969 resultados para project stakeholders
Resumo:
Defining success in mega projects has been a challenging exercise for Australian Defence. The inherent conflict between nation capability building and cost efficiency raises questions about how to appropriately define mega project success. Contrary to the traditional output-focused project methodology, the value creation perspective argues for the importance of creating new knowledge, processes, and systems for suppliers and customers. Stakeholder involvement is important in this new perspective, as the balancing of competing needs of stakeholders in mega projects becomes a major challenge in managing the value co-creation process. In our earlier study reported interview data from three Australian defence mega projects and reported that those senior executives have a more complex understanding of project success than traditional iron triangle measures. In these mega defence projects, customers and other stakeholders actively engage in the value creation process, and over time both content and process value are created to increase defence and national capability. Value created and captured during and post projects are the key to true success. We aim to develop a comprehensive theoretical model the capture the value co-creation process as a way of re-conceptualising success in mega projects. We propose a new framework redefine project value as multi-dimensional, contextual and temporal construct that emerges from the interactions among multiple stake holders over the complete project life cycle. The framework distinguishes between exploitation and exploration types of projects, and takes into consideration the requisite governance structures.
Resumo:
Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.
Resumo:
With increasing pressure to deliver environmentally friendly and socially responsible highway infrastructure projects, stakeholders are also putting significant focus on the early identification of financial viability and outcomes for these projects. Infrastructure development typically requires major capital input, which may cause serious financial constraints for investors. The push for sustainability has added new dimensions to the evaluation of highway projects, particularly on the cost front. Comprehensive analysis of the cost implications of implementing place sustainable measures in highway infrastructure throughout its lifespan is highly desirable and will become an essential part of the highway development process and a primary concern for decision makers. This paper discusses an ongoing research which seeks to identify cost elements and issues related to sustainable measures for highway infrastructure projects. Through life-cycle costing analysis (LCCA), financial implications of pursuing sustainability, which are highly concerned by the construction stakeholders, have been assessed to aid the decision making when contemplating the design, development and operation of highway infrastructure. An extensive literature review and evaluation of project reports from previous Australian highway projects was first conducted to reveal all potential cost elements. This provided the foundation for a questionnaire survey, which helped identify those specific issues and related costs that project stakeholders consider to be most critical in the Australian industry context. Through the survey, three key stakeholders in highway infrastructure development, namely consultants, contractors and government agencies, provided their views on the specific selection and priority ranking of the various categories. Findings of the survey are being integrated into proven LCCA models for further enhancement. A new LCCA model will be developed to assist the stakeholders to evaluate costs and investment decisions and reach optimum balance between financial viability and sustainability deliverables.
Resumo:
The issue of ensuring that construction projects achieve high quality outcomes continues to be an important consideration for key project stakeholders. Although a lot of quality practices have been done within the industry, establishment and achievement of reasonable levels of quality in construction projects continues to be a problem. While some studies into the introduction and development of quality practices and stakeholder management in the construction industry have been undertaken separately, no major studies have so far been completed that examine in depth how quality management practices that specifically address stakeholders’ perspectives of quality can be utilised to contribute to the ultimate constructed quality of projects. This paper encompasses and summarizes a review of the literature related to previous research undertaken on quality within the industry, focuses on the benefits and shortcomings, together with examining the concept of integrating stakeholder perspectives of project quality for improvement of outcomes throughout the project lifecycle. Findings discussed in this paper reveal a pressing need for investigation, development and testing of a framework to facilitate better implementation of quality management practices and thus achievement of better quality outcomes within the construction industry. The framework will incorporate and integrate the views of stakeholders on what constitutes final project quality to be utilised in developing better quality management planning and systems aimed ultimately at achieving better project quality delivery.
Resumo:
Our aim is to develop a set of leading performance indicators to enable managers of large projects to forecast during project execution how various stakeholders will perceive success months or even years into the operation of the output. Large projects have many stakeholders who have different objectives for the project, its output, and the business objectives they will deliver. The output of a large project may have a lifetime that lasts for years, or even decades, and ultimate impacts that go beyond its immediate operation. How different stakeholders perceive success can change with time, and so the project manager needs leading performance indicators that go beyond the traditional triple constraint to forecast how key stakeholders will perceive success months or even years later. In this article, we develop a model for project success that identifies how project stakeholders might perceive success in the months and years following a project. We identify success or failure factors that will facilitate or mitigate against achievement of those success criteria, and a set of potential leading performance indicators that forecast how stakeholders will perceive success during the life of the project's output. We conducted a scale development study with 152 managers of large projects and identified two project success factor scales and seven stakeholder satisfaction scales that can be used by project managers to predict stakeholder satisfaction on projects and so may be used by the managers of large projects for the basis of project control.
