848 resultados para production control
Resumo:
A solution for the problem of reusability of software system for batch production systems is proposed. It is based on ISA S88 standard that prescribes the abstraction of elements in the manufacturing system that is equipment, processes and procedures abstraction, required to make a product batch. An easy to apply data scheme, compatible with the standard, is developed for management of production information. In addition to flexibility provided by the S88 standard, software system reusability requires a solution supporting manufacturing equipment reconfigurability. Toward this end a coupling mechanism is developed. A software tool, including these solutions, was developed and validated at laboratory level, using product manufacturing information of an actual plant.
Resumo:
"Parts II and III available only from the National Archives and Records Service, Washington 25, D.C."
Resumo:
"BX-240."
Resumo:
Mode of access: Internet.
Resumo:
Bibliography: p. 281-284.
Resumo:
Computerised production control developments have concentrated on Manufacturing Resources Planning (MRP II) systems. The literature suggests however, that despite the massive investment in hardware, software and management education, successful implementation of such systems in manufacturing industries has proved difficult. This thesis reviews the development of production planning and control systems, in particular, investigates the causes of failures in implementing MRP/MRP II systems in industrial environments and argues that the centralised and top-down planning structure, as well as the routine operational methodology of such systems, is inherently prone to failure. The thesis reviews the control benefits of cellular manufacturing systems but concludes that in more dynamic manufacturing environments, techniques such as Kanban are inappropriate. The basic shortcomings of MRP II systems are highlighted and a new enhanced operational methodology based on distributed planning and control principles is introduced. Distributed Manufacturing Resources Planning (DMRP), was developed as a capacity sensitive production planning and control solution for cellular manufacturing environments. The system utilises cell based, independently operated MRP II systems, integrated into a plant-wide control system through a Local Area Network. The potential benefits of adopting the system in industrial environments is discussed and the results of computer simulation experiments to compare the performance of the DMRP system against the conventional MRP II systems presented. DMRP methodology is shown to offer significant potential advantages which include ease of implementation, cost effectiveness, capacity sensitivity, shorter manufacturing lead times, lower working in progress levels and improved customer service.
Resumo:
This thesis deals with the problems associated with the planning and control of production, with particular reference to a small aluminium die casting company. The main problem areas were identified as: (a) A need to be able to forecast the customers demands upon the company's facilities. (b) A need to produce a manufacturing programme in which the output of the foundry (or die casting section) was balanced with the available capacity in the machine shop. (c) The need to ensure that the resultant system enabled the company's operating budget to have a reasonable chance of being achieved. At the commencement of the research work the major customers were members of the automobile industry and had their own system of forecasting, from which they issued manufacturing schedules to their component suppliers, The errors in the forecast were analysed and the distributions noted. Using these distributions the customer's forecast was capable of being modified to enable his final demand to be met with a known degree of confidence. Before a manufacturing programme could be developed the actual manufacturing system had to be reviewed and it was found that as with many small companies there was a remarkable lack of formal control and written data. Relevant data with regards to the component and the manufacturing process had therefore to be collected and analysed. The foundry process was fixed but the secondary machining operations were analysed by a technique similar to Component Flow Analysis and as a result the machines were arranged in a series of flow lines. A system of manual production control was proposed and for comparison, a local computer bureau was approached and a system proposed incorporating the production of additional management information. These systems are compared and the relative merits discussed and a proposal made for implementation.
Resumo:
This paper presents a development of decision support systems for solving scheduling problems. It consists of two parts — the first describing the production processes which can be handled by the system and the second describing how the system works.
Resumo:
Currently, timed ovulation induction and timed artificial insemination (TAI) can be performed in buffalo using GnRH or estradiol plus progesterone/progestin (P4)-releasing devices and prostaglandin F-2 alpha (PGF(2 alpha)). The control of the emergence of follicular waves and of ovulation at predetermined times, without the need for estrus detection, has facilitated the management and improved the efficiency of AI programs in buffalo during the breeding and nonbreeding season. Multiple ovulations, embryo transfer, ovum collection and in vitro embryo production have been shown to be feasible in buffalo, although low efficiency and limited commercial application of these techniques have been documented as well. These results could be associated with low ovarian follicular pools, high levels of follicular atresia and failures of the oocyte to enter the oviduct after superstimulation of follicular growth. This review discusses a number of key points related to the manipulation of ovarian follicular growth to improve pregnancy rates following TAI and embryo transfer of in vivo- and in vitro-derived embryos in buffalo.
Resumo:
The aim of this paper is to describe the implementation of a new approach for the introduction of so called 'holonic manufacturing' principles into existing production control systems. Such an approach is intended to improve the reconfigurability of the control system to cope with the increasing requirements of production change. A conceptual architecture is described and implemented in a robot assembly cell to demonstrate that this approach can lead to a manufacturing control system which can adapt relatively simply to long-term change. A design methodology and migration strategy for achieving these solutions using conventional hardware is proposed to develop execution level of manufacturing control systems.
Resumo:
El presente proyecto consiste en el análisis y búsqueda de soluciones para el control de producción de la unidad de rodajes de la compañía CAF S.A. Para ello, se ha tenido que analizar procesos de producción, capturar requerimientos, desarrollar unas herramientas de control de producción temporales y elaborar una especificación de requisitos. Sin olvidar la gestión e interlocución con proveedores. Estas líneas de trabajo se encuentran descritas en esta memoria, junto con análisis de resultados, conclusiones y unas líneas futuras donde se seguirá trabajando.