937 resultados para passenger trains


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The paper investigates train scheduling problems when prioritised trains and non-prioritised trains are simultaneously traversed in a single-line rail network. In this case, no-wait conditions arise because the prioritised trains such as express passenger trains should traverse continuously without any interruption. In comparison, non-prioritised trains such as freight trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available, which is thought of as a relaxation of no-wait conditions. With thorough analysis of the structural properties of the No-Wait Blocking Parallel-Machine Job-Shop-Scheduling (NWBPMJSS) problem that is originated in this research, an innovative generic constructive algorithm (called NWBPMJSS_Liu-Kozan) is proposed to construct the feasible train timetable in terms of a given order of trains. In particular, the proposed NWBPMJSS_Liu-Kozan constructive algorithm comprises several recursively-used sub-algorithms (i.e. Best-Starting-Time-Determination Procedure, Blocking-Time-Determination Procedure, Conflict-Checking Procedure, Conflict-Eliminating Procedure, Tune-up Procedure and Fine-tune Procedure) to guarantee feasibility by satisfying the blocking, no-wait, deadlock-free and conflict-free constraints. A two-stage hybrid heuristic algorithm (NWBPMJSS_Liu-Kozan-BIH) is developed by combining the NWBPMJSS_Liu-Kozan constructive algorithm and the Best-Insertion-Heuristic (BIH) algorithm to find the preferable train schedule in an efficient and economical way. Extensive computational experiments show that the proposed methodology is promising because it can be applied as a standard and fundamental toolbox for identifying, analysing, modelling and solving real-world scheduling problems.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In this paper, a three-dimensional nonlinear rigid body model has been developed for the investigation of the crashworthiness of a passenger train using the multibody dynamics approach. This model refers to a typical design of passenger cars and train constructs commonly used in Australia. The high-energy and low-energy crush zones of the cars and the train constructs are assumed and the data are explicitly provided in the paper. The crash scenario is limited to the train colliding on to a fixed barrier symmetrically. The simulations of a single car show that this initial design is only applicable for the crash speed of 35 km/h or lower. For higher speeds (e.g. 140 km/h), the crush lengths or crush forces or both the crush zone elements will have to be enlarged. It is generally better to increase the crush length than the crush force in order to retain the low levels of the longitudinal deceleration of the passenger cars.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Trains in Latin America and the Caribbean mainly serve as a means of mass transit, bearing passengers along local and suburban routes of cities and transporting freight beyond. Non-urban passenger trains almost disappeared during the last few decades of the twentieth century. In the new emerging markets, however, demand is based on the train itself or the scenery en route rather than a wish to arrive at a given station as in the past. The new tourist trains, which are often well-restored historical engines, are expensive to operate and their special characteristics make it difficult to integrate them with mass transit railway services. However, some may be profitable when run privately and others may have a social justification, based on the boost they can provide to economic development in the often isolated and relatively depressed areas where they tend to operate.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The reliability of urban passenger trains is a critical performance measure for passenger satisfaction and ultimately market share. A delay to one train in a peak period can have a severe effect on the schedule adherence of other trains. This paper presents an analytically based model to quantify the expected positive delay for individual passenger trains and track links in an urban rail network. The model specifically addresses direct delay to trains, knock-on delays to other trains, and delays at scheduled connections. A solution to the resultant system of equations is found using an iterative refinement algorithm. Model validation, which is carried out using a real-life suburban train network consisting of 157 trains, shows the model estimates to be on average within 8% of those obtained from a large scale simulation. Also discussed, is the application of the model to assess the consequences of increased scheduled slack time as well as investment strategies designed to reduce delay.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Lateral collisions between heavy road vehicles and passenger trains at level crossings and the associated derailments are serious safety issues. This paper presents a detailed investigation of the dynamic responses and derailment mechanisms of trains under lateral impact using a multi-body dynamics simulation method. Formulation of a three-dimensional dynamic model of a passenger train running on a ballasted track subject to lateral impact caused by a road truck is presented. This model is shown to predict derailment due to wheel climb and car body overturning mechanisms through numerical examples. Sensitivities of the truck speed and mass, wheel/rail friction and the train suspension to the lateral stability and derailment of the train are reported. It is shown that improvements to the design of train suspensions, including secondary and inter-vehicle lateral dampers have higher potential to mitigate the severity of the collision-induced derailments.