938 resultados para public asset management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Over the last thirty years, there has been an increased demand for better management of public sector organisations (PSOs). This requires that they are answerable for the inputs that they are given but also for what they achieve with these inputs (Hood 1991; Hood 1995). It is suggested that this will improve the management of the organisation through better planning and control, and the achievement of greater accountability (Smith 1995). However, such a rational approach with clear goals and the means to measure achievement can cause difficulties for many PSOs. These difficulties include the distinctive nature of the public sector due to the political environment within which the public sector manager operates (Stewart and Walsh 1992) and the fact that PSOs will have many stakeholders, each of whom will have their own specific objectives based on their own perspective (Boyle 1995). This can
result in goal ambiguity which means that there is leeway in interpreting the results of the PSO. The National Asset Management Agency (NAMA) was set up to bring stability to the financial system by buying loans from the banks (which were in most cases, non-performing loans). The intention was to cleanse the banks of these loans so that they could return to their normal business of taking deposits and making loans. However, the legislation, also gave NAMA a wide range of other responsibilities including responsibility for facilitating credit in the economy and protecting the interests of taxpayers. In more recent times, NAMA has been given responsibility for building social housing. This wide-range of activities is a clear example of a PSO being given multiple goals which may conflict and is therefore likely to lead to goal ambiguity. This makes it very difficult to evaluate NAMA’s performance as they are attempting to meet numerous goals at the same time and also highlights the complexity of policy making in the public sector. The purpose of this paper is to examine how NAMA dealt with goal ambiguity. This will be done through a thematic analysis of its annual reports over the last five years. The paper’s will contribute to the ongoing debate about the evaluation of PSOs and the complex environment within which they operate which makes evaluation difficult as they are
answerable to multiple stakeholders who have different objectives and different criteria for measuring success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite the large size of the Brazilian debt market, as well the large diversity of its bonds, the picture that emerges is of a market that has not yet completed its transition from the role it performed during the megainflation years, namely that of providing a liquid asset that provided positive real returns. This unfinished transition is currently placing the market under severe stress, as fears of a possible default from the next administration grow larger. This paper analyzes several aspects pertaining to the management of the domestic public debt. The causes for the extremely large and fast growth ofthe domestic public debt during the seven-year period that President Cardoso are discussed in Section 2. Section 3 computes Value at Risk and Cash Flow at Risk measures for the domestic public debt. The rollover risk is introduced in a mean-variance framework in Section 4. Section 5 discusses a few issues pertaining to the overlap between debt management and monetary policy. Finally, Section 6 wraps up with policy discussion and policy recommendations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper focuses on identifying and analysing the elements of Strategic Management for infrastructure and engineering assets. These elements are contended to involve an understanding of governance, corporate policy, corporate objectives, corporate strategy and interagency collaboration and will in turn, allow the ability determine a broader and more comprehensive framework for engineering asset management, ie a ‘staged approach’ to understanding how assets are managed within organisations. While the assets themselves have often been the sole concern for good management practices, other social and contextual elements have come into the mix in order to promote strategic asset management. The development of an integrated approach to asset management is at the base of the research question. What are the considerations and implications for adopting and implementing an integrated strategic asset management (ISAM) framework? While operational matters have been given prominence, a subset of corporate governance, Asset Governance, details the policies and processes needed to acquire, utilise, maintain and account for an organisation’s assets. Asset governance stems from the organisation’s overarching corporate governance principles; as a result it defines the management context in which engineering asset management is implemented. This aspect will be examined to determine the appropriate relationship between organisational strategic management and strategic asset management to further the theoretical engagement with the maturity of strategy,policy and governance for infrastructure and engineered assets. Asset governance stems from the organisation’s overarching corporate governance principles; as a result it defines the management context in which engineering asset management is implemented. The research proceeds by a document analysis of corporate reports and policy recommendations in terms of infrastructure and engineered assets. The paper concludes that incorporating an integrated asset management framework can promote a more robust conceptualisation of public assets and how they combine to provide a comprehensive system of service outcomes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Also known as The Grace report.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"HRDS-06/10-05(1M)E"--P. [4] of cover.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Hospitals from ancient Seville had an important heritage for survival of the institution and its patients. In order to keep this heritage, the officialdom settled down several control mechanisms that would serve to manage a profitable management of their income and rights. For this purpose, they developed devising instruments able to preserve their possessions and put them into operation. This article attempts to identify the defining elements of these books, called “protocolos de bienes” (protocols goods), indicating their characteristics and evolution from archaic models until the final form. This final form was reached late sixteenth and early seventeenth century, at which time devoted use main codex of hospitality. To do this, we used the documentary collec-tions of Seville, preserved in different archives of the city, from where they have taken several significant examples showing the changes that occurred in both its internal structure and its mate-rials manufacturing, underlining the participation of official, booksellers, illuminators and calligraphers. Similarly, it has high-lighted the multifaceted and multifunctional character of this ins-titutions that became also a corporate identity. The multiplicity of hospitals in Sevilla had different types and features of protocols, which were modificated according to the different needs of each institution.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Historically SCDOT ranks in the top 10 each year for highway conditions and cost-effectiveness as rated by the Reason Foundation. With billions of dollars invested and billions to be invested it makes sense to invest the public's tax dollars as wisely as possible. Therefore, assessing what we have or better yet what condition what we have is in can be vital to public safety and setting priorities. The focus of this project is on the maintenance responsibility of Roadway Inspection as outlined in SCDOT Engineering Directive Memorandum #8. This memorandum is a portion of the way SCDOT provides for the safety of the traveling public and keeps South Carolina's most expensive asset in working order.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação apresentada para cumprimento dos requisitos necessários à obtenção do grau de Mestre em Ciências da Informação e da Documentação na variante Arquivística

