1/0.4 distribution system in Finland has proved to be an economic solution to enhance the reability of electricity distribution. By using 1 kV voltage level between medium and low voltage networks, the improvement in reability could be reached especially inaerial lines networks. Also considerable savings in investment and outage costscould be archieved compared to the traditional distribution system. This master's thesis is focused on the describing the situation in Russian distribution netwoks and consequent analyses the possibility of applying 1000V distribution system in Russia. The goal is to investigate on the basis of Finnish experience is any possible installation targets in Russia for the new system. Compatibility with Russian safety and quality standards are also studied in this thesis.
Resumo:
Tässä diplomityössä tutkittiin sähkön laatua Suur-Savon Sähkön verkossa. Samalla perehdyttiin sähkönjakeluverkkojen aiheuttamiin ympäristövaikutuksiin ja näiden vähentämiseen. Työn aihealue on aika laaja kokonaisuus, eikä mihinkään perehdytä kovin yksityiskohtaisella tasolla, vaan käsitellään asiaa mahdollisimman laajasti monelta eri näkökantilta käytännönläheisesti. Mietittäessä keinoja parantaa sähkönlaatua alettiin yhtiössä pohtimaan keinoja vähentää 20 kV avojohtoverkon määrääja osana tätä keskustelua kehitettiin 1000 voltin jakelu-järjestelmä, jonka ensimmäiset koekohteet otettiin käyttöön vuonna 2001. Järjestelmä on osoittautunut käyttökelpoiseksi ja toimivaksi varsinkin vapaa-ajan asuntojen sähköistämisessä. Osana tulevaisuuden verkostostrategiaa joudutaan Suur-Savon Sähkössäkin pohtimaan maasulkuvirtojen kompensointia ja myös tätä aihealuetta onkäsitelty työn yhteydessä. Sähkön laatu on erittäin riippuvainen luonnon aiheuttamista vioista ja näiltä suojautuminen vaatii nykyisen avojohtoverkon korvaamista jollain muulla johtoratkaisulla, joka nostaa maasulkuvirran arvoa ja johtaa jossain vaiheessa kompensoinnin käyttöön.
Resumo:
Sähkönjakeluverkkojen kehittäminen nykyistä käyttövarmemmiksi ja taloudellisemmiksi vaatii jatkuvasti uusia ratkaisumalleja. Lupaavaksi tekniikaksi sähkönjakeluverkkojen kehittämisessä on osoittautumassa tasasähkönjakelu tehoelektronisten komponenttien kehittyessä ja hintojen laskiessa samanaikaisesti. Pienjännitedirektiivi mahdollistaa tasajännitteen myötä aiempaa suurempien jännitteiden käytön pienjänniteverkoissa. Tasajännitteen käytöllä voidaan saavuttaa etuja mm. tehonsiirtokyvyssä, sähkönlaadussa, käyttövarmuudessa sekä kustannuksissa. Työssä tehdään yksityiskohtaisia teknistaloudellisia tarkasteluja perinteistä 20/0,4 kV tekniikkaa, 1000 V sähkönjakelua sekä tasasähköjärjestelmiä hyödyntäen ja verrataan näiden järjestelmien kustannuksia ja ominaisuuksia toisiinsa. Tutkimusalueet on valittu Fortum Sähkönsiirto Oy:n maaseutu- ja taajamaverkoista. Työssä pyritään hahmotta-maan teknistaloudellista käyttöaluetta eri tasasähkönjakelujärjestelmille sekä määrittä-mään tasasähkönjakelun käyttöpotentiaali tutkimuskohteena olleissa verkoissa. Lisäksi tutkitaan eri tekijöiden vaikutuksia tasasähköjakelun kannattavuuteen ja käyttövarmuu-teen sekä pyritään tuomaan esiin muitakin tasasähkönjakelujärjestelmien ominaisuuksia.
