840 resultados para risk benefit analysis


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The traditional economic approach for appraising the costs and benefits of construction project Net Present Values involves the calculation of net returns for each investment option under different discount rates. An alternative approach consists of multiple-project discount rates based on risk modelling. The example of a portfolio of microgeneration renewable energy technology (MRET) is presented to demonstrate that risks and future available budget for re-investment can be taken into account when setting discount rates for construction project specifications in presence of uncertainty. A formal demonstration is carried out through a reversed intertemporal approach of applied general equilibrium. It is demonstrated that risk and the estimated available budget for future re-investment can be included in the simultaneous assessment of the costs and benefits of multiple projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The implementation of Marine Protected Areas (MPAs) is ultimately a social endeavour to sustain or improve human well-being via the conservation of marine ecosystems. The degree to which ecological gains are realised can depend upon how economic, ecological and social costs (negative impacts) and benefits (positive impacts) are included in the designation and management process. Without the support of key stakeholder groups whose user rights have been affected by the creation of an MPA, human impacts cannot be reduced. This study analyses a three year dataset to understand the themes associated with the economic, environmental and social costs and benefits of an MPA in Lyme Bay, United Kingdom (UK) following its establishment in 2008. Methodologically, the paper presents an ecosystem based management framework for analysing costs and benefits. Two hundred and forty one individuals were interviewed via questionnaire between 2008 and 2010 to determine perceptions and the level of support towards the MPA. Results reveal that despite the contentious manner in which this MPA was established, support for the MPA is strong amongst the majority of stakeholder groups. The level of support and the reasons given for support vary between stakeholder groups. Overall, the stakeholders perceive the social, economic and environmental benefits of the MPA to outweigh the perceived costs. There have been clear social costs of the MPA policy and these have been borne by mobile and static gear fishermen and charter boat operators. Local support for this MPA bodes well for the development of a network of MPAs around the UK coast under the United Kingdom Marine and Coastal Access Act 2009. However, this initial optimism is at risk if stakeholder expectation is not managed and the management vacuum is not filled.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper presents a spreadsheet-based multiple account framework for cost-benefit analysis which incorporates all the usual concerns of cost-benefit analysts such as shadow-pricing to account for market failure. distribution of net benefits. sensitivity and risk analysis, cost of public funds, and environmental effects. The approach is generalizable to a wide range of projects and situations and offers a number of advantages to both analysts and decision-makers, including transparency, a check on internal consistency, and a detailed summary of project net benefits disaggregated by stakeholder group. Of particular importance is the ease with which this framework allows for a project to be evaluated from alternative decision-making perspectives and under alternative policy scenarios where the trade-offs among the project's stakeholders can readily be identified and quantified. (C) 2004 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A new methodology is proposed for the analysis of generation capacity investment in a deregulated market environment. This methodology proposes to make the investment appraisal using a probabilistic framework. The probabilistic production simulation (PPC) algorithm is used to compute the expected energy generated, taking into account system load variations and plant forced outage rates, while the Monte Carlo approach has been applied to model the electricity price variability seen in a realistic network. The model is able to capture the price and hence the profitability uncertainties for generator companies. Seasonal variation in the electricity prices and the system demand are independently modeled. The method is validated on IEEE RTS system, augmented with realistic market and plant data, by using it to compare the financial viability of several generator investments applying either conventional or directly connected generator (powerformer) technologies. The significance of the results is assessed using several financial risk measures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research is aimed at addressing problems in the field of asset management relating to risk analysis and decision making based on data from a Supervisory Control and Data Acquisition (SCADA) system. It is apparent that determining risk likelihood in risk analysis is difficult, especially when historical information is unreliable. This relates to a problem in SCADA data analysis because of nested data. A further problem is in providing beneficial information from a SCADA system to a managerial level information system (e.g. Enterprise Resource Planning/ERP). A Hierarchical Model is developed to address the problems. The model is composed of three different Analyses: Hierarchical Analysis, Failure Mode and Effect Analysis, and Interdependence Analysis. The significant contributions from the model include: (a) a new risk analysis model, namely an Interdependence Risk Analysis Model which does not rely on the existence of historical information because it utilises Interdependence Relationships to determine the risk likelihood, (b) improvement of the SCADA data analysis problem by addressing the nested data problem through the Hierarchical Analysis, and (c) presentation of a framework to provide beneficial information from