982 resultados para real options


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper examines the relationships between uncertainty and the perceived usefulness of traditional annual budgets versus flexible budgets in 95 Swedish companies. We form hypotheses that the perceived usefulness of the annual budgets as well as the attitudes to more flexible budget alternatives are influenced by the uncertainty that the companies face. Our study distinguishes between two separate kinds of uncertainty: exogenous stochastic uncertainty (deriving from the firm’s environment) and endogenous deterministic uncertainty (caused by the strategic choices made by the firm itself). Based on a structural equations modelling analysis of data from a mail survey we found that the more accentuated exogenous uncertainty a company faces, the more accentuated is the expected trend towards flexibility in the budget system, and vice versa; the more endogenous uncertainty they face, the more negative are their attitudes towards budget flexibility. We also found that these relationships were not present with regard to the attitudes towards the usefulness of the annual budget. Noteworthy is, however, that there was a significant negative relationship between the perceived usefulness of the annual budget and budget flexibility. Thus, our results seem to indicate that the degree of flexibility in the budget system is influenced by both general attitudes towards the usefulness of traditional budgets and by the actual degree of exogenous uncertainty a company faces and by the strategy that it executes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study develops a real options approach for analyzing the optimal risk adoption policy in an environment where the adoption means a switch from one stochastic flow representation into another. We establish that increased volatility needs not decelerate investment, as predicted by the standard literature on real options, once the underlying volatility of the state is made endogenous. We prove that for a decision maker with a convex (concave) objective function, increased post-adoption volatility increases (decreases) the expected cumulative present value of the post-adoption profit flow, which consequently decreases (increases) the option value of waiting and, therefore, accelerates (decelerates) current investment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

27 p.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We address the valuation of an operating wind farm and the finite-lived option to invest in it under different reward/support schemes: a constant feed-in tariff, a premium on top of the electricity market price (either a fixed premium or a variable subsidy such as a renewable obligation certificate or ROC), and a transitory subsidy, among others. Futures contracts on electricity with ever longer maturities enable market-based valuations to be undertaken. The model considers up to three sources of uncertainty: the electricity price, the level of wind generation, and the certificate (ROC) price where appropriate. When analytical solutions are lacking, we resort to a trinomial lattice combined with Monte Carlo simulation; we also use a two-dimensional binomial lattice when uncertainty in the ROC price is considered. Our data set refers to the UK. The numerical results show the impact of several factors involved in the decision to invest: the subsidy per MWh generated, the initial lump-sum subsidy, the maturity of the investment option, and electricity price volatility. Different combinations of variables can help bring forward investments in wind generation. One-off policies, e.g., a transitory initial subsidy, seem to have a stronger effect than a fixed premium per MWh produced.