963 resultados para materials management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Scientific studies on the materials management systems and practices actually followed in various organizations in India are rather limited. This is particularly true with respect to service industries. In this context ,the present study on the “materials management in state transport undertakings in India, with special reference to kerala state road corporation” assumes particular significance . This study, examines critically, the prevailing set up, procedures and practices of materials management in the Kerala state road transport corporation and compares them with the prevailing practices in other similar state transport undertakings. It indicates several areas for improvement with respect to the organization, materials planning, purchasing, store keeping and other aspects. It also seeks to develop a comprehensive inventory control system for KSRTC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This is a survey of the procurement, organization and use of unpublished projects, theses, and Africana mateials in Hezekiah Oluwasanmi Library, Obafemi Awolowo University, Ile-Ife, Nigeria. The Africana section conserves knowledge, preserves cultural heritage, provides information, and supports education and research. This paper the location, mode of processing, circulation, and terms of availability of these materials. Recommendations are made on how to manage Africana materials in academic libraries where they constitute a vital component of collections.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Materials management function is always a major concern to the management of any industrial organisation as high inventory and an inefficient procurement process affect the profitability to a great extent. Problems multiply due to a very current business environment in India. Hence, existing materials planning and procurement processes and inventory management systems require a re-look with respect to a changing business environment. This study shows a radical improvement in materials management function of an Indian petroleum refinery through business process re-engineering (BPR) by analysing current processes, identifying key issues, deriving paradigm shifts and developing re-engineered processes through customer value analysis. BPR has been carried out on existing processes of “materials planning and procurement” and “warehousing and surplus disposal”. The re-engineered processes for materials management function trigger a few improvement projects that were identified by the group of executives who took part in the re-engineering exercise. Those projects were implemented in an integrated framework with the application of the state of art information technology tools.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The materials management function is always a major concern to management of any industrial organization, since high inventory and an inefficient procurement process significantly affect profitability. Problems multiply due to the current dynamic business environment in many countries. Hence, existing materials planning and procurement process and inventory management systems require a review. This article shows a radical improvement in the materials management function for an Indian petroleum refinery through business process re-engineering (BPR) by analyzing the current process, identifying key issues, deriving paradigm shifts and developing re-engineered processes through customer value analysis. BPR has been carried out on the existing processes of "material planning and procurement" and "warehousing and surplus disposal.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

With the increase in construction in dense urban environments, the delays associated with managing the material supply chain to site is called into question. Purpose: The aim of this investigation is to gain the perspective of construction contractors operating in a dense urban environment and the resulting strategies adopted to reduce delays in the delivery of materials to site. Methodology: This is achieved through incorporating a comprehensive literature review on the subject in conjunction with industry interviews with construction professionals in the identification of various management issues and corresponding strategies in the reduction of delays in the delivery of materials to site. Findings: The key issue which emerges is the lack of space for unloading bays while the corresponding key strategy is to schedule deliveries outside peak congestion times. Practical Implication: With confined site construction evident throughout the industry and the noted importance of an effective supply chain, the findings here in further assist on-site management in the daily task of ensuring the effective delivery and off-loading of materials in a complex and hazardous environment. Originality/Value: This research aids on-site management of confined site environments in the coordination of the material supply chain to site.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The objective of this paper is to identify various managerial issues encountered and resulting strategies adopted, with regards management of materials on confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, for the successful management of such confined environments within the realm of materials management.


Through conducting an extensive literature review and detailed interviews, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The following are the leading issues highlighted; (1)Lack of adequate storage space, (2)Work place becoming over-crowded, (3)Lack of adequate room for the effective handling of materials and (4)Difficult to transport materials around site. The leading managerial strategies to the management of materials on confined construction sites may be listed in order of importance, as follows; (1)Pre-fabrication and pre-assembly, (2)Providing adequate storage, (3)Space scheduling, (4)Just-In-Time delivery techniques, and (5)Effective design site layout.

Based on the research conducted, it can be concluded, that through effective management of the issues identified along with implementing the various strategies highlighted; successful materials management within a confined construction site environment is attainable.


Innovative Aspect of Paper: An empirical study of three different construction sites in three different countries (Ireland, England and USA) investigating the managerial issues and strategies relating to implementation of materials management in confined construction sites.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Teollisuuden palveluiden on huomattu olevan potentiaalinen lisätulojen lähde. Teollisuuden palveluiden dynaamisessa maailmassa räätälöinti ja kyky toimia nopeasti ovat kriittisiä asiakastyytyväisyyden ja kilpailuedun luomisprosessin osia. Toimitusketjussa käytetyn ajan lyhentämisellä voidaan saavuttaa sekä paremmat vasteajat, että alhaisemmat kokonaiskustannukset. Tutkielman tavoitteena on kuvata teollisuuden palveluiden dynaamista ympäristöä: asiakastarvetta, sekä mahdollisuuksia kaventaa pyydetyn ja saavutetun toimitusajan välistä eroa. Tämä toteutetaan pääosin strategisen toimitusajan hallinnan keinoin. Langattomien tietoliikenneverkkojen operaattorit haluavat vähentää ydinosaamiseensa kuulumatomiin toimintoihin, kuten ylläpitoon sitoutuneita pääomia. Tutkielman case osiossa varaosapalvelujen toimitusketjun kysyntä-, materiaali- ja informaatiovirtoja analysoidaan niin kvalitatiivisten haastatteluiden, sisäisten dokumenttien, kuin kvantitatiivisten tilastollisten menetelmienkin avulla. Löydöksiä peilataan vallitsevaa toimitusketjun ja ajanhallinnan paradigmaa vasten. Tulokset osoittavat, että vahvan palvelukulttuurin omaksuminen ja kokonaisvaltainen toimitusketjun tehokkuuden mittaaminen ovat ajanhallinnan lähtökohtia teollisuuden palveluissa.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

One of the basic functions of management is to employ capital efficiently so as to provide maximum customer service and earn a profit in the proces1s. It is possible to achieve these objectives in different ways with the given amount of capital, either by maximising the output or by maximising the margin of profit or by a combination of both these methods. This would mean that the management must try to make this capital work as fast as possible, which is often difficult to achieve under the present conditions of the factors of production. It is also not possible to increase extensively the margin of profit due to competition in business and in this process the capital turn over and productivity of capital often becomes totally ineffective. Several modern techniques have been developed and employed by managers to remedy this situation. Among these, materials management has become one of the most effective methods to achieve both the above goals. Materials management enables a manager to improve productivity of capital by reducing material costs, preventing blocking up of large working capital for long periods and improving the capital turn over This study examines the working of materials management departments in public sector undertakings in India and Suggests méthods to improve its efficiency.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Conventional mechanical building demolition produces numerous solid wastes, most of which are sent to landfill directly and severely degrade the living environment. Just-in-time building demolition has been developed recently with a management strategy to facilitate waste reuse. Procurement management plays a significant role in just-in-time building demolition. In particular, the demolition tendering selection needs to consider contractors' environmental performance in addition to project costs. Moreover, the flow of building materials in a demolition project may be regarded as a supply chain involving the building owner, demolition contractor and material demanders. This paper develops a framework for salvaged materials management in the emerging demolition industry. The research is to promote the recycling and reuse of building demolition materials in order to achieve better environmental and financial performance for building demolition projects.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

One of the concerns after a major trauma to the orbit is to be rebuilt. This can be achieved with care in management of orbital reconstruction, techniques, types of materials, and osseointegrated implants; it allows satisfactory aesthetic recuperation and well-being, whereas psychological therapy allows for patients' re-insertion in social and family environment to make them feel happier and safer.