Resumo:
It is reasonable to expect that Islamic project financing may be a suitable option of infrastructure financing in Indonesia. This research explored the conditions necessary for the implementation of Islamic project financing for Indonesian infrastructure development. It is important that all infrastructure project stakeholders understand the concept comprehensively. This study identified reforms through which the government could more directly support the implementation of Islamic project financing. This research has led to the realisation that Islamic project financing can be implemented in all sectors, in both public and private sector domains, and across Muslim and non-Muslim communities.
Resumo:
Having a clear project definition is crucial for successful construction projects. It affects design quality, project communication between stakeholders and final project performance in terms of cost, schedule and quality. This study examines the relationship between project definition and final project performance through a structural equation model comprising 4 latent constructs and 6 path hypotheses using data from a questionnaire survey of 120 general contractors in the Malaysian construction industry. The results show that in the study population, all three items impact the project performance, but the link between design quality and project performance is indirect. Instead, the clarity of project definition affects project performance indirectly through design quality and project communication and design quality affects project performance indirectly through project communication. The primary contribution is to provide quantitative confirmation of the more general statements made in the literature from around the world and therefore adds to and consolidates existing knowledge. Practical implications derived from the finding are also proposed for various project stakeholders. Furthermore, as lack of the clarity of project definition is a very common occurrence in construction projects globally, these findings have important ramifications for all construction projects in expanding and clarifying existing knowledge on what is needed for the successful delivery of construction projects.
Resumo:
Hospitals represent complex and difficult contexts for AEC (architecture, engineering and construction) professionals to engage with due to their functional complexity and diversity of stakeholder interests (i.e. patient, visitor, medical specialist). Hospital designers need to take note of changing NHS policy contexts (e.g. the possible empowerment of general practitioners to shape services), technological advances in medical equipment design and the potential health needs of future generations. It is imperative for hospital designers and architects to align their processes and methodologies (e.g. briefing and requirements capture) to the needs and desires of their clients so that a medical facility design is produced which is truly aligned to the requirements of the hospital stakeholders. Semiotics, the “study” or “discipline” of signs aims to investigate the nature of signs (their inception, representation and meaning), whilst semiotics-rooted theories are concerned with investigating how meaning and understanding is mobilized between persons and between organisations. This paper details a semiotics-rooted research approach for investigating the interactions between hospital designers and stakeholders on a forthcoming NHS hospital project in the UK. A semiotics grounded study will potentially provide a deeper understanding of how meaning and understanding is established between hospital project stakeholders and construction professionals.
Resumo:
The global marketplace is rapidly intensifying. Longer product sales lives, greater profit margins or simply survival, is dependent on management¿s ability to create and lead change. Project Management has become an important competency, combined with other business practices to adapt to the trend of changing conditions. Critical Chain is a relatively new project methodology, elaborated by Eliyahu Goldratt in order to complete projects faster, make more efficient use of resources and securing the project deliverables. The methodology is based on the assumption that traditional project techniques such as CPM and PERT, do not recognize critical human behavior. The methodology claims that many project failures are a direct result of how safety is built into the task delivery times, and then wasted by human behavior such as Student Syndrome, Parkinson Law and Multitasking. However, there has been little or no previous research regarding this topic in the Argentine marketplace. This study intended to investigate to what extent the human behavior concepts of critical chain project management are present, by performing in-depth interviews with Argentine project stakeholders. It appears that the four human behavior concepts are present in Argentina and that the majority of Argentine companies are yet to apply project management techniques.
Resumo:
Time, cost and quality achievements on large-scale construction projects are uncertain because of technological constraints, involvement of many stakeholders, long durations, large capital requirements and improper scope definitions. Projects that are exposed to such an uncertain environment can effectively be managed with the application of risk management throughout the project life cycle. Risk is by nature subjective. However, managing risk subjectively poses the danger of non-achievement of project goals. Moreover, risk analysis of the overall project also poses the danger of developing inappropriate responses. This article demonstrates a quantitative approach to construction risk management through an analytic hierarchy process (AHP) and decision tree analysis. The entire project is classified to form a few work packages. With the involvement of project stakeholders, risky work packages are identified. As all the risk factors are identified, their effects are quantified by determining probability (using AHP) and severity (guess estimate). Various alternative responses are generated, listing the cost implications of mitigating the quantified risks. The expected monetary values are derived for each alternative in a decision tree framework and subsequent probability analysis helps to make the right decision in managing risks. In this article, the entire methodology is explained by using a case application of a cross-country petroleum pipeline project in India. The case study demonstrates the project management effectiveness of using AHP and DTA.
Resumo:
For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.