928 resultados para tea waste
Resumo:
Tea waste (TW) and Date pits (DP) were investigated for their potential to remove toxic Cr(VI) ions from aqueous solution. Investigations showed that the majority of the bound Cr(VI) ions were reduced to Cr(III) after biosorption at acidic conditions. The electrons for the reduction of Cr(VI) may have been donated from the TW and DP biomasses. The experimental data obtained for Cr(VI)-TW and Cr(VI)-DP at different solution temperatures indicate a multilayer type biosorption, which explains why the Sips isotherm accurately represents the experimental data obtained in this study. The Sips maximum biosorption capacities of Cr(VI) onto TW and DP were 5.768 and 3.199 mmol/g at 333 K, respectively, which is comparatively superior to most other low-cost biomaterials. Fourier transform infrared spectroscopic analysis of the metal loaded biosorbents confirmed the participation of -COOH, -NH and O-CH groups in the reduction and complexation of chromium. Thermodynamic parameters demonstrated that the biosorption of Cr(VI) onto TW and DP biomass was endothermic, spontaneous and feasible at 303-333 K. The results evidently indicated that tea waste and date pits would be suitable biosorbents for Cr(VI) in wastewater under specific conditions.
Resumo:
This paper reports on a technical feasibility study of the production of organo-mineral fertiliser from the co-granulation of limestone powders with tea waste. The results from this preliminary study show that the co-granulation of tea waste provided an alternative method of waste recovery, as it converts the waste into a value-added product. Fertiliser granules were successfully produced from various compositions of limestone and tea waste. The effect of tea waste concentration on granule strength was analysed; the granule strength
was in the range 0.2 to 1.8 MPa depending on powder composition; increasing the tea waste mass fraction resulted in a reduction in granule strength.Varying the teawaste to limestone ratio also influenced the compressibility of the granules; the granules compressibility increased with increasing tea waste mass fraction. It was further found that increasing the mass fraction of tea waste in the binary mixture of powder reduced the granule median size of the batch.
Resumo:
With most recent studies being focused on the development of
advanced chemical adsorbents, this paper investigates the possibility of
using two natural low-cost materials for selective adsorption. Multiadsorbent
systems containing tea waste and dolomite have been tested for
their effectiveness in the removal of copper and methylene blue from
aqueous solutions. The effects of contact time, solution pH and
adsorption isotherms on the sorption behaviour were investigated. The
Langmuir and Freundlich isotherms adequately described the adsorption of
copper ions and methylene blue by both materials in different systems.
The highest adsorption capacities for Cu and MB were calculated as 237.7
at pH 4.5 and 150.44 mg.g‒1 at pH 7 for DO and TW+DO respectively. Tea
waste (TW) and dolomite (DO) were characterized by Fourier transform
infrared spectroscopy, scanning electron microscopy and Energy dispersive
X-ray analysis. The removal of Cu and MB by dolomite was mainly via
surface complexation while physisorption was responsible for most of the
Cu and MB adsorption onto tea waste. Identifying the fundamental mechanisms and behaviour is key to the development of practical multi-adsorbent packed columns.
Resumo:
Lead is present everywhere in the environment and has been defined as one of the greatest threats to the human health. In this paper, attempts have been made to study a way of recycling the lead produced from waste usage and disposed of in such a way as to avoid degrading the surrounding environment. In order to contain the waste, recycled asphalt material is mixed with the lead and then heated with microwave energy. This is an attempt to solidify and reduce the lead contaminants and use the final product as sub-base material in road pavement construction. The microwave heating of the specimens is carried out with 30%, 50%, 80% and 100% of power at 800W. The optimum power mode is used to compare with the conventional heating of asphalt with sulfur additive. The results are characterized by compact density, permeability, and subjected to toxicity test with regards to lead concentration. A mechanical test to evaluate the stability is also performed on the three methods of solidification and to prove that microwave zapping method allow to convert into an environmentally stable material for recycling without having to be deposited in a landfill site.
Resumo:
The Regenerating Construction Project for the CRC for Construction Innovation aims to assist in the delivery of demonstrably superior ‘green’ buildings. Components of the project address eco-efficient redesign, achieving a smaller ecological footprint, enhancing indoor environment and minimising waste in design and construction. The refurbishment of Council House 1 for Melbourne City Council provides an opportunity to develop and demonstrate tools that will be of use for commercial building refurbishment generally. It is hoped that the refurbishment will act as an exemplar project to demonstrate environmentally friendly possibilities for office building refurbishment.
Resumo:
The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.
Resumo:
Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.
Psychological and social correlates of attrition in a longitudinal study of hazardous waste exposure
Resumo:
It has long been recognised that government and public sector services suffer an innovation deficit compared to private or market-based services. This paper argues that this can be explained as an unintended consequence of the concerted public sector drive toward the elimination of waste through efficiency, accountability and transparency. Yet in an evolving economy this can be a false efficiency, as it also eliminates the 'good waste' that is a necessary cost of experimentation. This results in a systematic trade0off in the public sector between the static efficiency of minimizing the misuse of public resources and the dynamic efficiency of experimentation. this is inherently biased against risk and uncertainty and therein, explains why governments find service innovation so difficult. In the drive to eliminate static inefficiencies, many political systems have susequently overshot and stifled policy innovation. I propose the 'Red Queen' solution of adaptive economic policy.
Resumo:
Batch, column and field lysimeter studies have been conducted to evaluate the concept of codisposal of retort water with Rundle (Queensland, Australia) waste shales. The batch studies indicated that degradation of a significant proportion of the total organic load occurs if the mixture is seeded with soil or compost. These results are compared with those from laboratory column studies and from the field lysimeter at the Rundle site. G.c.-m.s. analysis of some of the eluants indicated that significant degradation of the base-neutral fraction occurs even if no soil seed is added, and that degradation of this fraction was higher under anaerobic conditions.
Resumo:
In the face of improved First Nation outcomes in many western nations, Australia is still dealing with a seemingly intractable gap between the quality of life of its Aboriginal and Torres Strait Islander peoples and the non-Aboriginal and Torres Strait Islander population. Philanthropy in Australia provides a smaller proportion of funding for community projects than is the case in other countries and Aboriginal and Torres Strait Islander causes have been significantly under - represented as recipients. This paper reports on a qualitative study aimed at understanding the issues affecting the decisions and actions of grantmaking organisations and individuals who wish to support Aboriginal and Torres Strait Islander causes in the current Australian context. The aims were to build on the limited research in this arena, add to the future research agenda and contribute to practice and policy insights for Australia and beyond. The study found that while government funding programs are perceived as output driven, inflexible and dogmatic - ‘a cup of tea mob’- participants see the Australian philanthropic sector as capable of addressing the complex Aboriginal and Torres Strait Islander ‘problem’ with more innovative and independent thinking. From the point of view of contextual impacts, success criteria, barriers, structural imposts and emotional involvement, the practical experience in grantmaking for Indigenous causes of participants in this study reflects that found elsewhere. However the focus of many grantmakers on organisational rather than community capacity and the potentially elitist emphasis on established relationships continues to hamper Aboriginal and Torres Strait Islander access to philanthropic funding in Australia. Further, if the strategic changes currently visible in the sector are unsupported by a depth of policy and a proactive transfer and distribution of skill and knowledge they may be unsustainable.