894 resultados para time delay in teleoperation
Resumo:
Presents a method for model based bilateral control of master-slave arm with time delay between master and slave arms, where the system supports cooperative action between manual and automatic modes. The method realises efficiencies in master-slave arm control with the simplicities of a computer and the flexibility of a skilled human operator.
Resumo:
In this paper, we present an on-line estimation algorithm for an uncertain time delay in a continuous system based on the observational input-output data, subject to observational noise. The first order Pade approximation is used to approximate the time delay. At each time step, the algorithm combines the well known Kalman filter algorithm and the recursive instrumental variable least squares (RIVLS) algorithm in cascade form. The instrumental variable least squares algorithm is used in order to achieve the consistency of the delay parameter estimate, since an error-in-the-variable model is involved. An illustrative example is utilized to demonstrate the efficacy of the proposed approach.
Resumo:
This paper studies the effect of time delay on the active non-linear control of dynamically loaded flexible structures. The behavior of non-linear systems under state feedback control, considering a fixed time delay for the control force, is investigated. A control method based on non-linear optimal control, using a tensorial formulation and state feedback control is used. The state equations and the control forces are expressed in polynomial form and a performance index, quadratic in both state vector and control forces, is used. General polynomial representations of the non-linear control law are obtained and implemented for control algorithms up to the fifth order. This methodology is applied to systems with quadratic and cubic non-linearities. Strongly non-linear systems are tested and the effectiveness of the control system including a delay for the application of control forces is discussed. Numerical results indicate that the adopted control algorithm can be efficient for non-linear systems, chiefly in the presence of strong non-linearities but increasing time delay reduces the efficiency of the control system. Numerical results emphasize the importance of considering time delay in the project of active structural control systems.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
We have developed the analytic expressions for the phase response and time delay of FBGSL of arbitrary grating structure and found that the results from the modelling are in excellent agreement with that of the experimentally measured real devices. The theoretical and experimental investigation clearly reveals that FBGSLs utilizing uniform and linearly chirped gratings exhibit a near-constant time delay in the passbands. Such multi-channel bandpass filters should be highly attractive to WDM applications as they are operating in transmission regime and offering near-zero dispersion.
Resumo:
The present research is carried out from the viewpoint of primarily space applications where human lives may be in danger if they are to work under these conditions. This work proposes to develop a one-degree-of-freedom (1-DOF) force-reflecting manual controller (FRMC) prototype for teleoperation, and address the effects of time delays commonly found in space applications where the control is accomplished via the earth-based control stations. To test the FRMC, a mobile robot (PPRK) and a slider-bar were developed and integrated to the 1-DOF FRMC. The software developed in Visual Basic is able to telecontrol any platform that uses an SV203 controller through the internet and it allows the remote system to send feedback information which may be in the form of visual or force signals. Time delay experiments were conducted on the platform and the effects of time delay on the FRMC system operation have been studied and delineated.
Resumo:
In this paper, we propose a novel control scheme for bilateral teleoperation of n degree-of-freedom (DOF) nonlinear robotic systems with time-varying communication delay. We consider that the human operator contains a constant force on the local manipulator. The local and remote manipulators are coupled using state convergence control scheme. By choosing a Lyapunov-Krasovskii functional, we show that the local-remote teleoperation system is asymptotically stable. It is also shown that, in the case of reliable communication protocols, the proposed scheme guarantees that the remote manipulator tracks the delayed trajectory of the local manipulator. The time delay of communication channel is assumed to be unknown and randomly time varying, but the upper bounds of the delay interval and the derivative of the delay are assumed to be known.
Resumo:
We propose a novel control scheme for bilateral teleoperation of n degree-of-freedom (DOF) nonlinear robotic systems with time-varying communication delay. A major contribution from this work lies in the demonstration that the structure of a state convergence algorithm can be also applied to nth-order nonlinear teleoperation systems. By choosing a Lyapunov Krasovskii functional, we show that the local-remote teleoperation system is asymptotically stable. The time delay of communication channel is assumed to be unknown and randomly time varying, but the upper bounds of the delay interval and the derivative of the delay are assumed to be known.
