835 resultados para post-occupancy evaluation
Resumo:
This paper explores the historical development of POE in order to provide a contextual backdrop to current discussions. This review provides a much needed discussion on the benefits and barriers facing POE which should enable designers, facility managers and building users to appreciate the value and purpose of this important building evaluation process. The paper will encourage architects and building owners to conduct POEs to benefit all stakeholders and future designs. This is an international peer reviewed journal.
Resumo:
A combined windcatcher and light pipe (SunCatcher) was installed in the seminar room at the University of Reading, UK. Monitoring of indoor environment in real weather conditions was conducted to evaluate the application of windcatchers for natural ventilation. In addition, a subjective occupancy survey was undertaken. External weather conditions and internal indoor air quality indicators were recorded. The “tracer-gas decay” method using SF6 was used to establish air change rate for various conditions. The results indicated that the ventilation rate achieved through the windcatcher depends on the difference between internal and external air temperatures, and on wind speed and direction, in agreement with other published work in the area. The indoor air quality parameters were found to be within acceptable levels when the windcatcher was in operation. The measured air change rate was between 1.5ac/h and 6.8ac/h. Occupants’ questionnaires showed 75 per cent satisfaction with the internal conditions and welcomed the installation of the systems in UK buildings.
Resumo:
This paper considers the relationship between value management and facilities management. The findings are particularly relevant to large client organisations which procure new buildings on a regular basis. It is argued that the maximum effectiveness of value management can only be achieved if it is used in conjunction with an ongoing commitment to post-occupancy evaluation. SMART value management is seen to provide the means of ensuring that an individual building design is in alignment with the client’s strategic property needs. However, it is also necessary to recognise that an organisation’s strategic property needs will continually be in a state of change. Consequentially, economic and functional under-performance can only be avoided by a regular performance audit of existing property stock in accordance with changing requirements. Such a policy will ensure ongoing competitiveness through organisational learning. While post-occupancy evaluation represents an obvious additional service to be provided by value management consultants, it is vital that the necessary additional skills are acquired. Process management skills and social science research techniques are clearly important. However, there is also a need to improve mechanisms for data manipulation. Success can only be achieved if equal attention is given to issues of process, structure and content.
Resumo:
Existing buildings contribute greatly to global energy use and greenhouse gas emissions. In the UK, about 18% of carbon emissions are generated by non-domestic buildings; sustainable building refurbishment can play an important role in reducing carbon emissions. This paper looks at the performance of a recently refurbished 5-storey office building in London, in terms of energy consumption as well as occupants’ satisfaction. Pre- and post-occupancy evaluation studies were conducted using online questionnaire surveys and energy consumption evaluation. Results from pre-occupancy and post-occupancy evaluation studies showed that employees, in general, were more satisfied with their work environment at the refurbished building than with that of their previous office. Employees’ self-reported productivity improved after the move to Elms House. These surveys showed a positive relationship between employees’ satisfaction with their work environment and their self-reported productivity, well-being and enjoyment at work. The factor that contributed to increasing employee satisfaction the most was: better use of interior space. Although the refurbishment was a success in terms of reducing energy consumption per m2, the performance gap was almost 3 times greater than that estimated. Unregulated loads, problems with building control, ineffective use of space and occupants’ behaviour are argued to be reasons for this gap.
Resumo:
The international focus on embracing daylighting for energy efficient lighting purposes and the corporate sector’s indulgence in the perception of workplace and work practice “transparency” has spurned an increase in highly glazed commercial buildings. This in turn has renewed issues of visual comfort and daylight-derived glare for occupants. In order to ascertain evidence, or predict risk, of these events; appraisals of these complex visual environments require detailed information on the luminances present in an occupant’s field of view. Conventional luminance meters are an expensive and time consuming method of achieving these results. To create a luminance map of an occupant’s visual field using such a meter requires too many individual measurements to be a practical measurement technique. The application of digital cameras as luminance measurement devices has solved this problem. With high dynamic range imaging, a single digital image can be created to provide luminances on a pixel-by-pixel level within the broad field of view afforded by a fish-eye lens: virtually replicating an occupant’s visual field and providing rapid yet detailed luminance information for the entire scene. With proper calibration, relatively inexpensive digital cameras can be successfully applied to the task of luminance measurements, placing them in the realm of tools that any lighting professional should own. This paper discusses how a digital camera can become a luminance measurement device and then presents an analysis of results obtained from post occupancy measurements from building assessments conducted by the Mobile Architecture Built Environment Laboratory (MABEL) project. This discussion leads to the important realisation that the placement of such tools in the hands of lighting professionals internationally will provide new opportunities for the lighting community in terms of research on critical issues in lighting such as daylight glare and visual quality and comfort.
Resumo:
Glare indices have yet to be extensively tested in daylit open plan offices, as such there is no effective method to predict discomfort glare within these spaces. This study into discomfort glare in open plan green buildings targeted full-time employees, working under their everyday lighting conditions. Three green buildings in Brisbane were used for data collection, two were Green Star accredited and the other contained innovative daylighting strategies. Data were collected on full-time employees, mostly aged between 30 and 50 years, who broadly reflect the demographics of the wider working population in Australia. It was discovered 36 of the 64 respondents experienced discomfort from both electric and daylight sources at their workspace. The study used a specially tailored post-occupancy evaluation (POE) survey to help assess discomfort glare. Luminance maps extracted from High Dynamic Range (HDR) images were used to capture the luminous environment of the occupants. These were analysed using participant data and the program Evalglare. The physical results indicated no correlation with other developed glare metrics for daylight within these open plan green buildings, including the recently developed Daylight Glare Probability (DGP) Index. The strong influence of vertical illuminance, Ev in the DGP precludes the mostly contrast-based glare from windows observed in this investigation from forming a significant part of this index. Furthermore, critical assessment of the survey techniques used are considered. These will provide insight for further research into discomfort glare in the endeavour to fully develop a suitable glare metric.
Resumo:
It is generally accepted that the physical workplace environment affects employees’ satisfaction and, consequently, their perceived productivity and well-being. This study investigated whether employee “satisfaction” variables can predict perceived productivity, well-being and enjoyment at work, and if so, to what extent. The study also explored whether limiting employees’ control over their environment could save energy without compromising employees’ satisfaction and perceived productivity. Preoccupancy and post-occupancy evaluation studies were conducted, in terms of both energy consumption and employee perceptions, to make comparisons between a company’s old and current headquarters buildings, both located in the same area of London. The results showed that employees were more satisfied with their work environment at their new HQ, in general, than with that of their previous office. Also, employees’ self-reported productivity, well-being and enjoyment at work improved after the move. It was revealed that the combination of employees’ level of satisfaction with “interior use of space” and “physical conditions” was the best predictor of their perceived productivity, while satisfaction with “indoor facilities” was not a good predictor. In terms of energy performance, although the new HQ’s energy consumption per m2 was significantly less than that of the previous building, there was still a gap between the refurbishment design target and the actual performance of the building. The findings suggest that this gap could be due to a number of factors, including an ineffective use of interior space, and occupants’ behaviour.
Resumo:
Recent research has shown large differences between the expected and the actual energy consumption in buildings. The differences have been attributed partially, to the assumptions made during the design phase of buildings when simulation methods are employed. More accurate occupancy profiles on building operation could help to carry out more precise building performance calculations. This study focuses on the post-occupancy evaluation of two apartments, one renovated and one non renovated, in Madrid within the same building complex. The aim of this paper is to present an application of the mixed-methods methodology (Creswell, 2007) to assess thermal comfort and occupancy practices used in the case studies, and to discuss the shortcomings and opportunities associated with it. The mixed-methods methodology offers strategies for integrating qualitative and quantitative methods to investigate complex phenomena. This approach is expected to contribute to the growing knowledge of occupants’ behaviour and building performance by explaining the differences observed between energy consumption and thermal comfort in relation to people’s saving and comfort practices and the related experiences, preferences and values.