860 resultados para non-current asset
Resumo:
Commentators in the financial press claimed that the amendments to AASB 1010, Accounting for the Revaluation of Non-Current Assets, issued in September 1991, would have “disastrous” implications for the accounts of companies. This paper is concerned with whether the amendments did indeed affect asset write-down activities. An analysis of write-down practices of 75 Australian companies before and after the amendments were operative suggests that the commentators' judgment could have been hasty.
Resumo:
We investigate the association between asset revaluations of non-current assets and audit fees, using a sample of ASX 300 companies from the years 2003–2007.We report that there is a significant increase in the audit fees paid when non-financial assets (PPEs, investment properties and intangible assets) are measured at fair values. Moreover, we provide evidence that an independent valuer or appraiser significantly weakens the positive association between asset revaluations and audit fees. Furthermore, companies whose noncurrent assets are revalued upwards and those that revalue their non-current assets upwards every year have significantly higher audit fees. Additional tests provide empirical evidence that the strength of corporate governance has a moderating effect on the level of audit fees. This study contributes to the ongoing debate on the role of fair value accounting. The findings suggest agency costs associated with fair value estimates may offset the benefits from the use of fair value accounting.
Resumo:
The purpose of this paper is to study the profiling of property, plant and equipment (PPE) contributions in Australia and Malaysia construction companies. A company’s worth is usually based on the listed share price on the stock exchange. In arriving at the net profit, the contribution of PPE in the company’s assets is somehow being neglected. This paper will investigate the followings; firstly the level of PPE contribution in the construction firms by comparing the PPE contributions to the company’s asset as a whole which includes fixed (non-current) assets and current assets. This will determine the true strength of the companies, rather than relying on the share prices alone. Secondly, the paper will determine the trend of company’s asset ownership to show the company’s performance of the PPE ownership during the period of study. The data is based on the selected construction companies listed on the Australian Stock Exchange (ASX) and Malaysian Stock Exchange, known as Bursa Malaysia. The profiling will help to determine the strength of the construction firms based on the PPE holding, and the level of PPE ownerships in the two countries construction firms during the period of study.
Resumo:
This paper examines the association between asset revaluations and discretionary accruals (a proxy for earnings management) using a sample of the largest 300 Australian companies. The results from this study indicate that the revaluation of non-current assets is positively associated with discretionary accruals. This finding is consistent with the argument that revaluation of assets reflects higher agency problems in the form of increased earnings management. Additional findings are that discretionary accruals are higher for firms reporting their non-current assets at fair values appraised by directors, than those of firms that use external appraisers. As well, the choice of auditors and the strength of corporate governance can constrain the opportunistic behaviour of managers in the accounting choice to revalue non-current assets.
Resumo:
Plant and machinery valuation is important to every company.s annual financial reporting. It is reported under the non-current assets section, and the valuers are generally employed to provide the up to date valuation of the non-current assets valuation such as property, plant and equipment that can make up to 80% of the total assets of a company. The valuation of plant and machinery is also important for other purposes such as securing loan facilities, sales, takeover, insurance and auction. The application of 2005 International Financial Reporting Standard (IFRS) has a subsequent impact on the financial sector, as a whole. The accountants have to choose between the Historical Cost approach and Market Value approach in determining the value of the client.s assets. In Malaysia, the implementation of IFRS has a domino effect on the financial system, especially for plant and machinery valuation for financial reporting. The comparison data for plant and machinery valuation is limited unlike land and building valuation. The question of Malaysian valuer.s ability to comply with the IFRS standard keeps rising every day, not just to the accountants, but also other related parties such as financial institutions, government agencies and the clients. This is happening because of different interpretations of premise of value for plant and machinery, as well as methods been used and differences in standards of reporting among the valuers conducting plant and machinery valuation. The root of the problem