1000 resultados para urban highway.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The city of Madrid keeps not meeting the GHG and air pollutant limits set by the European legislation. A broad range of strategies have being taken into account to reduce both types of emissions; however traffic management meas ures are usually consigned to the sidelines. In 2004, Madrid City Council launched a plan to re-design its inner ring-road supported by a socioeconomic study that evaluated the environmental and operational benefits of the project. For safety reasons the planned speed limit for the tunnel section was finally reduced from 90km/h to 70km/h. Using a Macroscopic Traffic Model and the European Air Pollutant and Emissions Inventory Guidebook (EMEP/EEA), this paper examines the environmental and traffic performance consequences of this decision. Results support the thesis that reduced speed limits leads to GHG and air pollution reductions in the area affected by the measure without substantially altering traffic performance. The implementation of the new speed limit policy brings about a 15% and 16% reduction in both CO2 and NOx emissions respectively. Emissions’ reduction during off-peak hours is larger than during peak hours.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Texas Department of Transportation, Austin

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Ce mémoire de maîtrise s’intéresse aux exercices participatifs liés à la planification et à la gouvernance des infrastructures routières en milieu urbain. Une étude de cas a été effectuée concernant la modernisation de la rue Notre-Dame. Celle-ci alimente des controverses socio-politiques depuis plus de 30 ans et une décision publique est attendue. Pour arriver à un compromis satisfaisant, les élus ont convié les acteurs socio-économiques à participer à un débat public. L’analyse de cas a permis de rendre compte de la variété des acteurs en présence et de la diversité des demandes formulées à l’occasion du débat public. Si les demandes formulées peuvent parfois être compatibles, l’étude de cas montre que ces demandes peuvent aussi s’éloigner les unes des autres, cela s’expliquant avant tout par la spécificité et la position des acteurs en présence. Les élus municipaux et provinciaux sont alors placés dans une position complexe, puisqu’ils doivent rendre une décision publique. L’analyse a permis de rendre compte des bénéfices, mais aussi des limites du débat public organisé par rapport à l’enjeu de la modernisation de la rue Notre-Dame. L’étude de cas révèle finalement que certaines limites ont trait à la participation des acteurs aux processus de consultation publique. En fait, trois discours majeur s’affrontent. Chacun d’eux appréhende à partir de valeurs distinctes la question de la régulation sociale et l’élaboration des politiques publiques.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This edition of the FAL Bulletin tells of recent events and trends in urban transport, railways and highway maintenance in Latin America and the Caribbean.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on `what is strategic` is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval. (c) 2008 Elsevier Inc. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Urban rainfall-runoff residuals contain metals such as Cr, Zn, Cu, As, Pb and Cd and are thus reasonable candidates for treatment using Portland cement-based solidification-stabilization (S/S). This research is a study of S/S of urban storm water runoff solid residuals in Portland cement with quicklime and sodium bentonite additives. The solidified residuals were analyzed after 28 days of hydration time using X-ray powder diffraction (XRD) and solid-state Si-29 nuclear magnetic resonance (NMR) spectroscopy. X-ray diffraction (XRD) results indicate that the main cement hydration products are ettringite, calcium hydroxide and hydrated calcium silicates. Zinc hydroxide and lead and zinc silicates are also present due to the reactions of the waste compounds with the cement and its hydration products. Si-29 NMR analysis shows that the coarse fraction of the waste apparently does not interfere with cement hydration, but the fine fraction retards silica polymerization.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

When referenced, the 2012 edition of the Iowa Department of Transportation’s (Iowa DOT) Standard Specifications for Highway and Bridge Construction shall be used for contract work awarded by the Iowa DOT. They may also be incorporated by reference in other contract work on secondary, urban, local systems, or other contract work in which the Iowa DOT has an interest. As modified by the General Supplemental Specifications, these Standard Specifications represent the minimum requirements and may be modified by Supplemental Specifications, Developmental Specifications, and Special Provisions on specific contracts. These Standard Specifications have been written so the Contractor’s responsibilities are indicated by plain language using the Imperative Mood and Active Voice form. Sentences are of the form: Construct isolation joints at all points where driveways meet other walks, curbs, or fixtures in the surface. Ensure finished members are true to detailed dimensions and free from twists, bends, open joints, or other defects resulting from faulty fabrication or defective work. Personnel preparing the JMF shall be Iowa DOT certified in bituminous mix design. The Contracting Authority’s responsibilities are (with some exceptions) indicated by the use of the modal verb “will”. Sentences are of the form: The Engineer will obtain and test density samples for each lot according to Materials I.M. 204. Payment will be the contract unit price for Fabric Reinforcement per square yard (square meter). These standard specifications contain dual units of measure: the United States Standard measure (English units) and the International System of Units (SI or “metric” units). The English units are expressed first then followed by the metric units in parentheses. The measurements expressed in the two systems are not necessarily equal. In some cases the measurements in metric units is a “hard” conversion of the English measurement; i.e. the metric unit has been approximated with a rounded, rationalized metric measurement that is easy to work with and remember. The proposal form will identify whether the work was designed and shall be constructed in English or metric units.