SCADA systems to ERP systems. The case study of a Water Treatment Plant is utilised for model validation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper aims to present a preliminary benefit analysis for airborne GPS occultation technique for the Australian region. The simulation studies are based on current domestic commercial flights between major Australian airports. With the knowledge of GPS satellite ephemeris data, occultation events for for any particular flight can be determined. Preliminary analysis shows a high resolution occultation observations can be achieved with this approach, for instance, about 15 occultation events for a Perth-to-Sydney flight. The simulation result agrees to the results published by other researchers for a different region. Of course, occultation observation during off-peak hours might be affected due to the limited flight activities. --------- High resolution occultation observations obtainable from airborne GPS occultation system provides an opportunity to improve the current global numerical weather prediction (NWP) models and ultimately improves the accuracy in weather forecasting. More intensive research efforts and experimental demonstrations are required in order to demonstrate the technical feasibility of the airborne GPS technology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: It remains unclear whether it is possible to develop a spatiotemporal epidemic prediction model for cryptosporidiosis disease. This paper examined the impact of social economic and weather factors on cryptosporidiosis and explored the possibility of developing such a model using social economic and weather data in Queensland, Australia. ----- ----- Methods: Data on weather variables, notified cryptosporidiosis cases and social economic factors in Queensland were supplied by the Australian Bureau of Meteorology, Queensland Department of Health, and Australian Bureau of Statistics, respectively. Three-stage spatiotemporal classification and regression tree (CART) models were developed to examine the association between social economic and weather factors and monthly incidence of cryptosporidiosis in Queensland, Australia. The spatiotemporal CART model was used for predicting the outbreak of cryptosporidiosis in Queensland, Australia. ----- ----- Results: The results of the classification tree model (with incidence rates defined as binary presence/absence) showed that there was an 87% chance of an occurrence of cryptosporidiosis in a local government area (LGA) if the socio-economic index for the area (SEIFA) exceeded 1021, while the results of regression tree model (based on non-zero incidence rates) show when SEIFA was between 892 and 945, and temperature exceeded 32°C, the relative risk (RR) of cryptosporidiosis was 3.9 (mean morbidity: 390.6/100,000, standard deviation (SD): 310.5), compared to monthly average incidence of cryptosporidiosis. When SEIFA was less than 892 the RR of cryptosporidiosis was 4.3 (mean morbidity: 426.8/100,000, SD: 319.2). A prediction map for the cryptosporidiosis outbreak was made according to the outputs of spatiotemporal CART models. ----- ----- Conclusions: The results of this study suggest that spatiotemporal CART models based on social economic and weather variables can be used for predicting the outbreak of cryptosporidiosis in Queensland, Australia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

PURPOSE: The purpose of this study is to identify risk factors for developing complications following treatment of refractory glaucoma with transscleral diode laser cyclophotocoagulation (cyclodiode), to improve the safety profile of this treatment modality. METHOD: A retrospective analysis of 72 eyes from 70 patients who were treated with cyclodiode. RESULTS: The mean pre-treatment IOP was 37.0 mmHg (SD 11.0), with a mean post-treatment reduction in intraocular pressure (IOP) of 19.8 mmHg, and a mean IOP at last follow-up of 17.1 mmHg (SD 9.7). Mean total power delivered during treatment was 156.8 Joules (SD 82.7) over a mean of 1.3 treatments (SD 0.6). Sixteen eyes (22.2% of patients) developed complications from the treatment, with the most common being hypotony, occurring in 6 patients, including 4 with neovascular glaucoma. A higher pre-treatment IOP and higher mean total power delivery also were associated with higher complications. CONCLUSIONS: Cyclodiode is an effective treatment option for glaucoma that is refractory to other treatment options. By identifying risk factors for potential complications, cyclodiode can be modified accordingly for each patient to improve safety and efficacy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Migraine and major depressive disorder (MDD) are comorbid, moderately heritable and to some extent influenced by the same genes. In a previous paper, we suggested the possibility of causality (one trait causing the other) underlying this comorbidity. We present a new application of polygenic (genetic risk) score analysis to investigate the mechanisms underlying the genetic overlap of migraine and MDD. Genetic risk scores were constructed based on data from two discovery samples in which genome-wide association analyses (GWA) were performed for migraine and MDD, respectively. The Australian Twin Migraine GWA study (N = 6,350) included 2,825 migraine cases and 3,525 controls, 805 of whom met the diagnostic criteria for MDD. The RADIANT GWA study (N = 3,230) included 1,636 MDD cases and 1,594 controls. Genetic risk scores for migraine and for MDD were used to predict pure and comorbid forms of migraine and MDD in an independent Dutch target sample (NTR-NESDA, N = 2,966), which included 1,476 MDD cases and 1,058 migraine cases (723 of these individuals had both disorders concurrently). The observed patterns of prediction suggest that the 'pure' forms of migraine and MDD are genetically distinct disorders. The subgroup of individuals with comorbid MDD and migraine were genetically most similar to MDD patients. These results indicate that in at least a subset of migraine patients with MDD, migraine may be a symptom or consequence of MDD. © 2013 Springer-Verlag Berlin Heidelberg.