lies in the lack of practical guidelines governing plant and machinery valuation practices and different schools of thought among the valuers. Some follow the United Kingdom.s RICS guidelines, whilst some valuers are more comfortable with the United State.s USPAP rules, especially on the premise of value. This research is to investigate the international best practices of plant and machinery valuation and to establish the common valuation concept, awareness and application of valuation methodology and valuation process for plant and machinery valuation in Malaysia. This research uses a combination of the qualitative and quantitative research approach. In the qualitative approach, the content analyses were conducted from the international practices and current Malaysian implementation of plant and machinery valuation. A survey (quantitative approach) via questionnaire was implemented among the registered and probationary valuers in Malaysia to investigate their understanding and opinion relating to plant and machinery valuation based on the current practices. The significance of this research is the identification of international plant and machinery practices and the understanding of current practices of plant and machinery valuation in Malaysia. It is found that issues embedding plant and machinery valuation practices are limited numbers of resources available either from scholars or practitioner. This is supported by the general finding from the research survey that indicates that there are immediate needs for practical notes or guidelines to be developed and implemented to support the Malaysian valuers practising plant and machinery valuation. This move will lead to a better understanding of plant and machinery valuation, reducing discrepancies in valuation of plant and machinery and increased accuracy among practising valuers.
Resumo:
The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.
Resumo:
Malaysian Financial Reporting Standard (FRS) No. 136, Impairment of Assets, was issued in 2005. The standard requires public listed companies to report their non-current assets at no more than their recoverable amount. When the value of impaired assets is recovered, or partly recovered, FRS 136 requires the impairment charges to be reversed to its new recoverable amount. This study tests whether the reversal of impairment losses by Malaysian firms is more closely associated with economic reasons or reporting incentives. The sample of this study consists of 182 public companies listed on Bursa Malaysia (formerly known as the Kuala Lumpur Stock Exchange) that reported reversals of their impairment charges during the period 2006-2009. These firms are matched with firms which do not reverse impairment on the basis of industrial classification and size. In the year of reversal, this study finds that the reversal firms are more profitable (before reversals) than their matched firms. On average, the Malaysian stock market values the reversals of impairment losses positively. These results suggest that the reversals generally reflect increases in the value of the previously impaired assets. After partitioning firms that are likely to manage earnings and those that are not, this study finds that there are some Malaysian firms which reverse the impairment charges to manage earnings. Their reversals are not value-relevant, and are negatively associated with future firm performance. On the other hand, the reversals of firms which are deemed not to be earnings managers are positively associated with both future firm performance and current stock price performance, and this is the dominant motivation for the reversal of impairment charges in Malaysia. In further analysis, this study provides evidence that the opportunistic reversals are also associated with other earnings management manifestations, namely abnormal working capital accruals and the motivation to avoid earnings declines. In general, the findings suggest that the fair value measurement in impairment standard provides useful information to the users of financial statements.
Resumo:
The formation of various phases during boronizing of silicided molybdenum substrates (MoSi2/Mo) was investigated. Boronizing treatments were conducted in molten salts under an inert gas atmosphere in the 700-1000 degrees C temperature range for 3-7 h. Depending on the process type (non-current or electrochemical) and molten salt temperature, the formation of different boride phases (MoB, Mo2B5, MoB2, MoB4) was observed. At the same time, substantial oxidation of the bulk molybdenum disilicide phase (MoSi2) to the Mo5Si3 phase was observed in non-current boronizing. The oxidation resistance of the coatings was investigated by the weight change in an air-water (2.3 vol.%) mixture at a temperature of 500 degrees C for a period up to 700 h. Results indicated that a two-phase microstructure consisting of the MoSi2, matrix phase with 12-15 wt.% of the MoB4 phase greatly improved the oxidation resistance of the molybdenum substrates. The weight gain rate observed was 6.5 center dot 10(-4) mg/cm(2) h. (c) 2006 Elsevier B.V. All rights reserved.