Relevância:

100.00% 100.00%

Publicador:

Resumo:

L'objectiu d'aquest treball no és oferir els mateixos serveis que els productes comercials, sinó utilitzar el coneixement bàsic en aquest sector per crear una aplicació simple

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Expanded abstract: Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some new best practices for field staff to assist in the inventory, inspection and maintenance of assets along the roadway. The team has spent the past year working through the complexities of identifying the most appropriate tablet hardware for field data collection. A small scale deployment of tablets occurred in spring of 2013 to collect several safety related assets (culverts, signs, guardrail, and incidents). Data can be collected in disconnected or connected modes and there is an associated desktop environment where data can be viewed and queried after being synced into the master database. The development of a deployment plan and related workflow processes are underway; which will eventually feed information into IA DOTs larger asset management system and make the information available for decision making. The team is also working with the IA DOT Design Office on Computer Aided Drafting (CAD) data processing and the IA DOT Construction office with a new digital As-Built plan process to leverage the complete data life-cycle so information can be developed once and leveraged by the Maintenance staff farther along in the process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project resulted in the development of a framework for making asset management decisions on low-volume bridges. The research focused on low-volume bridges located in the agricultural counties of Iowa because recent research has shown that these counties have the greatest percentage of structurally deficient bridges in the nation. Many of the same counties also have the highest crop yields in the state, creating a situation where detours caused by deficient bridges on farm-to-market roads increase the cost to transport the crops. Thus, the research proposed the use of social return on investment (SROI), a tool used by international institutions such as the World Bank, as an asset management metric to gauge to the socioeconomic impact of structurally deficient bridges on the state in an effort to provide quantified justification to fund improvements on low-volume assets such as these rural bridges. The study found that combining SROI with current asset management metrics like average daily traffic (ADT) made it possible to prioritize the bridges in such a way that the limited resources available are allocated in a manner that promotes a more equitable distribution and that directly benefits the user, in this case Iowa farmers. The result is a system that more closely aligns itself with the spirit of MAP-21, in that infrastructure investments are used to facilitate economic growth for Iowa’s agricultural economy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for or against full deployment of the pilot solution.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for a full deployment of a field data collection.