147 resultados para substation


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The modern society has come to expect the electrical energy on demand, while many of the facilities in power systems are aging beyond repair and maintenance. The risk of failure is increasing with the aging equipments and can pose serious consequences for continuity of electricity supply. As the equipments used in high voltage power networks are very expensive, economically it may not be feasible to purchase and store spares in a warehouse for extended periods of time. On the other hand, there is normally a significant time before receiving equipment once it is ordered. This situation has created a considerable interest in the evaluation and application of probability methods for aging plant and provisions of spares in bulk supply networks, and can be of particular importance for substations. Quantitative adequacy assessment of substation and sub-transmission power systems is generally done using a contingency enumeration approach which includes the evaluation of contingencies, classification of the contingencies based on selected failure criteria. The problem is very complex because of the need to include detailed modelling and operation of substation and sub-transmission equipment using network flow evaluation and to consider multiple levels of component failures. In this thesis a new model associated with aging equipment is developed to combine the standard tools of random failures, as well as specific model for aging failures. This technique is applied in this thesis to include and examine the impact of aging equipments on system reliability of bulk supply loads and consumers in distribution network for defined range of planning years. The power system risk indices depend on many factors such as the actual physical network configuration and operation, aging conditions of the equipment, and the relevant constraints. The impact and importance of equipment reliability on power system risk indices in a network with aging facilities contains valuable information for utilities to better understand network performance and the weak links in the system. In this thesis, algorithms are developed to measure the contribution of individual equipment to the power system risk indices, as part of the novel risk analysis tool. A new cost worth approach was developed in this thesis that can make an early decision in planning for replacement activities concerning non-repairable aging components, in order to maintain a system reliability performance which economically is acceptable. The concepts, techniques and procedures developed in this thesis are illustrated numerically using published test systems. It is believed that the methods and approaches presented, substantially improve the accuracy of risk predictions by explicit consideration of the effect of equipment entering a period of increased risk of a non-repairable failure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many substation applications require accurate time-stamping. The performance of systems such as Network Time Protocol (NTP), IRIG-B and one pulse per second (1-PPS) have been sufficient to date. However, new applications, including IEC 61850-9-2 process bus and phasor measurement, require accuracy of one microsecond or better. Furthermore, process bus applications are taking time synchronisation out into high voltage switchyards where cable lengths may have an impact on timing accuracy. IEEE Std 1588, Precision Time Protocol (PTP), is the means preferred by the smart grid standardisation roadmaps (from both the IEC and US National Institute of Standards and Technology) of achieving this higher level of performance, and integrates well into Ethernet based substation automation systems. Significant benefits of PTP include automatic path length compensation, support for redundant time sources and the cabling efficiency of a shared network. This paper benchmarks the performance of established IRIG-B and 1-PPS synchronisation methods over a range of path lengths representative of a transmission substation. The performance of PTP using the same distribution system is then evaluated and compared to the existing methods to determine if the performance justifies the additional complexity. Experimental results show that a PTP timing system maintains the synchronising performance of 1-PPS and IRIG-B timing systems, when using the same fibre optic cables, and further meets the needs of process buses in large substations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a reliability assessment of a substation, part of the Queensland transmission network in Australia. As part of a maintenance considerations, this study utilises the substation reliability assessment package STAREL to quantitatively compare the reliability improvement achieved by two circuit breaker reinforcement alternatives for Swanbank circuit breaker replacement or refurbishment. Substation reliability is interpreted on the basis of outage frequency and outage duration indices for each individual transmission line terminated in Swanbank 'B' substation. By considering the reliability indices in this paper with the cost associated conducted by POWERLINK Queensland, a Swanbank 'B' reinforcement alternative can be selected that optimises both transmission line security and the costs incurred in achieving it.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project researched the performance of emerging digital technology for high voltage electricity substations that significantly improves safety for staff and reduces the potential impact on the environment of equipment failure. The experimental evaluation used a scale model of a substation control system that incorporated real substation control and networking equipment with real-time simulation of the power system. The outcomes confirm that it is possible to implement Ethernet networks in high voltage substations that meet the needs of utilities; however component-level testing of devices is necessary to achieve this. The assessment results have been used to further develop international standards for substation communication and precision timing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis has developed a new approach to trace virtual protection signals in Electrical substation networks. The main goal of the research was to analyse the contents of the virtual signals transferred, using third party software. In doing so, a comprehensive test was done on a distance protection relay, using non-conventional test equipment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Substation Automation Systems have undergone many transformational changes triggered by improvements in technologies. Prior to the digital era, it made sense to confirm that the physical wiring matched the schematic design by meticulous and laborious point to point testing. In this way, human errors in either the design or the construction could be identified and fixed prior to entry into service. However, even though modern secondary systems today are largely computerised, we are still undertaking commissioning testing using the same philosophy as if each signal were hard wired. This is slow and tedious and doesn’t do justice to modern computer systems and software automation. One of the major architectural advantages of the IEC 61850 standard is that it “abstracts” the definition of data and services independently of any protocol allowing the mapping of them to any protocol that can meet the modelling and performance requirements. On this basis, any substation element can be defined using these common building blocks and are made available at the design, configuration and operational stages of the system. The primary advantage of accessing data using this methodology rather than the traditional position method (such as DNP 3.0) is that generic tools can be created to manipulate data. Self-describing data contains the information that these tools need to manipulate different data types correctly. More importantly, self-describing data makes the interface between programs robust and flexible. This paper proposes that the improved data definitions and methods for dealing with this data within a tightly bound and compliant IEC 61850 Substation Automation System could completely revolutionise the need to test systems when compared to traditional point to point methods. Using the outcomes of an undergraduate thesis project, we can demonstrate with some certainty that it is possible to automatically test the configuration of a protection relay by comparing the IEC 61850 configuration extracted from the relay against its SCL file for multiple relay vendors. The software tool provides a quick and automatic check that the data sets on a particular relay are correct according to its CID file, thus ensuring that no unexpected modifications are made at any stage of the commissioning process. This tool has been implemented in a Java programming environment using an open source IEC 61850 library to facilitate the server-client association with the relay.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increased construction and reconstruction of smart substations has exposed a problem with version management of substation configuration description language (SCL) files due to frequent changes. This paper proposes a comparative approach for differentiation of smart substation SCL configuration files. A comparison model for SCL configuration files is built in this method, which is based on the SCL structure and abstract model defined by IEC 61850. The proposed approach adopts the algorithms of depth-first traversal, sorting, and cross comparison in order to rapidly identify differences of changed SCL configuration files. This approach can also be utilized to detect malicious tampering or illegal manipulation tailoring for SCL files. SCL comparison software is developed using the Qt platform to validate the feasibility and effectiveness of the proposed approach.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An overview is given on the possibility of controlling the status of circuit breakers (CB) in a substations with the use of a knowledge base that relates some of the operation magnitudes, mixing status variables with time variables and fuzzy sets. It is shown that even when all the magnitudes to be controlled cannot be included in the analysis, it is possible to control the desired status while supervising some important magnitudes as the voltage, power factor, and harmonic distortion, as well as the present status.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents a basic analyis of the data collected on agroclimatology, erosion, and soil and water conservation at Afdeyu Station in the central highlands of Eritrea between 1984 and 2007. Datasets and graphs include rainfall, air and soil surface temperatures, soil loss, surface runoff, river discharge, and land use including cropping patterns of the measured catchment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Includes index.