Resumo:
Dissertação apresentada ao Instituto Superior de Contabilidade e Administração do Porto para a obtenção do grau de Mestre em Auditoria Orientada por: Mestre Carlos Martins
Resumo:
Two-hundred random pedigrees of cows and fifty of sires born in 1987 from the Gir herdbook of the Brazilian Association of Zebu Breeders were analized. The bull Chave de Ouro DGR no. 2851 was the most influential animal with a 7 % direct relationship to the breed. Total average inbreeding was 3.62 and 3.25 for the female and male sample, respectively. The subdivision of total inbreeding into current and non-current components resulted in values of 1.62, 1.25, 2.00 and 2.00 for the female and male sample, respectively. Long-term inbreeding was the principal component of non-current inbreeding, with values of 1.52 % and 1.26 %, respectively. Inbreeding due to strain formation strain due formation was less important (0.48 % and 0.74 %, respectively). The average generation interval was 8.02 years. The breed appears not yet to be subdivided into strains but this process may be starting. The average generation interval for the pedigree population was very high. Culling of old bulls could decrease this interval.
Resumo:
This program of research examines the experience of chronic pain in a community sample. While, it is clear that like patient samples, chronic pain in non-patient samples is also associated with psychological distress and physical disability, the experience of pain across the total spectrum of pain conditions (including acute and episodic pain conditions) and during the early course of chronic pain is less clear. Information about these aspects of the pain experience is important because effective early intervention for chronic pain relies on identification of people who are likely to progress to chronicity post-injury. A conceptual model of the transition from acute to chronic pain was proposed by Gatchel (1991a). In brief, Gatchel’s model describes three stages that individuals who have a serious pain experience move through, each with worsening psychological dysfunction and physical disability. The aims of this program of research were to describe the experience of pain in a community sample in order to obtain pain-specific data on the problem of pain in Queensland, and to explore the usefulness of Gatchel’s Model in a non-clinical sample. Additionally, five risk factors and six protective factors were proposed as possible extensions to Gatchel’s Model. To address these aims, a prospective longitudinal mixed-method research design was used. Quantitative data was collected in Phase 1 via a comprehensive postal questionnaire. Phase 2 consisted of a follow-up questionnaire 3 months post-baseline. Phase 3 consisted of semi-structured interviews with a subset of the original sample 12 months post follow-up, which used qualitative data to provide a further in-depth examination of the experience and process of chronic pain from respondents’ point of view. The results indicate chronic pain is associated with high levels of anxiety and depressive symptoms. However, the levels of disability reported by this Queensland sample were generally lower than those reported by clinical samples and consistent with disability data reported in a New South Wales population-based study. With regard to the second aim of this program of research, while some elements of the pain experience of this sample were consistent with that described by Gatchel’s Model, overall the model was not a good fit with the experience of this non-clinical sample. The findings indicate that passive coping strategies (minimising activity), catastrophising, self efficacy, optimism, social support, active strategies (use of distraction) and the belief that emotions affect pain may be important to consider in understanding the processes that underlie the transition to and continuation of chronic pain.
