998 resultados para system upgrade


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Final degree project report. It summarizes the email upgrade project that was held at CELLS by Sergio Vicente.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In accordance with Iowa Code Section 8A.502(8) we are pleased to submit the Comprehensive Annual Financial Report (CAFR) for the State of Iowa for the fiscal year ended June 30, 2005. The report is presented in three sections as follows: • The Introductory Section includes this transmittal letter, the Government Finance Officers Association (GFOA) Certificate of Achievement for the fiscal year 2004 CAFR, an organizational chart of State government, and a list of principal State officials. • The Financial Section contains the independent auditor’s report on the Basic Financial Statements, Management’s Discussion and Analysis (MD&A), the Basic Financial Statements, and Notes to the Financial Statements. The Financial Section also contains Required Supplementary Information (RSI), other than the MD&A, and supplementary information in the form of combining financial statements and schedules. This letter is intended to be read in conjunction with the MD&A. • The Statistical Section highlights selected financial and demographic information, generally presented on a multi-year basis. The Department of Administrative Services is responsible for both the accuracy of the presented data, and the completeness and fairness of the presentation. We believe the information presented is accurate in all material respects and the necessary disclosures have been made which enable the reader to obtain an understanding of the State’s financial activity. This report has been prepared in accordance with U.S. generally accepted accounting principles (GAAP) for governments as promulgated by the Governmental Accounting Standards Board (GASB). As a part of the statewide accounting system upgrade during fiscal year 2005, the implementation team performed a comprehensive review of the adequacy of internal controls and budgetary controls of the system. The team determined that internal controls continue to be in place to provide reasonable, but not absolute, assurance that assets are safeguarded against unauthorized use or disposition, and that financial records from all appropriate sources are reliable for preparing financial statements and maintaining accountability. The concept of reasonable assurance recognizes the cost of internal controls should not exceed the benefits likely to be derived from their use. To monitor the adequacy of internal controls, the Auditor of State reviews internal control procedures as an integral part of departmental audits.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

