900 resultados para renewable energy distribution
Resumo:
The federal government is aggressively promoting biofuels as an answer to global climate change and dependence on imported sources of energy. Iowa has quickly become a leader in the bioeconomy and wind energy production, but meeting the United States Department of Energy’s goal having 20% of U.S. transportation fuels come from biologically based sources by 2030 will require a dramatic increase in ethanol and biodiesel production and distribution. At the same time, much of Iowa’s rural transportation infrastructure is near or beyond its original design life. As Iowa’s rural roadway structures, pavements, and unpaved roadways become structurally deficient or functionally obsolete, public sector maintenance and rehabilitation costs rapidly increase. More importantly, costs to move all farm products will rapidly increase if infrastructure components are allowed to fail; longer hauls, slower turnaround times, and smaller loads result. When these results occur on a large scale, Iowa will start to lose its economic competitive edge in the rapidly developing bioeconomy. The primary objective of this study was to document the current physical and fiscal impacts of Iowa’s existing biofuels and wind power industries. A four-county cluster in north-central Iowa and a two-county cluster in southeast Iowa were identified through a local agency survey as having a large number of diverse facilities and were selected for the traffic and physical impact analysis. The research team investigated the large truck traffic patterns on Iowa’s secondary and local roads from 2002 to 2008 and associated those with the pavement condition and county maintenance expenditures. The impacts were quantified to the extent possible and visualized using geographic information system (GIS) tools. In addition, a traffic and fiscal assessment tool was developed to understand the impact of the development of the biofuels on Iowa’s secondary road system. Recommended changes in public policies relating to the local government and to the administration of those policies included standardizing the reporting and format of all county expenditures, conducting regular pavement evaluations on a county’s system, cooperating and communicating with cities (adjacent to a plant site), considering utilization of tax increment financing (TIF) districts as a short-term tool to produce revenues, and considering alternative ways to tax the industry.
Resumo:
Incluye Bibliografía
Resumo:
Belize is currently faced with several critical challenges associated with the production, distribution and use of energy. Despite an abundance of renewable energy resources, the country remains disproportionately dependent on imported fossil fuels, which exposes it to volatile and rising oil prices, limits economic development, and retards its ability to make the investments that are necessary for adapting to climate change, which pose a particularly acute threat to the small island states and low-lying coastal nations of the Caribbean. This transition from energy consumption and supply patterns that are based on imported fossil fuels and electricity towards a more sustainable energy economy that is based on environmentally benign, indigenous renewable energy technologies and more efficient use of energy requires concerted action as the country is already challenged by limited fiscal space which reduces its ability to provide some fiscal incentives, which have been proven to be effective tools for the promotion of sustainable energy markets in a number of countries. This report identifies the fiscal and regulatory barriers to implementation of energy efficiency measures and renewable energy technologies in Belize. Data and information were derived from stakeholder consultations conducted within the country. The major result of the assessment is that the transition of policies and plans into tangible action needs to be increased. In this regard, it is necessary to articulate sub-policies of the National Energy Policy to amend the Public Utilities Commission Act, to develop a grid interconnection policy, to establish minimum energy performance standards for buildings and equipment and to develop a public procurement policy. Finally, decisions on renewable energy and energy efficiency-related incentives from the Government formally requires decision-makers to solve what may be extremely complex optimization problems in order to obtain the lowest-cost provision of energy services to society, thereby weighing the cost of revenue losses with the benefits of fuel and infrastructure expansion savings. The establishment of a management system that is efficient, flexible, and transparent, which will facilitate the implementation of the strategic objectives and outputs in the time available, with the financial resources allocated is recommended. Support is required for additional institutional and capacity strengthening.
Resumo:
The recognition of the relevance of energy, especially of the renewable energies generated by the sun, water, wind, tides, modern biomass or thermal is growing significantly in the global society based on the possibility it has to improve societies′ quality of life, to support poverty reduction and sustainable development. Renewable energy, and mainly the energy generated by large hydropower generation projects that supply most of the renewable energy consumed by developing countries, requires many technical, legal, financial and social complex processes sustained by innovations and valuable knowledge. Besides these efforts, renewable energy requires a solid infrastructure to generate and distribute the energy resources needed to solve the basic needs of society. This demands a proper construction performance to deliver the energy projects planned according to specifications and respecting environmental and social concerns, which implies the observance of sustainable construction guidelines. But construction projects are complex and demanding and frequently face time and cost overruns that may cause negative impacts on the initial planning and thus on society. The renewable energy issue and the large renewable energy power generation and distribution projects are particularly significant for developing countries and for Latin America in particular, as this region concentrates an important hydropower potential and installed capacity. Using as references the performance of Venezuelan large hydropower generation projects and the Guri dam construction, this research evaluates the tight relationship existing between sustainable construction and knowledge management and their impact to achieve sustainability goals. The knowledge management processes are proposed as a basic strategy to allow learning from successes and failures obtained in previous projects and transform the enhancement opportunites into actions to improve the performance of the renewable energy power generation and distribution projects.
Resumo:
Peer reviewed
Resumo:
Funded by Kone Foundation ERC-StG. Grant Number: 260393 Academy of Finland Centre of Excellence Programme 2012–2017
Resumo:
Nowadays, the development of the photovoltaic (PV) technology is consolidated as a source of renewable energy. The research in the topic of maximum improvement on the energy efficiency of the PV plants is today a major challenge. The main requirement for this purpose is to know the performance of each of the PV modules that integrate the PV field in real time. In this respect, a PLC communications based Smart Monitoring and Communications Module, which is able to monitor at PV level their operating parameters, has been developed at the University of Malaga. With this device you can check if any of the panels is suffering any type of overriding performance, due to a malfunction or partial shadowing of its surface. Since these fluctuations in electricity production from a single panel affect the overall sum of all panels that conform a string, it is necessary to isolate the problem and modify the routes of energy through alternative paths in case of PV panels array configuration.