Resumo:
This document provides a review of international and national practices in investment decision support tools in road asset management. Efforts were concentrated on identifying analytic frameworks, evaluation methodologies and criteria adopted by current tools. Emphasis was also given to how current approaches support Triple Bottom Line decision-making. Benefit Cost Analysis and Multiple Criteria Analysis are principle methodologies in supporting decision-making in Road Asset Management. The complexity of the applications shows significant differences in international practices. There is continuing discussion amongst practitioners and researchers regarding to which one is more appropriate in supporting decision-making. It is suggested that the two approaches should be regarded as complementary instead of competitive means. Multiple Criteria Analysis may be particularly helpful in early stages of project development, say strategic planning. Benefit Cost Analysis is used most widely for project prioritisation and selecting the final project from amongst a set of alternatives. Benefit Cost Analysis approach is useful tool for investment decision-making from an economic perspective. An extension of the approach, which includes social and environmental externalities, is currently used in supporting Triple Bottom Line decision-making in the road sector. However, efforts should be given to several issues in the applications. First of all, there is a need to reach a degree of commonality on considering social and environmental externalities, which may be achieved by aggregating the best practices. At different decision-making level, the detail of consideration of the externalities should be different. It is intended to develop a generic framework to coordinate the range of existing practices. The standard framework will also be helpful in reducing double counting, which appears in some current practices. Cautions should also be given to the methods of determining the value of social and environmental externalities. A number of methods, such as market price, resource costs and Willingness to Pay, are found in the review. The use of unreasonable monetisation methods in some cases has discredited Benefit Cost Analysis in the eyes of decision makers and the public. Some social externalities, such as employment and regional economic impacts, are generally omitted in current practices. This is due to the lack of information and credible models. It may be appropriate to consider these externalities in qualitative forms in a Multiple Criteria Analysis. Consensus has been reached in considering noise and air pollution in international practices. However, Australia practices generally omitted these externalities. Equity is an important consideration in Road Asset Management. The considerations are either between regions, or social groups, such as income, age, gender, disable, etc. In current practice, there is not a well developed quantitative measure for equity issues. More research is needed to target this issue. Although Multiple Criteria Analysis has been used for decades, there is not a generally accepted framework in the choice of modelling methods and various externalities. The result is that different analysts are unlikely to reach consistent conclusions about a policy measure. In current practices, some favour using methods which are able to prioritise alternatives, such as Goal Programming, Goal Achievement Matrix, Analytic Hierarchy Process. The others just present various impacts to decision-makers to characterise the projects. Weighting and scoring system are critical in most Multiple Criteria Analysis. However, the processes of assessing weights and scores were criticised as highly arbitrary and subjective. It is essential that the process should be as transparent as possible. Obtaining weights and scores by consulting local communities is a common practice, but is likely to result in bias towards local interests. Interactive approach has the advantage in helping decision-makers elaborating their preferences. However, computation burden may result in lose of interests of decision-makers during the solution process of a large-scale problem, say a large state road network. Current practices tend to use cardinal or ordinal scales in measure in non-monetised externalities. Distorted valuations can occur where variables measured in physical units, are converted to scales. For example, decibels of noise converts to a scale of -4 to +4 with a linear transformation, the difference between 3 and 4 represents a far greater increase in discomfort to people than the increase from 0 to 1. It is suggested to assign different weights to individual score. Due to overlapped goals, the problem of double counting also appears in some of Multiple Criteria Analysis. The situation can be improved by carefully selecting and defining investment goals and criteria. Other issues, such as the treatment of time effect, incorporating risk and uncertainty, have been given scant attention in current practices. This report suggested establishing a common analytic framework to deal with these issues.
Resumo:
Reliable budget/cost estimates for road maintenance and rehabilitation are subjected to uncertainties and variability in road asset condition and characteristics of road users. The CRC CI research project 2003-029-C ‘Maintenance Cost Prediction for Road’ developed a method for assessing variation and reliability in budget/cost estimates for road maintenance and rehabilitation. The method is based on probability-based reliable theory and statistical method. The next stage of the current project is to apply the developed method to predict maintenance/rehabilitation budgets/costs of large networks for strategic investment. The first task is to assess the variability of road data. This report presents initial results of the analysis in assessing the variability of road data. A case study of the analysis for dry non reactive soil is presented to demonstrate the concept in analysing the variability of road data for large road networks. In assessing the variability of road data, large road networks were categorised into categories with common characteristics according to soil and climatic conditions, pavement conditions, pavement types, surface types and annual average daily traffic. The probability distributions, statistical means, and standard deviation values of asset conditions and annual average daily traffic for each type were quantified. The probability distributions and the statistical information obtained in this analysis will be used to asset the variation and reliability in budget/cost estimates in later stage. Generally, we usually used mean values of asset data of each category as input values for investment analysis. The variability of asset data in each category is not taken into account. This analysis method demonstrated that it can be used for practical application taking into account the variability of road data in analysing large road networks for maintenance/rehabilitation investment analysis.