Resumo:
One of the major challenges in the development of an immersive system is handling the delay between the tracking of the user’s head position and the updated projection of a 3D image or auralised sound, also called end-to-end delay. Excessive end-to-end delay can result in the general decrement of the “feeling of presence”, the occurrence of motion sickness and poor performance in perception-action tasks. These latencies must be known in order to provide insights on the technological (hardware/software optimization) or psychophysical (recalibration sessions) strategies to deal with them. Our goal was to develop a new measurement method of end-to-end delay that is both precise and easily replicated. We used a Head and Torso simulator (HATS) as an auditory signal sensor, a fast response photo-sensor to detect a visual stimulus response from a Motion Capture System, and a voltage input trigger as real-time event. The HATS was mounted in a turntable which allowed us to precisely change the 3D sound relative to the head position. When the virtual sound source was at 90º azimuth, the correspondent HRTF would set all the intensity values to zero, at the same time a trigger would register the real-time event of turning the HATS 90º azimuth. Furthermore, with the HATS turned 90º to the left, the motion capture marker visualization would fell exactly in the photo-sensor receptor. This method allowed us to precisely measure the delay from tracking to displaying. Moreover, our results show that the method of tracking, its tracking frequency, and the rendering of the sound reflections are the main predictors of end-to-end delay.
Resumo:
BACKGROUND & AIMS: Development of strictures is a major concern for patients with eosinophilic esophagitis (EoE). At diagnosis, EoE can present with an inflammatory phenotype (characterized by whitish exudates, furrows, and edema), a stricturing phenotype (characterized by rings and stenosis), or a combination of these. Little is known about progression of stricture formation; we evaluated stricture development over time in the absence of treatment and investigated risk factors for stricture formation. METHODS: We performed a retrospective study using the Swiss EoE Database, collecting data on 200 patients with symptomatic EoE (153 men; mean age at diagnosis, 39 ± 15 years old). Stricture severity was graded based on the degree of difficulty associated with passing of the standard adult endoscope. RESULTS: The median delay in diagnosis of EoE was 6 years (interquartile range, 2-12 years). With increasing duration of delay in diagnosis, the prevalence of fibrotic features of EoE, based on endoscopy, increased from 46.5% (diagnostic delay, 0-2 years) to 87.5% (diagnostic delay, >20 years; P = .020). Similarly, the prevalence of esophageal strictures increased with duration of diagnostic delay, from 17.2% (diagnostic delay, 0-2 years) to 70.8% (diagnostic delay, >20 years; P < .001). Diagnostic delay was the only risk factor for strictures at the time of EoE diagnosis (odds ratio = 1.08; 95% confidence interval: 1.040-1.122; P < .001). CONCLUSIONS: The prevalence of esophageal strictures correlates with the duration of untreated disease. These findings indicate the need to minimize delay in diagnosis of EoE.
Resumo:
The inverse scattering problem concerning the determination of the joint time-delayDoppler-scale reflectivity density characterizing continuous target environments is addressed by recourse to the generalized frame theory. A reconstruction formula,involving the echoes of a frame of outgoing signals and its corresponding reciprocalframe, is developed. A ‘‘realistic’’ situation with respect to the transmission ofa finite number of signals is further considered. In such a case, our reconstruction formula is shown to yield the orthogonal projection of the reflectivity density onto a subspace generated by the transmitted signals.
Resumo:
The aim of this study was to evaluate the effect of delaying ovulation subsequent to superstimulation of follicular growth in beef cows (Bos indicus) on embryo recovery rates and the capacity of embryos to establish pregnancies. Ovulation was delayed by three treatments using either progesterone (CIDR-B®) or a GnRH agonist (deslorelin). Multiparous Nelore cows (n = 24) received three of four superstimulation treatments in an incomplete block design (n = 18 per group). Cows in Groups CTRL, P48 and P60 were treated with a CIDR-B device plus estradiol benzoate (EB, 4 mg, i.m.) on Day-5, while cows in Group D60 were implanted with deslorelin on Day-7. Cows were superstimulated with FSH (Folltropin-V® 200 mg), from Day 0 to 3, using twice daily injections in decreasing amounts. All cows were treated with a luteolytic dose of prostaglandin on Day 2 (08:00 h). CIDR-B devices were removed as follows: Group CTRL, Day 2 (20:00 h); Group P48, Day 4 (08:00 h); Group P60, Day 4 (20:00 h). Cows in Group CTRL were inseminated at 10, 20 and 30 h after first detected estrus. Ovulation was induced for cows in Group P48 (Day 4, 08:00 h) and Groups P60 and D60 (Day 4, 20:00 h) by injection of LH (Lutropin®, 25 mg, i.m.), and these cows were inseminated 10 and 20 h after treatment with LH. Embryos were recovered on Days 11 or 12, graded and transferred to synchronized recipients. Pregnancies were determined by ultrasonography around Day 100. Data were analyzed by mixed procedure, Kruskal-Wallis and Chi-square tests. The number of ova/embryos, transferable embryos (mean ± S.E.M.) and pregnancy rates (%) were as follows, respectively: Group CTRL (10.8 ± 1.8, 6.1 ± 1.3, 51.5), P48 (12.6 ± 1.9, 7.1 ± 1.0, 52.3), P60 (10.5 ± 1.6, 5.7 ± 1.3, 40.0) and D60 (10.3 ± 1.7, 5.0 ± 1.2, 50.0). There were no significant differences among the groups (P > 0.05). It was concluded that fixed time AI in association with induced ovulation did not influence embryo recovery. Furthermore, pregnancy rates in embryos recovered from cows with delayed ovulation were similar to those in embryos obtained from cows treated with a conventional superstimulation protocol. © 2002 Elsevier B.V. All rights reserved.