High-speed non-contact laser profilers have become the standard testing equipment for pavement management ride quality testing. The same technology used in the high-speed profilers is now being used in lightweight profilers for construction smoothness testing. The lightweight profilers have many advantages over the California 25-ft profilograph. Despite the many advantages of the lightweight profilers, there is resistance from the contracting industry toward eliminating the 25-ft profilograph for construction ride testing. One way to reduce or overcome the resistance is to evaluate and demonstrate the advantages/disadvantages of the lightweight profiler in actual field use in Iowa. The objective of the study was to purchase a lightweight profiler and to evaluate its suitability for construction smoothness quality verification and quality acceptance on Iowa projects. A lightweight profiler, an Ames Engineering, Inc. LISA single laser unit, was received in February 2003 for the study. Based on the work done during the 2003 construction season, the following conclusions can be made: (1) For hot mix asphalt surfaces, the LISA correlated well with the contractors' profilographs; (2) LISA results are significantly affected by longitudinal tining on portland cement concrete pavements, requiring a laser system upgrade to give accurate results; (3) A significant timesaving was realized by using the LISA; (4) Increasing visibility and reducing time in the construction zone improved safety; (5) One person with limited lifting capabilities could set up and operate the LISA; and (6) With the current Iowa Department of Transportation specification, the LISA cannot totally replace the profilograph, since bridges and short segments with no adjoining pavement would still require a profilograph.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dynamically Reconfigurable Systems are attracting a growing interest, mainly due to the emergence of novel applications based on this technology. However, commercial tools do not provide enough flexibility to design solutions, while keeping an acceptable design productivity. In this paper, a novel design flow is proposed, targeting dynamically reconfigurable systems. It is fully supported by a tool called Dreams, which is able to implement flexible systems, starting from a set of netlists corresponding to the modules, as well as a system description provided by the user. The tool automatically post-processes the nets, implementing a solution for the communications between reconfigurable regions, as well as the handling of routing conflicts, by means of a custom router. Since the design process of every module and the static system are independent, the proposed flow is compatible with system upgrade at run-time. In this paper, a use case corresponding to the design of a highly regular and parallel mesh-type architecture is described, in order to show the architectural flexibility offered by the tool.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The purpose of this project is to update the tool of Network Traffic Recognition System (NTRS) which is proprietary software of Ericsson AB and Tsinghua University, and to implement the updated tool to finish SIP/VoIP traffic recognition. Basing on the original NTRS, I analyze the traffic recognition principal of NTRS, and redesign the structure and module of the tool according to characteristics of SIP/VoIP traffic, and then finally I program to achieve the upgrade. After the final test with our SIP data trace files in the updated system, a satisfactory result is derived. The result presents that our updated system holds a rate of recognition on a confident level in the SIP session recognition as well as the VoIP call recognition. In the comparison with the software of Wireshark, our updated system has a result which is extremely close to Wireshark’s output, and the working time is much less than Wireshark. In the aspect of practicability, the memory overflow problem is avoided, and the updated system can output the specific information of SIP/VoIP traffic recognition, such as SIP type, SIP state, VoIP state, etc. The upgrade fulfills the demand of this project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Over the air download is an important feature for terrestrial digital television systems. It provides a cheaper option for DTV receiver manufacturers to provide bug fixes and quality improvements to their products, allowing a shorter time to the market. This paper presents a mechanism proposal of an over the air download software update for the Brazilian system. This mechanism was specified considering the Brazilian DTV over the air download specifications, but it was extended considering efficiency, reliability and user transparency as requirements for software update. A proof of concept was implemented on a Linux based set-top box. The mechanism is divided into five main functional parts: download schedule, packets download, packets authentication, installation and error robustness. Some analyses were conducted upon the implementation considering the following criteria: download robustness and maximum downloading rate. (1)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BP Refinery (Bulwer Island) Ltd (BP) located on the eastern Australian coast is currently undergoing a major expansion as a part of the Queensland Clean Fuels Project. The associated wastewater treatment plant upgrade will provide a better quality of treated effluent than is currently possible with the existing infrastructure, and which will be of a sufficiently high standard to meet not only the requirements of imposed environmental legislation but also BP's environmental objectives. A number of challenges were faced when considering the upgrade, particularly; cost constraints and limited plot space, highly variable wastewater, toxicity issues, and limited available hydraulic head. Sequencing Batch Reactor (SBR) Technology was chosen for the lagoon upgrade based on the following; SBR technology allowed a retro-fit of the existing earthen lagoon without the need for any additional substantial concrete structures, a dual lagoon system allowed partial treatment of wastewaters during construction, SBRs give substantial process flexibility, SBRs have the ability to easily modify process parameters without any physical modifications, and significant cost benefits. This paper presents the background to this application, an outline of laboratory studies carried out on the wastewater and details the full scale design issues and methods for providing a cost effective, efficient treatment system using the existing lagoon system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trabalho apresentado para obtenção do Título de Especialista, pelo Instituto Superior de Contabilidade e Administração de Lisboa, do Instituto Politécnico de Lisboa

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In a “perfect” drinking water system, the water quality for the consumers should be the same as the quality of the water leaving the treatment plant. However, some variability along the system can lead to a decrease in water quality (such as discolouration) which is usually reflected in the number of the customer complaints. This change may be related to the amount of sediment in the distribution network, leading to an increase in turbidity at the water supply. Since there is no such thing as a perfect drinking water system, the behaviour of particles in a drinking water network needs a suitable approach in order to understand how it works. Moreover, the combination of measurements, such as turbidity patterns and the Resuspension Potential Method (RPM) aid in the prevention of discoloured water complaints and intervention in the treatment upgrade or the network cleaning. Besides sediments there is also bacterial regrowth in the network, which is related to the water quality and distribution network characteristics. In a theoretical drinking water system higher velocities, temperature and shorter residences times lead to wider bacterial growth. In this study we observe velocity and residence steady-states and bacterial does not seem to be related to either. It can be concluded that adequate measurements of RPM, customer complaints and bacterial concentrations allow a wider knowledge on particle behaviour in drinking water systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.