Resumo:
The purpose of this paper is to emphasis the significance of public asset management in Indonesia that is by identifying opportunities and challenges of Indonesian local governments in adopting current practice of Public Asset Management System. A Case Study, in South Sulawesi Provincial government was used as the approach to achieve the research objective. The case study involved two data collection techniques i.e. interviews followed by study on documents. The result of the study indicates there are some significant opportunities and challenges that Indonesian local government might deal with in adopting current practice of public asset management. There are opportunities that can lead to more effective and efficient local government, accountable and auditable local government organization, increase local government portfolio, and improve the quality of public services. The challenges include no clear institutional and legal framework to support the asset management application, non-profit principle of public assets, cross jurisdictions in public asset management, complexity of local government objectives, and unavailability of data for managing public property. The study only covers condition of South Sulawesi Province, which could not represent exactly the whole local governments’ condition in Indonesia. Findings from this study provide useful input for the policy makers, scholars and asset management practitioners in Indonesia to establish a public asset management framework that suitable for Indonesia.
Resumo:
Estimating and predicting degradation processes of engineering assets is crucial for reducing the cost and insuring the productivity of enterprises. Assisted by modern condition monitoring (CM) technologies, most asset degradation processes can be revealed by various degradation indicators extracted from CM data. Maintenance strategies developed using these degradation indicators (i.e. condition-based maintenance) are more cost-effective, because unnecessary maintenance activities are avoided when an asset is still in a decent health state. A practical difficulty in condition-based maintenance (CBM) is that degradation indicators extracted from CM data can only partially reveal asset health states in most situations. Underestimating this uncertainty in relationships between degradation indicators and health states can cause excessive false alarms or failures without pre-alarms. The state space model provides an efficient approach to describe a degradation process using these indicators that can only partially reveal health states. However, existing state space models that describe asset degradation processes largely depend on assumptions such as, discrete time, discrete state, linearity, and Gaussianity. The discrete time assumption requires that failures and inspections only happen at fixed intervals. The discrete state assumption entails discretising continuous degradation indicators, which requires expert knowledge and often introduces additional errors. The linear and Gaussian assumptions are not consistent with nonlinear and irreversible degradation processes in most engineering assets. This research proposes a Gamma-based state space model that does not have discrete time, discrete state, linear and Gaussian assumptions to model partially observable degradation processes. Monte Carlo-based algorithms are developed to estimate model parameters and asset remaining useful lives. In addition, this research also develops a continuous state partially observable semi-Markov decision process (POSMDP) to model a degradation process that follows the Gamma-based state space model and is under various maintenance strategies. Optimal maintenance strategies are obtained by solving the POSMDP. Simulation studies through the MATLAB are performed; case studies using the data from an accelerated life test of a gearbox and a liquefied natural gas industry are also conducted. The results show that the proposed Monte Carlo-based EM algorithm can estimate model parameters accurately. The results also show that the proposed Gamma-based state space model have better fitness result than linear and Gaussian state space models when used to process monotonically increasing degradation data in the accelerated life test of a gear box. Furthermore, both simulation studies and case studies show that the prediction algorithm based on the Gamma-based state space model can identify the mean value and confidence interval of asset remaining useful lives accurately. In addition, the simulation study shows that the proposed maintenance strategy optimisation method based on the POSMDP is more flexible than that assumes a predetermined strategy structure and uses the renewal theory. Moreover, the simulation study also shows that the proposed maintenance optimisation method can obtain more cost-effective strategies than a recently published maintenance strategy optimisation method by optimising the next maintenance activity and the waiting time till the next maintenance activity simultaneously.