998 resultados para logit network loading


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a topological sorting based algorithm for logit network loading problem to exclude all cycles by removing certain links from loops. The new algorithm calculates the link weights and flows according to topological order. It produces the theoretical results for networks without loops. Numerical examples show that the new algorithm can reduce errors introduced by the strict definition of 'reasonable route' in Dial's algorithm.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper proposes a distributed control approach to coordinate multiple energy storage units (ESUs) to avoid violation of voltage and thermal constraints, which are some of the main power quality challenges for future distribution networks. ESUs usually are connected to a network through voltage source converters. In this paper, both ESU converters active and reactive power are used to deal with the above mentioned power quality issues. ESUs' reactive power is proposed to be used for voltage support, while the active power is to be utilized in managing network loading. Two typical distribution networks are used to apply the proposed method, and the simulated results are illustrated in this paper to show the effectiveness of this approach.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper looks at potential distribution network stability problems under the Smart Grid scenario. This is to consider distributed energy resources (DERs) e.g. renewable power generations and intelligent loads with power-electronic controlled converters. The background of this topic is introduced and potential problems are defined from conventional power system stability and power electronic system stability theories. Challenges are identified with possible solutions from steady-state limits, small-signal, and large-signal stability indexes and criteria. Parallel computation techniques might be included for simulation or simplification approaches are required for a largescale distribution network analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Hydrogels, which are three-dimensional crosslinked hydrophilic polymers, have been used and studied widely as vehicles for drug delivery due to their good biocompatibility. Traditional methods to load therapeutic proteins into hydrogels have some disadvantages. Biological activity of drugs or proteins can be compromised during polymerization process or the process of loading protein can be really timeconsuming. Therefore, different loading methods have been investigated. Based on the theory of electrophoresis, an electrochemical gradient can be used to transport proteins into hydrogels. Therefore, an electrophoretic method was used to load protein in this study. Chemically and radiation crosslinked polyacrylamide was used to set up the model to load protein electrophoretically into hydrogels. Different methods to prepare the polymers have been studied and have shown the effect of the crosslinker (bisacrylamide) concentration on the protein loading and release behaviour. The mechanism of protein release from the hydrogels was anomalous diffusion (i.e. the process was non-Fickian). The UV-Vis spectra of proteins before and after reduction show that the bioactivities of proteins after release from hydrogel were maintained. Due to the concern of cytotoxicity of residual monomer in polyacrylamide, poly(2-hydroxyethyl- methacrylate) (pHEMA) was used as the second tested material. In order to control the pore size, a polyethylene glycol (PEG) porogen was introduced to the pHEMA. The hydrogel disintegrated after immersion in water indicating that the swelling forces exceeded the strength of the material. In order to understand the cause of the disintegration, several different conditions of crosslinker concentration and preparation method were studied. However, the disintegration of the hydrogel still occurred after immersion in water principally due to osmotic forces. A hydrogel suitable for drug delivery needs to be biocompatible and also robust. Therefore, an approach to improving the mechanical properties of the porogen-containing pHEMA hydrogel by introduction of an inter-penetrating network (IPN) into the hydrogel system has been researched. A double network was formed by the introduction of further HEMA solution into the system by both electrophoresis and slow diffusion. Raman spectroscopy was used to observe the diffusion of HEMA into the hydrogel prior to further crosslinking by ã-irradiation. The protein loading and release behaviour from the hydrogel showing enhanced mechanical property was also studied. Biocompatibility is a very important factor for the biomedical application of hydrogels. Different hydrogels have been studied on both a three-dimensional HSE model and a HSE wound model for their biocompatibilities. They did not show any detrimental effect to the keratinocyte cells. From the results reported above, these hydrogels show good biocompatibility in both models. Due to the advantage of the hydrogels such as the ability to absorb and deliver protein or drugs, they have potential to be used as topical materials for wound healing or other biomedical applications.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Summary Appropriate assessment and management of diabetes-related foot ulcers (DRFUs) is essential to reduce amputation risk. Management requires debridement, wound dressing, pressure off-loading, good glycaemic control and potentially antibiotic therapy and vascular intervention. As a minimum, all DRFUs should be managed by a doctor and a podiatrist and/or wound care nurse. Health professionals unable to provide appropriate care for people with DRFUs should promptly refer individuals to professionals with the requisite knowledge and skills. Indicators for immediate referral to an emergency department or multidisciplinary foot care team (MFCT) include gangrene, limb-threatening ischaemia, deep ulcers (bone, joint or tendon in the wound base), ascending cellulitis, systemic symptoms of infection and abscesses. Referral to an MFCT should occur if there is lack of wound progress after 4 weeks of appropriate treatment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

