85 resultados para refurbishment
Resumo:
The main objective was to compare the environmental impacts of a building undergoing refurbishment both before and after the refurbishment and to assist in the design of the refurbishment with what is learned.
Resumo:
A need for an efficient life care management of building portfolio is becoming increasingly due to increase in aging building infrastructure globally. Appropriate structural engineering practices along with facility management can assist in optimising the remaining life cycle costs for existing public building portfolio. A more precise decision to either demolish, refurbish, do nothing or rebuilt option for any typical building under investigation is needed. In order to achieve this, the status of health of the building needs to be assessed considering several aspects including economic and supply-demand considerations. An investment decision for a refurbishment project competing with other capital works and/or refurbishment projects can be supported by emerging methodology residual service life assessment. This paper discusses challenges in refurbishment projects of public buildings and with a view towards development of residual service life assessment methodology
Resumo:
In recent years considerable effort has gone into quantifying the reuse and recycling potential of waste generated by residential construction. Unfortunately less information is available for the commercial refurbishment sector. It is hypothesised that significant economic and environmental benefit can be derived from closer monitoring of the commercial construction waste stream. With the aim of assessing these benefits, the authors are involved in ongoing case studies to record both current standard practice and the most effective means of improving the eco-efficiency of materials use in office building refurbishments. This paper focuses on the issues involved in developing methods for obtaining the necessary information on better waste management practices and establishing benchmark indicators. The need to create databases to establish benchmarks of waste minimisation best practice in commercial construction is stressed. Further research will monitor the delivery of case study projects and the levels of reuse and recycling achieved in directly quantifiable ways
Resumo:
The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.
Resumo:
Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.
Resumo:
The refurbishment of The National Trust House (Basement3), undertaken in 2005, represents heritage consultation, architectural and interior design of a disused and deteriorating subbasement of a historically and culturally significant building situated in Brisbane. Research into rectification and restoration work of the existing structure and interior surfaces (inclusive of masonry work sourced from the Kangaroo Point quarry in the 1860's) formed a significant component of the project. The National Trust House sub basement 3 was refurbished to house the Architectural Practice Academy, a joint initiative of the Queensland Government and the Australian Institute of Architects.
Resumo:
The increasing stock of aging office buildings will see a significant growth in retrofitting projects in Australian capital cities. Stakeholders of refitting works will also need to take on the sustainability challenge and realize tangible outcomes through project delivery. Traditionally, decision making for aged buildings, when facing the alternatives, is typically economically driven and on ad hoc basis. This leads to the tendency to either delay refitting for as long as possible thus causing building conditions to deteriorate, or simply demolish and rebuild with unjust financial burden. The technologies involved are often limited to typical strip-clean and repartition with dry walls and office cubicles. Changing business operational patterns, the efficiency of office space, and the demand on improved workplace environment, will need more innovative and intelligent approaches to refurbishing office buildings. For example, such projects may need to respond to political, social, environmental and financial implications. There is a need for the total consideration of buildings structural assessment, modeling of operating and maintenance costs, new architectural and engineering designs that maximise the utility of the existing structure and resulting productivity improvement, specific construction management procedures including procurement methods, work flow and scheduling and occupational health and safety. Recycling potential and conformance to codes may be other major issues. This paper introduces examples of Australian research projects which provided a more holistic approach to the decision making of refurbishing office space, using appropriate building technologies and products, assessment of residual service life, floor space optimisation and project procurement in order to bring about sustainable outcomes. The paper also discusses a specific case study on critical factors that influence key building components for these projects and issues for integrated decision support when dealing with the refurbishment, and indeed the “re-life”, of office buildings.
Resumo:
This paper presents the development of a new building physics and energy supply systems simulation platform. It has been adapted from both existing commercial models and empirical works, but designed to provide expedient exhaustive simulation of all salient types of energy- and carbon-reducing retrofit options. These options may include any combination of behavioural measures, building fabric and equipment upgrades, improved HVAC control strategies, or novel low-carbon energy supply technologies. We provide a methodological description of the proposed model, followed by two illustrative case studies of the tool when used to investigate retrofit options of a mixed-use office building and primary school in the UK. It is not the intention of this paper, nor would it be feasible, to provide a complete engineering decomposition of the proposed model, describing all calculation processes in detail. Instead, this paper concentrates on presenting the particular engineering aspects of the model which steer away from conventional practise. © 2011 Elsevier Ltd.
Resumo:
The UK government is committed to effectively implement a viable sustainable agenda in the social housing sector. To this end housing associations and local authorities are being encouraged to improve the environmental performance of their new and existing homes. Whilst much attention has been focused on new housing (e.g. the Code for Sustainable Homes) little effort has been focussed on improving the 3.9 (approx) million homes maintained and managed by the public sector (in England), which, given the low rate of new build and demolition (<1% in England), will represent approximately 70% of the public housing stock in 2050. Thus, if UK is to achieve sustainable public housing the major effort will have to focus on the existing stock. However, interpreting the sustainability agenda for an existing housing portfolio is not a straight foreword activity. In addition to finding a ‘technical’ solution, landlords also haveto address the socio-economic issues that balance quality of expectations of tenants with the economic realities of funding social housing refurbishment. This paper will report the findings of a qualitative study (participatory approach) that examined the processes by which a large public landlord sought to develop a long-term sustainable housing strategy. Through a series of individual meetings and group workshops the research team identified: committed leadership; attitudes towards technology; social awareness; and collective understanding of the sustainability agenda as key issues that the organisation needed to address in developing a robust and defendable refurbishment strategy. The paper concludes that the challenges faced by the landlord in improving the sustainability of their existing stock are not primarily technical, but socio-economic. Further, while the economic challenges: initial capital cost; lack of funding; and pay-back periods can be overcome, if the political will exists, by fiscal measures; the social challenges: health & wellbeing; poverty; security; space needs; behaviour change; education; and trust; are much more complex in nature and will require a coordinated approach from all the stakeholders involved in the wider community if they are to be effectively addressed. The key challenge to public housing landlords is to develop mechanisms that can identify and interpret the complex nature of the social sustainability agenda in a way that reflects local aspirations (although the authors believe the factors will exist in all social housing communities, their relative importance is likely to vary between communities) whilst addressing Government agendas.