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Derailments due to lateral collisions between heavy road vehicles and passenger trains at level crossings (LCs) are serious safety issues. A variety of countermeasures in terms of traffic laws, communication technology and warning devices are used for minimising LC accidents; however, innovative civil infrastructure solution is rare. This paper presents a study of the efficacy of guard rail system (GRS) to minimise the derailment potential of trains laterally collided by heavy road vehicles at LCs. For this purpose, a three-dimensional dynamic model of a passenger train running on a ballasted track fitted with guard rail subject to lateral impact caused by a road truck is formulated. This model is capable of predicting the lateral collision-induced derailments with and without GRS. Based on dynamic simulations, derailment prevention mechanism of the GRS is illustrated. Sensitivities of key parameters of the GRS, such as the flange way width, the installation height and contact friction, to the efficacy of GRS are reported. It is shown that guard rails can enhance derailment safety against lateral impacts at LCs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper focuses on the railway rolling stock circulation problem in rapid transit networks, in which frequencies are high and distances are relatively short. Although the distances are not very large, service times are high due to the large number of intermediate stops required to allow proper passenger flow. The main complicating issue is the fact that the available capacity at depot stations is very low, and both capacity and rolling stock are shared between different train lines. This forces the introduction of empty train movements and rotation maneuvers, to ensure sufficient station capacity and rolling stock availability. However, these shunting operations may sometimes be difficult to perform and can easily malfunction, causing localized incidents that could propagate throughout the entire network due to cascading effects. This type of operation will be penalized with the goal of selectively avoiding them and ameliorating their high malfunction probabilities. Critic trains, defined as train services that come through stations that have a large number of passengers arriving at the platform during rush hours, are also introduced. We illustrate our model using computational experiments drawn from RENFE (the main Spanish operator of suburban passenger trains) in Madrid, Spain. The results of the model, achieved in approximately 1 min, have been received positively by RENFE planners

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The aim of this paper is to propose an integrated planning model to adequate the offered capacity and system frequencies to attend the increased passenger demand and traffic congestion around urban and suburban areas. The railway capacity is studied in line planning, however, these planned frequencies were obtained without accounting for rolling stock flows through the rapid transit network. In order to provide the problem more freedom to decide rolling stock flows and therefore better adjusting these flows to passenger demand, a new integrated model is proposed, where frequencies are readjusted. Then, the railway timetable and rolling stock assignment are also calculated, where shunting operations are taken into account. These operations may sometimes malfunction, causing localized incidents that could propagate throughout the entire network due to cascading effects. This type of operations will be penalized with the goal of selectively avoiding them and ameliorating their high malfunction probabilities. Swapping operations will also be ensured using homogeneous rolling stock material and ensuring parkings in strategic stations. We illustrate our model using computational experiments drawn from RENFE (the main Spanish operator of suburban passenger trains) in Madrid, Spain. The results show that through this integrated approach a greater robustness degree can be obtained

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A via permanente representa um elemento imprescindível na composição do transporte ferroviário e seu desempenho deve ser adequado, de forma a garantir tanto segurança quanto conforto. Assim, diversos aspectos devem ser analisados ainda na fase de projeto, através de dimensionamentos que confrontem diferentes parâmetros da resposta da via e os limites estabelecidos. Dessa forma, o conhecimento do comportamento mecânico da via, devido aos esforços impostos pela passagem do material rodante, passa a ser essencial no projeto de uma estrutura que garanta os requisitos necessários, sem ser inviável economicamente. Visto que esse comportamento mecânico é muito sensível à rigidez vertical da estrutura, o presente trabalho apresenta análises da influência desse parâmetro na resposta da via e, consequentemente, no seu dimensionamento. Nesse contexto, o trabalho abrange tanto o caso de vias em lastro solicitadas por trens de carga, quanto o caso de vias em laje solicitadas por trens de passageiros em meios urbanos. No primeiro caso são realizados estudos paramétricos, por meio de modelos clássicos e um modelo mecanicista, para a análise de momentos fletores e deflexões nos trilhos, bem como tensões verticais nas camadas de lastro, sub-lastro e subleito. Já no segundo caso, são realizados estudos paramétricos relativos à transmissibilidade e à atenuação de vibrações causadoras de ruído secundário. Também é feita uma análise da influência da rigidez vertical na amplificação dinâmica das cargas estáticas, que pode ser aplicada a ambos os casos citados e até extrapolada para casos de vias de alta velocidade. Os resultados mostraram que aumentos de rigidez vertical resultam em ganhos do ponto de vista de momentos fletores e deflexões nos trilhos, além de maior resistência e capacidade de dissipação de tensões verticais nas camadas de lastro, sub-lastro e subleito. Por outro lado, esses aumentos também levaram a maiores tensões nas camadas subjacentes à grade citadas, além de atenuações de vibrações em menores intervalos de frequência e maiores amplificações dinâmicas das cargas estáticas em vias de alta velocidade. Assim, é mostrado que a influência da rigidez vertical, tanto da via como um todo quanto de alguns elementos específicos, não deve ser analisada de forma genérica, pois, dependendo do parâmetro da resposta da via considerado no dimensionamento, seu aumento pode representar uma influência positiva ou negativa.