Resumo:
Tässä työssä tutkitaan 1000 V pienjännitejakelun taloudellista kannattavuutta. Tutkimus perustuu teoreettiseen tarkasteluun, jossa noudatetaan yleisiä verkostosuunnittelun periaatteita. EU-lainsäädäntö mahdollistaa 1000 V pienjänniteportaan sijoittamisen nykyisen keskijänniteverkon ja pienjänniteverkon väliin lisäten kolmannen jakelujänniteportaan nykyään käytettävien 20 kV ja 0,4 kV väliin. Jakeluverkkojen kehittämiseksi on etsittävä ratkaisu, joka on taloudellinen sekä asiakkaiden että verkonhaltijoiden kannalta. Tällaiset ratkaisut pienentävät verkon käytön kokonaiskustannuksia ja parantavat sähkön laatua. Lisättäessä jakeluverkkoon kolmas jänniteporras, keskijänniteverkon johtopituus lyhenee ja varsinkin lyhyiden haarajohtojen määrä vähenee. Tämä vähentää keskijänniteverkossa esiintyvien keskeytysten määrää ja pienentää keskeytyskustannuksia. Kilovoltin järjestelmä on kannattava korvattaessa sillä osa keskijänniteverkkoa, tai estettäessä perinteisellä järjestelmällä tarvittava muuntopiirin jakaminen. Osana varsinaista pienjänniteverkkoa ei kilovoltinjärjestelmä ole kannattava. Tässä työssä kolmijänniteportaista jakeluverkkoa tutkitaan teoreettisilla verkkosuunnitelmilla, joita tehdään muutamille perusverkkotopologioille. Taloudellista kannattavuutta tutkitaan vertaamalla perinteistä kaksijänniteportaista ja kolmijänniteportaista verkkoratkaisua kustannusten suhteen teknisten reunaehtojen puitteissa. 1000 V pienjännitejakelu vaatii uudenlaisia verkostokomponentteja. Näistä on erityisesti käsitelty 1/0,4 kV pienjännitemuuntajaa. Muuntajasuunnittelun lähtökohtana on 1000 V verkon käyttäminen keskijänniteverkon jatkeena maasta erotettuna verkkona.
Resumo:
Kymenlaakson Sähköverkko Oy:n 20/0,4 kV tekniikalla toteutettu sähkönjakeluverkko on monin paikoin saavuttamassa pitoaikansa loppua. Sähkönjakeluverkko sijaitsee pääasiassa haja-asutusalueilla ja on pääosin avojohtotekniikalla rakennettua. Haja-asutusalueilla 20 kV sähköverkko sisältää paljon lyhyitä 1–5 km pituisia johtohaaroja. Tässä diplomityössä selvitettiin 20/1/0,4 kV sähkönjakelujärjestelmän käyttömahdollisuuksia Kymenlaakson Sähköverkko Oy:n sähkönjakeluverkossa. Työssä vertailtiin erilaisilla verkostoratkaisuilla saatavia elinkaarikustannuksia perusparannus- ja uudisrakennuskohteissa. Tutkimuksen perusteella Kymenlaakson Sähköverkko Oy:n sähkönjakeluverkossa on potentiaalia 1000 V jakelujännitteen käytölle. Työssä perehdyttiin myös 1000 V verkostokomponenttien merkitsemiseen ja verkkoyhtiön tekemiin 1000 V verkon tarkastuksiin.
Resumo:
Polttokennojen, erityisesti SOFC-kennojen, tutkimuksessa on viime vuosina saavutettu merkittäviä edistysaskelia ja mahdollisuudet kennojen laajamittaiseen hyödyntämiseen paranevat koko ajan. Polttokennojen yleistyessä tarvitaan tehoelektroniikkaa muokkaamaan kennojen tasajännite verkkoon sopivaksi vaihtojännitteeksi. Verkkovaihtosuuntaaja vaatii korkeamman jännitetason, kuin polttokennosta on saatavissa, joten tasajännitetasoa on ensin nostettava. Tässä diplomityössä esitellään kolme eri hakkuritopologiaa ja perehdytään kokosiltahakkurin optimointiin. Hakkurin pääasialliset häviölähteet olivat toision diodisilta ja transistorit. Diodien vaihtaminen piidiodeista piikarbididiodeihin ei parantanut hyötysuhdetta, koska toision jännite tarkastellussa sovelluksessa oli matala. Muuntajan käämiminen litz-johtimella paransi hyötysuhdetta merkittävästi.