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Urban places attract most highway travel because more people are to be per acre in urban places than elsewhere. In the beginning of highway development the objective was to provide an all-weather road for the rural people to get to town and back to their farms, but there was no consideration of getting motor vehicles through the town to the opposite side. With the development of intercity travel, it soon became apparent that travel through the urban areas would have to be given consideration along with the travel to and from the urban areas. This consideration led to the urban bypass, a provision in highway location whereby the traveler may get to the opposite side of the urban area without going through it, or at least not through the central business district. Bypasses, although highly desired by the through travelers, were not welcomed by local business interests on the basis that the community would suffer a reduction in retail trade. Some discussion of the pros and cons of bypasses and their consequences as observed from experience will shed light upon this type of local highway. The bypass report summaries in this document were based on interviews with businessmen and community leaders of cities that have actually experienced firsthand the impacts of a highway bypass. Several of the studies were conducted by newspaper reporters, city council members and residents of Iowa cities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The goal of this project was to provide an objective methodology to support public agencies and railroads in making decisions related to consolidation of at-grade rail-highway crossings. The project team developed a weighted-index method and accompanying Microsoft Excel spreadsheet based tool to help evaluate and prioritize all public highway-rail grade crossings systematically from a possible consolidation impact perspective. Factors identified by stakeholders as critical were traffic volume, heavy-truck traffic volume, proximity to emergency medical services, proximity to schools, road system, and out-of-distance travel. Given the inherent differences between urban and rural locations, factors were considered, and weighted, differently, based on crossing location. Application of a weighted-index method allowed for all factors of interest to be included and for these factors to be ranked independently, as well as weighted according to stakeholder priorities, to create a single index. If priorities change, this approach also allows for factors and weights to be adjusted. The prioritization generated by this approach may be used to convey the need and opportunity for crossing consolidation to decision makers and stakeholders. It may also be used to quickly investigate the feasibility of a possible consolidation. Independently computed crossing risk and relative impact of consolidation may be integrated and compared to develop the most appropriate treatment strategies or alternatives for a highway-rail grade crossing. A crossing with limited- or low-consolidation impact but a high safety risk may be a prime candidate for consolidation. Similarly, a crossing with potentially high-consolidation impact as well as high risk may be an excellent candidate for crossing improvements or grade separation. The results of the highway-rail grade crossing prioritization represent a consistent and quantitative, yet preliminary, assessment. The results may serve as the foundation for more rigorous or detailed analysis and feasibility studies. Other pertinent site-specific factors, such as safety, maintenance costs, economic impacts, and location-specific access and characteristics should be considered.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although extensive research has been conducted on urban freeway capacity estimation methods, minimal research has been carried out for rural highway sections, especially sections within work zones. This study attempted to fill that void for rural highways in Kansas, by estimating capacity of rural highway work zones in Kansas. Six work zone locations were selected for data collection and further analysis. An average of six days’ worth of field data was collected, from mid-October 2013 to late November 2013, at each of these work zone sites. Two capacity estimation methods were utilized, including the Maximum Observed 15-minute Flow Rate Method and the Platooning Method divided into 15-minute intervals. The Maximum Observed 15-minute Flow Rate Method provided an average capacity of 1469 passenger cars per hour per lane (pcphpl) with a standard deviation of 141 pcphpl, while the Platooning Method provided a maximum average capacity of 1195 pcphpl and a standard deviation of 28 pcphpl. Based on observed data and analysis carried out in this study, the suggested maximum capacity can be considered as 1500 pcphpl when designing work zones for rural highways in Kansas. This proposed standard value of rural highway work zone capacity could be utilized by engineers and planners so that they can effectively mitigate congestion at or near work zones that would have otherwise occurred due to construction/maintenance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project was intended to produce a strategy for addressing current and future access management problems on state highway routes located just outside urban areas that serve as major routes for commuting into and out of major employment centers in Iowa. There were two basic goals: (1) to develop a ranking system for identifying high-priority segments for access management treatments on primary highways outside metro and urban areas and (2) to focus efforts on routes that are major commuting routes at present and in the future. The project focused on four-lane expressways and two-lane arterials most likely to serve extensive commuter traffic. Available spatial and statistical data were used to identify existing and possible future problem corridors with respect to access management. The research team developed a scheme for ranking commuter routes based on their need for attention to access management. This project was able to produce rankings for corridors based on a variety of factors, including proportion of crashes that appear to be access-related, severity of those crashes, and potential for improvement along corridors. Frequency and loss were found to be highly rank correlated; because of this, these indicators were not used together in developing final priority rankings. Most of the highest ranked routes are on two-lane rural cross sections, but a few are four-lane expressways with at-grade private driveways and public road intersections. The most important conclusion of the ranking system is that many of the poor-performing corridors are located in a single Iowa Department of Transportation district near two urban areas--Des Moines and Ames. A comprehensive approach to managing access along commuting corridors should be developed first in this district since the potential benefits would be highest in that region.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This final report summarizes the activities of the archaeological surveys contract for primary roads, secondary roads, and urban systems. The contract is negotiated annually between the Iowa Department of Transportation and the University of Iowa. The information contained is composed of summaries abstracted from completed cultural resource reports on file with the Department of Transportation, the Office of Historic Preservation, and the Office of the State Archaeologist.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This final report summarizes the activities of the archaeological surveys contract for primary roads, secondary roads, and urban systems. The contract is negotiated annually between the Iowa Department of Transportation and the University of Iowa. The information contained in this section of the report is composed of summaries abstracted from completed cultural resource reports on file with the Department of Transportation, the Office of Historic Preservation, and the Office of the State Archaeologist.