As part of a Doctor of Business Administration degree programme jointly run by Curtin University, Perth, Australia and Lingnan University, Hong Kong, a research thesis relating organizational effectiveness to the organizational culture of Hong Kong construction firms involved in public housing is being undertaken. Organizational effectiveness is measured by the Housing Department (HD) Performance Assessment Scoring System (PASS) and organizational culture traits and strengths have been measured by using the Denison Organizational Culture Survey (OCS), developed by Daniel Denison and William S. Neale and based on 16 years of research involving over 1,000 organizations. The PASS scores of building contractors are compared with the OCS scores to determine if there is any significant correlation between highly effective companies and particular organizational strengths and traits. Profiles are then drawn using the Denison Model and can be compared against ‘norms’ for the industry sector on which the survey has been carried out. The next stage of the work is to present the results of the survey to individual companies, conduct focus group interviews to test the results, discover more detail on that company’s culture and discuss possible actions based on the results. It is in this latter stage that certain value management techniques may well prove very useful.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Value Management (VM) initially started in early 1940s in the US manufacturing industry has increasingly becoming popular within the construction industry community internationally. It has been widely accepted as an important tool in the management of projects. The structured, systematic and multi-disciplinary approach in decision making process is a niche for VM in delivering better value for money project to the client investment. It would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector especially in the quantity surveying practice. Quantity surveyors increasing involvement in VM provides an opportunity for the profession to re-model some of its traditional services in a more positive light and develop leading-edge skills and promote the profession. International practice has associated VM to be part of services offered in the quantity surveying practice; especially in UK has proven to be a natural progression of QS profession. The introduction of VM as early 1980’s in Malaysia combined with increasing demand for construction project to facilitate nation progress is shedding a positive light for quantity surveying profession to take lead in developing VM as one of their niche area. Therefore, the quantity surveying profession having the opportunity to take lead of this service which reflect their traditional attributes for providing the best value-for-money advise to the client. This paper shall discuss on the development of VM in Malaysia and the challenges VM face services in QS firm to remain ahead of their competitors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarise a successfully defended doctoral thesis. The main purpose of this paper is to provide a summary of the scope, and main issues raised in the thesis so that readers undertaking studies in the same or connected areas may be aware of current contributions to the topic. The secondary aims are to frame the completed thesis in the context of doctoral-level research in project management as well as offer ideas for further investigation which would serve to extend scientific knowledge on the topic. Design/methodology/approach – Research reported in this paper is based on a quantitative study using inferential statistics aimed at better understanding the actual and potential usage of earned value management (EVM) as applied to external projects under contract. Theories uncovered during the literature review were hypothesized and tested using experiential data collected from 145 EVM practitioners with direct experience on one or more external projects under contract that applied the methodology. Findings – The results of this research suggest that EVM is an effective project management methodology. The principles of EVM were shown to be significant positive predictors of project success on contracted efforts and to be a relatively greater positive predictor of project success when using fixed-price versus cost-plus (CP) type contracts. Moreover, EVM's work-breakdown structure (WBS) utility was shown to positively contribute to the formation of project contracts. The contribution was not significantly different between fixed-price and CP contracted projects, with exceptions in the areas of schedule planning and payment planning. EVM's “S” curve benefited the administration of project contracts. The contribution of the S-curve was not significantly different between fixed-price and CP contracted projects. Furthermore, EVM metrics were shown to also be important contributors to the administration of project contracts. The relative contribution of EVM metrics to projects under fixed-price versus CP contracts was not significantly different, with one exception in the area of evaluating and processing payment requests. Practical implications – These results have important implications for project practitioners, EVM advocates, as well as corporate and governmental policy makers. EVM should be considered for all projects – not only for its positive contribution to project contract development and administration, for its contribution to project success as well, regardless of contract type. Contract type should not be the sole determining factor in the decision whether or not to use EVM. More particularly, the more fixed the contracted project cost, the more the principles of EVM explain the success of the project. The use of EVM mechanics should also be used in all projects regardless of contract type. Payment planning using a WBS should be emphasized in fixed-price contracts using EVM in order to help mitigate performance risk. Schedule planning using a WBS should be emphasized in CP contracts using EVM in order to help mitigate financial risk. Similarly, EVM metrics should be emphasized in fixed-price contracts in evaluating and processing payment requests. Originality/value – This paper provides a summary of cutting-edge research work and a link to the published thesis that researchers can use to help them understand how the research methodology was applied as well as how it can be extended.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis investigates the Value Management processes used by construction project clients that effects project team involvement in VM workshops during the design stage of the projects. It is based on five case studies of the Malaysian international airport construction project packages. The focus of the research is on how issues related to infrastructure design that can improve construction processes on-site are being identified, analysed and resolved through multi-disciplinary team participation. The degrees of interaction, diversity of visualisation aids, certain cultural dimensions and the system thinking approach are found to have significant influence in maximizing participation among project team members during the entire VM workshop process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There has been considerable discussion in the literature about the relative merits of shareholder value management and stakeholder value management, but relatively little empirical research has been reported concerning the relationship between these types of management and financial performance. The present study puts forward a hypothesis that true shareholder value management also encompasses stakeholder value management. This combination of shareholder/stakeholder value management is hypothesised to be associated with superior financial performance and sales growth. Using a sample of chief financial officers' ratings of the contemporary management accounting techniques economic value added and the balanced scorecard to represent the two management types, the study found evidence in support of the hypothesis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With the intention of introducing unique and value-added products to the market, organizations have become more conscious of how to best create knowledge as reported by Ganesh Bhatt in 2000 in 'Information dynamics, learning and knowledge creation in organizations'. Knowledge creation is recognized as having an important role in generating and sustaining a competitive advantage as well as in meeting organizational goals, as reported by Aleda Roth and her colleagues in 1994 in 'The knowledge factory for accelerated learning practices.' One of the successful ingredients of value management (VM) is its utilization of diverse knowledge resources, drawing upon different organizational functions, professional disciplines, and stakeholders, in a facilitated team process. Multidisciplinary VM study teams are viewed as having high potential to innovate due to their heterogeneous nature. This paper looks at one of the VM workshop's major benefits, namely, knowledge creation. A case study approach was used to explore the nature, processes, and issues associated with fostering a dynamic knowledge creation capability within VM teams. The results indicate that the dynamic knowledge creating process is embedded in and influenced by managing team constellation, creating shared awareness, developing shared understanding, and producing aligned action. The catalysts that can speed up the processes are open dialogue and discussion among participants. This process is enhanced by the use of facilitators, skilled at extracting knowledge.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The constructivist model of 'soft' value management (VM) is contrasted with the VM discourse appropriated by cost consultants who operate from within UK quantity surveying (QS) practices. The enactment of VM by cost consultants is shaped by the institutional context within which they operate and is not necessarily representative of VM practice per se. Opportunities to perform VM during the formative stages of design are further constrained by the positivistic rhetoric that such practitioners use to conceptualize and promote their services. The complex interplay between VM theory and practice is highlighted and analysed from a non-deterministic perspective. Codified models of 'best practice' are seen to be socially constructed and legitimized through human interaction in the context of interorganizational networks. Published methodologies are seen to inform practice in only a loose and indirect manner, with extensive scope for localized improvization. New insights into the relationship between VM theory and practice are derived from the dramaturgical metaphor. The social reality of VM is seen to be constituted through scripts and performances, both of which are continuously contested across organizational arenas. It is concluded that VM defies universal definition and is conceptualized and enacted differently across different localized contexts.