Resumo:
An algorithm inspired on ant behavior is developed in order to find out the topology of an electric energy distribution network with minimum power loss. The algorithm performance is investigated in hypothetical and actual circuits. When applied in an actual distribution system of a region of the State of Sao Paulo (Brazil), the solution found by the algorithm presents loss lower than the topology built by the concessionary company.
Resumo:
A bituminous coal was pyrolyzed in a nitrogen stream in an entrained flow reactor at various temperatures from 700 to 1475 degreesC. Char samples were collected at different positions along the reactor. Each collected sample was oxidized nonisothermally in a TGA for reactivity determination. The reactivity of the coal char was found to decrease rapidly with residence time until 0.5 s, after which it decreased only slightly. On the bases of the reactivity data at various temperatures, a new approach was utilized to obtaining the true activation energy distribution function for thermal annealing without the assumption of any distribution function form or a constant preexponential factor. It appears that the true activation energy distribution function consists of two separate parts corresponding to different temperature ranges, suggesting different mechanisms in different temperature ranges. Partially burnt coal chars were also collected along the reactor when the coal was oxidized in air at various temperatures from 700 to 1475 degreesC. The collected samples were analyzed for the residual carbon content and the specific reaction rate was estimated. The characteristic time of thermal deactivation was compared with that of oxidation under realistic conditions. The characteristic times were found to be close to each other, indicating the importance of thermal deactivation during combustion of the coal studied.
Resumo:
The management of energy resources for islanded operation is of crucial importance for the successful use of renewable energy sources. A Virtual Power Producer (VPP) can optimally operate the resources taking into account the maintenance, operation and load control considering all the involved cost. This paper presents the methodology approach to formulate and solve the problem of determining the optimal resource allocation applied to a real case study in Budapest Tech’s. The problem is formulated as a mixed-integer linear programming model (MILP) and solved by a deterministic optimization technique CPLEX-based implemented in General Algebraic Modeling Systems (GAMS). The problem has also been solved by Evolutionary Particle Swarm Optimization (EPSO). The obtained results are presented and compared.
Resumo:
Avança dados das perspetivas de diferentes gerações sobre questões ambientais e consumo energético.
Resumo:
The purpose of this article is to analyse and evaluate the economical, energetic and environmental impacts of the increasing penetration of renewable energies and electrical vehicles in isolated systems, such as Terceira Island in Azores and Madeira Island. Given the fact that the islands are extremely dependent on the importation of fossil fuels - not only for the production of energy, but also for the transportation’s sector – it’s intended to analyse how it is possible to reduce that dependency and determine the resultant reduction of pollutant gas emissions. Different settings have been analysed - with and without the penetration of EVs. The Terceira Island is an interesting case study, where EVs charging during off-peak hours could allow an increase in geothermal power, limited by the valley of power demand. The percentage of renewable energy in the electric power mix could reach the 74% in 2030 while at the same time, it is possible to reduce the emissions of pollutant gases in 45% and the purchase of fossil fuels in 44%. In Madeira, apart from wind, solar and small hydro power, there are not so many endogenous resources and the Island’s emission factor cannot be so reduced as in Terceira. Although, it is possible to reduce fossil fuels imports and emissions in 1.8% in 2030 when compared with a BAU scenario with a 14% of the LD fleet composed by EVs.
Resumo:
The purpose of this article is to analyse and evaluate the economical, energetic and environmental impacts of the increasing penetration of renewable energies and electrical vehicles in isolated systems, such as Terceira Island in Azores and Madeira Island. Given the fact that the islands are extremely dependent on the importation of fossil fuels - not only for the production of energy, but also for the transportation’s sector – it’s intended to analyse how it is possible to reduce that dependency and determine the resultant reduction of pollutant gas emissions. Different settings have been analysed - with and without the penetration of EVs. The Terceira Island is an interesting case study, where EVs charging during off-peak hours could allow an increase in geothermal power, limited by the valley of power demand. The percentage of renewable energy in the electric power mix could reach the 74% in 2030 while at the same time, it is possible to reduce the emissions of pollutant gases in 45% and the purchase of fossil fuels in 44%. In Madeira, apart from wind, solar and small hydro power, there are not so many endogenous resources and the Island’s emission factor cannot be so reduced as in Terceira. Although, it is possible to reduce fossil fuels imports and emissions in 1.8% in 2030 when compared with a BAU scenario with a 14% of the LD fleet composed by EVs.
Resumo:
The Basel III will have a significant impact on the European banking sector. In September 2010, supervisors of various countries adopted the new rules proposed by the prudential Committee on Banking Supervision to be applied to the business of credit institutions (hereinafter called ICs) in a phased manner from 2013, assuming to its full implementation by 2019. The purpose of this new regulation is to limit the excessive risk that these institutions took on the period preceding the global financial crisis of 2008. This new regulation is known in slang by Basel III. Depending on the requirement of Basel II for banks and their supervisors to assess the soundness and adequacy of internal risk measurement and credit management systems, the development of methodologies for the validation of internal and external evaluation systems is clearly an important issue . More specifically, there is a need to develop tools to validate the systems used to generate the parameters (such as PD, LGD, EAD and ratings of perceived risk) that serve as starting points for the IRB approach for credit risk. In this context, the work is composed of a number of approaches and tools used to evaluate the robustness of these elements IRB systems.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics