993 resultados para performance specification


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Political drivers such as the Kyoto protocol, the EU Energy Performance of Buildings Directive and the Energy end use and Services Directive have been implemented in response to an identified need for a reduction in human related CO2 emissions. Buildings account for a significant portion of global CO2 emissions, approximately 25-30%, and it is widely acknowledged by industry and research organisations that they operate inefficiently. In parallel, unsatisfactory indoor environmental conditions have proven to negatively impact occupant productivity. Legislative drivers and client education are seen as the key motivating factors for an improvement in the holistic environmental and energy performance of a building. A symbiotic relationship exists between building indoor environmental conditions and building energy consumption. However traditional Building Management Systems and Energy Management Systems treat these separately. Conventional performance analysis compares building energy consumption with a previously recorded value or with the consumption of a similar building and does not recognise the fact that all buildings are unique. Therefore what is required is a new framework which incorporates performance comparison against a theoretical building specific ideal benchmark. Traditionally Energy Managers, who work at the operational level of organisations with respect to building performance, do not have access to ideal performance benchmark information and as a result cannot optimally operate buildings. This thesis systematically defines Holistic Environmental and Energy Management and specifies the Scenario Modelling Technique which in turn uses an ideal performance benchmark. The holistic technique uses quantified expressions of building performance and by doing so enables the profiled Energy Manager to visualise his actions and the downstream consequences of his actions in the context of overall building operation. The Ideal Building Framework facilitates the use of this technique by acting as a Building Life Cycle (BLC) data repository through which ideal building performance benchmarks are systematically structured and stored in parallel with actual performance data. The Ideal Building Framework utilises transformed data in the form of the Ideal Set of Performance Objectives and Metrics which are capable of defining the performance of any building at any stage of the BLC. It is proposed that the union of Scenario Models for an individual building would result in a building specific Combination of Performance Metrics which would in turn be stored in the BLC data repository. The Ideal Data Set underpins the Ideal Set of Performance Objectives and Metrics and is the set of measurements required to monitor the performance of the Ideal Building. A Model View describes the unique building specific data relevant to a particular project stakeholder. The energy management data and information exchange requirements that underlie a Model View implementation are detailed and incorporate traditional and proposed energy management. This thesis also specifies the Model View Methodology which complements the Ideal Building Framework. The developed Model View and Rule Set methodology process utilises stakeholder specific rule sets to define stakeholder pertinent environmental and energy performance data. This generic process further enables each stakeholder to define the resolution of data desired. For example, basic, intermediate or detailed. The Model View methodology is applicable for all project stakeholders, each requiring its own customised rule set. Two rule sets are defined in detail, the Energy Manager rule set and the LEED Accreditor rule set. This particular measurement generation process accompanied by defined View would filter and expedite data access for all stakeholders involved in building performance. Information presentation is critical for effective use of the data provided by the Ideal Building Framework and the Energy Management View definition. The specifications for a customised Information Delivery Tool account for the established profile of Energy Managers and best practice user interface design. Components of the developed tool could also be used by Facility Managers working at the tactical and strategic levels of organisations. Informed decision making is made possible through specified decision assistance processes which incorporate the Scenario Modelling and Benchmarking techniques, the Ideal Building Framework, the Energy Manager Model View, the Information Delivery Tool and the established profile of Energy Managers. The Model View and Rule Set Methodology is effectively demonstrated on an appropriate mixed use existing ‘green’ building, the Environmental Research Institute at University College Cork, using the Energy Management and LEED rule sets. Informed Decision Making is also demonstrated using a prototype scenario for the demonstration building.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper deals with product performance and specification in new product development. There are many different definitions of performance and specification in the literature. These are reviewed and a new classification scheme for product performance is proposed. The link between performance and specification is discussed in detail using a new model for the new product development process. The new model involves two stages, with each containing three main phases, and is useful for making decisions with regards to product performance and specification.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Best concrete research paper by a student - Research has shown that the cost of managing structures puts high strain on the infrastructure budget, with
estimates of over 50% of the European construction budget being dedicated to repair and maintenance. If reinforced concrete
structures are not suitably designed and adequately maintained, their service life is compromised, resulting in the full economic
value of the investment not realised. The issue is more prevalent in coastal structures as a result of combinations of aggressive
actions, such as those caused by chlorides, sulphates and cyclic freezing and thawing.
It is a common practice nowadays to ensure durability of reinforced concrete structures by specifying a concrete mix and a
nominal cover at the design stage to cater for the exposure environment. This in theory should produce the performance required
to achieve a specified service life. Although the European Standard EN 206-1 specifies variations in the exposure environment,
it does not take into account the macro and micro climates surrounding structures, which have a significant influence on their
performance and service life. Therefore, in order to construct structures which will perform satisfactorily in different exposure
environments, the following two aspects need to be developed: a performance based specification to supplement EN 206-1
which will outline the expected performance of the structure in a given environment; and a simple yet transferrable procedure
for assessing the performance of structures in service termed KPI Theory. This will allow the asset managers not only to design
structures for the intended service life, but also to take informed maintenance decisions should the performance in service fall
short of what was specified. This paper aims to discuss this further.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Traditional high speed machinery actuators are powered and coordinated by mechanical linkages driven from a central drive, but these linkages may be replaced by independently synchronised electric drives. Problems associated with utilising such electric drives for this form of machinery were investigated. The research concentrated on a high speed rod-making machine, which required control of high inertias (0.01-0.5kgm2), at continuous high speed (2500 r/min), with low relative phase errors between two drives (0.0025 radians). Traditional minimum energy drive selection techniques for incremental motions were not applicable to continuous applications which require negligible energy dissipation. New selection techniques were developed. A brushless configuration constant enabled the comparison between seven different servo systems; the rate earth brushless drives had the best power rates which is a performance measure. Simulation was used to review control strategies, such that a microprocessor controller with a proportional velocity loop within a proportional position loop with velocity feedforward was designed. Local control schemes were investigated as means of reducing relative errors between drives: the slave of a master/slave scheme compensates for the master's errors: the matched scheme has drives with similar absolute errors so the relative error is minimised, and the feedforward scheme minimises error by adding compensation from previous knowledge. Simulation gave an approximate velocity loop bandwidth and position loop gain required to meet the specification. Theoretical limits for these parameters were defined in terms of digital sampling delays, quantisation, and system phase shifts. Performance degradation due to mechanical backlash was evaluated. Thus any drive could be checked to ensure that the performance specification could be realised. A two drive demonstrator was commissioned with 0.01kgm2 loads. By use of simulation the performance of one drive was improved by increasing the velocity loop bandwidth fourfold. With the master/slave scheme relative errors were within 0.0024 radians at a constant 2500 r/min for two 0.01 kgm^2 loads.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The unmitigated transmission of undesirable vibration can result in problems by way of causing human discomfort, machinery and equipment failure, and affecting the quality of a manufacturing process. When identifiable transmission paths are discernible, vibrations from the source can be isolated from the rest of the system and this prevents or minimises the problems. The approach proposed here for vibration isolation is active force cancellation at points close to the vibration source. It uses force feedback for multiple-input and multiple-output control at the mounting locations. This is particularly attractive for rigid mounting of machine on relative flexible base where machine alignment and motions are to be restricted. The force transfer function matrix is used as a disturbance rejection performance specification for the design of MIMO controllers. For machine soft-mounted via flexible isolators, a model for this matrix has been derived. Under certain conditions, a simple multiplicative uncertainty model is obtained that shows the amount of perturbation a flexible base has on the machine-isolator-rigid base transmissibility matrix. Such a model is very suitable for use with robust control design paradigm. A different model is derived for the machine on hard-mounts without the flexible isolators. With this model, the level of force transmitted from a machine to a final mounting structure using the measurements for the machine running on another mounting structure can be determined. The two mounting structures have dissimilar dynamic characteristics. Experiments have verified the usefulness of the expression. The model compares well with other methods in the literature. The disadvantage lies with the large amount of data that has to be collected. Active force cancellation is demonstrated on an experimental rig using an AC industrial motor hard-mounted onto a relative flexible structure. The force transfer function matrix, determined from measurements, is used to design H and Static Output Feedback controllers. Both types of controllers are stable and robust to modelling errors within the identified frequency range. They reduce the RMS of transmitted force by between 30?80% at all mounting locations for machine running at 1340 rpm. At the rated speed of 1440 rpm only the static gain controller is able to provide 30?55% reduction at all locations. The H controllers on the other hand could only give a small reduction at one mount location. This is due in part to the deficient of the model used in the design. Higher frequency dynamics has been ignored in the model. This can be resolved by the use of a higher order model that can result in a high order controller. A low order static gain controller, with some tuning, performs better. But it lacks the analytical framework for analysis and design.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper describes the use of a formal optimisation procedure to optimise a plug-in hybrid electric bus using two different case studies to meet two different performance criteria; minimum journey cost and maximum battery life. The approach is to choose a commercially available vehicle and seek to improve its performance by varying key design parameters. Central to this approach is the ability to develop a representative backward facing model of the vehicle in MATLAB/Simulink along with appropriate optimisation objective and penalty functions. The penalty functions being the margin by which a particular design fails to meet the performance specification. The model is validated against data collected from an actual vehicle and is used to estimate the vehicle performance parameters in a model-in-the-loop process within an optimisation routine. For the purposes of this paper, the journey cost/battery life over a drive cycle is optimised whilst other performance indices are met (or exceeded). Among the available optimisation methods, Powell's method and Simulated Annealing are adopted. The results show this method as a valid alternative modelling approach to vehicle powertrain optimisation. © 2012 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This chapter presents an overview on several performance-based approaches for concrete durability specification and conformity assessment of the as-built structure.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The integral variability of raw materials, lack of awareness and appreciation of the technologies for achieving quality control and lack of appreciation of the micro and macro environmental conditions that the structures will be subjected, makes modern day concreting a challenge. This also makes Designers and Engineers adhere more closely to prescriptive standards developed for relatively less aggressive environments. The data from exposure sites and real structures prove, categorically, that the prescriptive specifications are inadequate for chloride environments. In light of this shortcoming, a more pragmatic approach would be to adopt performance-based specifications which are familiar to industry in the form of specification for mechanical strength. A recently completed RILEM technical committee made significant advances in making such an approach feasible.
Furthering a performance-based specification requires establishment of reliable laboratory and on-site test methods, as well as easy to perform service-life models. This article highlights both laboratory and on-site test methods for chloride diffusivity/electrical resistivity and the relationship between these tests for a range of concretes. Further, a performance-based approach using an on-site diffusivity test is outlined that can provide an easier to apply/adopt practice for Engineers and asset managers for specifying/testing concrete structures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We evaluate the performance of several specification tests for Markov regime-switching time-series models. We consider the Lagrange multiplier (LM) and dynamic specification tests of Hamilton (1996) and Ljung–Box tests based on both the generalized residual and a standard-normal residual constructed using the Rosenblatt transformation. The size and power of the tests are studied using Monte Carlo experiments. We find that the LM tests have the best size and power properties. The Ljung–Box tests exhibit slight size distortions, though tests based on the Rosenblatt transformation perform better than the generalized residual-based tests. The tests exhibit impressive power to detect both autocorrelation and autoregressive conditional heteroscedasticity (ARCH). The tests are illustrated with a Markov-switching generalized ARCH (GARCH) model fitted to the US dollar–British pound exchange rate, with the finding that both autocorrelation and GARCH effects are needed to adequately fit the data.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Performance based planning is a form of planning regulation that is not well understood and the theoretical advantages of this type of planning are rarely achieved in practice. Normatively, this type of regulation relies on performance standards that are quantifiable and technically based which are designed to manage the effects of development, where performance standards provide certainty in respect of the level of performance and the means of achievement is flexible. Few empirical studies have attempted to examine how performance based planning has been conceptualised and implemented in practice. Existing literature is predominately anecdotal and consultant based (Baker et al. 2006) and has not sought to quantitatively examine how land use has been managed or determine how context influences implementation. The Integrated Planning Act 1997 (IPA) operated as Queensland’s principal planning legislation between March 1998 and December 2009. The IPA prevented Local Governments from prohibiting development or use and the term zone was absent from the legislation. While the IPA did not use the term performance based planning, the system is widely considered to be performance based in practice (e.g. Baker et al. 2006; Steele 2009a, 2009b). However, the degree to which the IPA and the planning system in Queensland is performance based is debated (e.g. Yearbury 1998; England 2004). Four research questions guided the research framework using Queensland as the case study. The questions sought to: determine if there is a common understanding of performance based planning; identify how performance based planning was expressed under the IPA; understand how performance based planning was implemented in plans; and explore the experiences of participants in the planning system. The research developed a performance adoption spectrum. The spectrum describes how performance based planning is implemented, ranging between pure and hybrid interpretations. An ex-post evaluation of seventeen IPA plans sought to determine plan performativity within the conceptual spectrum. Land use was examined from the procedural dimension of performance (Assessment Tables) and the substantive dimension of performance (Codes). A documentary analysis and forty one interviews supplemented the research. The analytical framework considered how context influenced performance based planning, including whether: the location of the local government affected land use management techniques; temporal variation in implementation exists; plan-making guidelines affected implementation; different perceptions of the concept exist; this type of planning applies to a range of spatial scales. Outcomes were viewed as the medium for determining the acceptability of development in Queensland, a significant departure from pure approaches found in the United States. Interviews highlighted the absence of plan-making direction in the IPA, which contributed to the confusion about the intended direction of the planning system and the myth that the IPA would guarantee a performance based system. A hybridised form of performance based planning evolved in Queensland which was dependent on prescriptive land use zones and specification of land use type, with some local governments going to extreme lengths to discourage certain activities in a predetermined manner. Context had varying degrees of influence on plan-making methods. Decision-making was found to be inconsistent and the system created a range of unforeseen consequences including difficulties associated with land valuation, increased development speculation, and the role of planners in court was found to be less critical than in the previous planning system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article explores an important temporal aspect of the design of strategic alliances by focusing on the issue of time bounds specification. Time bounds specification refers to a choice on behalf of prospective alliance partners at the time of alliance formation to either pre-specify the duration of an alliance to a specific time window, or to keep the alliance open-ended (Reuer & Ariňo, 2007). For instance, Das (2006) mentions the example of the alliance between Telemundo Network and Mexican Argos Comunicacion (MAC). Announced in October 2000, this alliance entailed a joint production of 1200 hours of comedy, news, drama, reality and novella programs (Das, 2006). Conditioned on the projected date of completing the 1200 hours of programs, Telemundo Network and MAC pre-specified the time bounds of the alliance ex ante. Such time-bound alliances are said to be particularly prevalent in project-based industries, like movie production, construction, telecommunications and pharmaceuticals (Schwab & Miner, 2008). In many other instances, however, firms may choose to keep their alliances open-ended, not specifying a specific time bound at the time of alliance formation. The choice between designing open-ended alliances that are “built to last”, versus time bound alliances that are “meant to end” is important. Seminal works like Axelrod (1984), Heide & Miner (1992), and Parkhe (1993) demonstrated that the choice to place temporal bounds on a collaborative venture has important implications. More specifically, collaborations that have explicit, short term time bounds (i.e. what is termed a shorter “shadow of the future”) are more likely to experience opportunism (Axelrod, 1984), are more likely to focus on the immediate present (Bakker, Boros, Kenis & Oerlemans, 2012), and are less likely to develop trust (Parkhe, 1993) than alliances for which time bounds are kept indeterminate. These factors, in turn, have been shown to have important implications for the performance of alliances (e.g. Kale, Singh & Perlmutter, 2000). Thus, there seems to be a strong incentive for organizations to form open-ended strategic alliances. And yet, Reuer & Ariňo (2007), one of few empirical studies that details the prevalence of time-bound and open-ended strategic alliances, found that about half (47%) of the alliances in their sample were time bound, the other half were open-ended. What conditions, then, determine this choice?