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The implementation of the railway in Triângulo Mineiro and Alto Paranaíba helped to develop the area and connexion with other states: São Paulo, Goiás and Mato Grosso. The railway used to transport people and goods throughout many train stations in urban and rural areas and some major railroad complexes. There were many factors that led to the decline and abandonment of these properties: governmental policies which were in favour of road transportation and automotive industry, the replacement of the steam locomotive for electric and electric-diesel locomotives, changing part of the railway plan, removal of railways and loss of function of the buildings, extinction of passenger trains, which led the stations to lose its main purpose: people transport. 53% of the stations built inside the study area were demolished and most of them are in rural areas. There are several situations: stations on a precarious conservation state, most of them in the city s rural area, stations being used in urban and rural areas with new uses, stations working with cargo and goods transportation. The stations in Triângulo Mineiro and Alto Paranaíba area in Minas Gerais are the object of this dissertation, wherein the main interest lies on the stations that are in operation, 21 buildings, seeking to verify their conservation state, their agents and role in preserving the train memory. Maps, charts and tables were made for this collection s understanding, having visited the stations that are listed by the cultural heritage and the ones that are in operation with new functions. Field records were made allowing the understanding of these properties in operation. It is observed that only the buildings listing, despite ensuring the non-demolition, does not help on the use and preservation of these stations, because there are some buildings that have this protection level, but are abandoned and in disrepair. The use of these stations by a train company, operating with cargo and goods transportation do not also guarantee the buildings preservation, as they are not treated with any preservation interest, their maintenance are precarious. The using by these companies are various, however, only a few stations have internal spaces dedicated to the railroad memory. Most of the stations did not have preservation projects with architects and specialists participation and the major concern, during maintenance process, is on the building s external part. The stations conservation begins on the local government interest, that preserve these properties, most of them are in urban areas, the major challenge is on their using definition and occupancy, especially in the countryside, wherein the buildings uses must be sustainable, as regards the appreciation and management of this heritage.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Inscription: Verso: Barbara Hand, subway conductor, New York.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Routing trains within passenger stations in major cities is a common scheduling problem for railway operation. Various studies have been undertaken to derive and formulate solutions to this route allocation problem (RAP) which is particularly evident in mainland China nowadays because of the growing traffic demand and limited station capacity. A reasonable solution must be selected from a set of available RAP solutions attained in the planning stage to facilitate station operation. The selection is however based on the experience of the operators only and objective evaluation of the solutions is rarely addressed. In order to maximise the utilisation of station capacity while maintaining service quality and allowing for service disturbance, quantitative evaluation of RAP solutions is highly desirable. In this study, quantitative evaluation of RAP solutions is proposed and it is enabled by a set of indices covering infrastructure utilisation, buffer times and delay propagation. The proposed evaluation is carried out on a number of RAP solutions at a real-life busy railway station in mainland China and the results highlight the effectiveness of the indices in pinpointing the strengths and weaknesses of the solutions. This study provides the necessary platform to improve the RAP solution in planning and to allow train re-routing upon service disturbances.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis presents the results of a study into ways that technology can be appropriated and designed to support urban rail commuters in their daily journeys. The study evaluated a mobile application prototype deployed along the Brisbane passenger rail network. This prototype was designed to support social interaction between passengers sharing the same trains. This thesis provides a step forward in showing the relevance of increasingly creating solutions that contribute to a more enjoyable and attractive public transport service.