Resumo:
In water distribution systems, old metallic pipes have been replaced by plastic pipes due to their deterioration over time. Although acoustic methods are effective in finding leaks in metallic pipes, they have been found to be problematic when applied to plastic pipes due to the high damping within the pipe wall and the surrounding medium. This is responsible for the leak signal not traveling long distances. Moreover, the leak energy in plastic pipes is generally located at a narrow frequency range located at low frequencies. However, the presence of resonances can narrow even more this frequency range. In order to minimise the influence of background noise and resonances on the calculation of the time delay estimate, band-pass filters are often used to supress undesirable frequency components of the noise. The objective of this paper is to investigate the influence of resonances in the pipe system (pipe, valves, connections and hydrants), on the time delay estimate calculated using acoustic signals. Analytical models and actual leak data collected in a bespoke rig located in the United Kingdom are used to investigate this feature.
Resumo:
BACKGROUND & AIMS Development of strictures is a major concern for patients with eosinophilic esophagitis (EoE). At diagnosis, EoE can present with an inflammatory phenotype (characterized by whitish exudates, furrows, and edema), a stricturing phenotype (characterized by rings and stenosis), or a combination of these. Little is known about progression of stricture formation; we evaluated stricture development over time in the absence of treatment and investigated risk factors for stricture formation. METHODS We performed a retrospective study using the Swiss EoE Database, collecting data on 200 patients with symptomatic EoE (153 men; mean age at diagnosis, 39 ± 15 years old). Stricture severity was graded based on the degree of difficulty associated with passing of the standard adult endoscope. RESULTS The median delay in diagnosis of EoE was 6 years (interquartile range, 2-12 years). With increasing duration of delay in diagnosis, the prevalence of fibrotic features of EoE, based on endoscopy, increased from 46.5% (diagnostic delay, 0-2 years) to 87.5% (diagnostic delay, >20 years; P = .020). Similarly, the prevalence of esophageal strictures increased with duration of diagnostic delay, from 17.2% (diagnostic delay, 0-2 years) to 70.8% (diagnostic delay, >20 years; P < .001). Diagnostic delay was the only risk factor for strictures at the time of EoE diagnosis (odds ratio = 1.08; 95% confidence interval: 1.040-1.122; P < .001). CONCLUSIONS The prevalence of esophageal strictures correlates with the duration of untreated disease. These findings indicate the need to minimize delay in diagnosis of EoE.
Resumo:
Pulse oximetry is commonly used as an arterial blood oxygen saturation (SaO(2)) measure. However, its other serial output, the photoplethysmography (PPG) signal, is not as well studied. Raw PPG signals can be used to estimate cardiovascular measures like pulse transit time (PTT) and possibly heart rate (HR). These timing-related measurements are heavily dependent on the minimal variability in phase delay of the PPG signals. Masimo SET (R) Rad-9 (TM) and Novametrix Oxypleth oximeters were investigated for their PPG phase characteristics on nine healthy adults. To facilitate comparison, PPG signals were acquired from fingers on the same hand in a random fashion. Results showed that mean PTT variations acquired from the Masimo oximeter (37.89 ms) were much greater than the Novametrix (5.66 ms). Documented evidence suggests that I ms variation in PTT is equivalent to I mmHg change in blood pressure. Moreover, the PTT trend derived from the Masimo oximeter can be mistaken as obstructive sleep apnoeas based on the known criteria. HR comparison was evaluated against estimates attained from an electrocardiogram (ECG). Novametrix differed from ECG by 0.71 +/- 0.58% (p < 0.05) while Masimo differed by 4.51 +/- 3.66% (p > 0.05). Modem oximeters can be attractive for their improved SaO(2) measurement. However, using raw PPG signals obtained directly from these oximeters for timing-related measurements warrants further investigations.