While both the restoration of the blood supply and an appropriate local mechanical environment are critical for uneventful bone healing, their influence on each other remains unclear. Human bone fracture haematomas (<72h post-trauma) were cultivated for 3 days in fibrin matrices, with or without cyclic compression. Conditioned medium from these cultures enhanced the formation of vessel-like networks by HMEC-1 cells, and mechanical loading further elevated it, without affecting the cells’ metabolic activity. While haematomas released the angiogenesis-regulators, VEGF and TGF-β1, their concentrations were not affected by mechanical loading. However, direct cyclic stretching of the HMEC-1 cells decreased network formation. The appearance of the networks and a trend towards elevated VEGF under strain suggested physical disruption rather than biochemical modulation as the responsible mechanism. Thus, early fracture haematomas and their mechanical loading increase the paracrine stimulation of endothelial organisation in vitro, but direct periodic strains may disrupt or impair vessel assembly in otherwise favourable conditions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project was an innovative approach in developing smart coordination of available energy resources to improve the integration level of PV in distribution network. Voltage and loading issues are considered as the main concerns for future electricity grid which need to be avoided using such resources. A distributed control structure was proposed for the resources in distribution network to avoid noted power quality issues.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Wind speed measurement systems are sparse in the tropical regions of Australia. Tropical cyclone wind speeds impacting communities are often ‘guestimated’ from analyzing damaged structures. A re-locatable anemometer system is required to enable measurements of wind speeds. This paper discusses design criteria of the tripods and tie down system, proposed deployment of the anemometers, instrumentation, and data logging. Preliminary assessment of the anemometer response indicates a reliable system for 1 second response, however, it is noted that the Australian building code and wind loading standard uses a moving average time of approximately 0.2 seconds for its wind speed design criteria.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Wind speed measurement systems are sparse in the tropical regions of Australia. Given this, tropical cyclone wind speeds impacting communities are seldom measured and often only ‘guestimated’ by analysing the extent of damage to structures. In an attempt to overcome this dearth of data, a re-locatable network of anemometers to be deployed prior to tropical cyclone landfall is currently being developed. This paper discusses design criteria of the network’s tripods and tie down system, proposed deployment of the anemometers, instrumentation and data logging. Preliminary assessment of the anemometer response indicates a reliable system for measuring the spectral component of wind with frequencies of approximately 1 Hz. This system limitation highlights an important difference between the capabilities of modern instrumentation and that of the Dines anemometer (around 0.2 seconds) that was used to develop much of the design criteria within the Australian building code and wind loading standard.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Low voltage distribution networks feature a high degree of load unbalance and the addition of rooftop photovoltaic is driving further unbalances in the network. Single phase consumers are distributed across the phases but even if the consumer distribution was well balanced when the network was constructed changes will occur over time. Distribution transformer losses are increased by unbalanced loadings. The estimation of transformer losses is a necessary part of the routine upgrading and replacement of transformers and the identification of the phase connections of households allows a precise estimation of the phase loadings and total transformer loss. This paper presents a new technique and preliminary test results for a method of automatically identifying the phase of each customer by correlating voltage information from the utility's transformer system with voltage information from customer smart meters. The techniques are novel as they are purely based upon a time series of electrical voltage measurements taken at the household and at the distribution transformer. Experimental results using a combination of electrical power and current of the real smart meter datasets demonstrate the performance of our techniques.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research improved the measurement of public transport accessibility by capturing; travellers' behaviour; diversity of public transport mode; and the subjectivity of travellers' decision in the complex transport networks. The results of this research not only highlighted the importance of considering public transport network characteristics but also, revealed the impact of public transport diversity in the modelling of public transport accessibility. The research developed a hybrid discrete choice model with a nested logit structure to treat the correlation among the public transport mode choices and, a logit correction factor to rectify the correlation among the stop choices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The recently developed single network adaptive critic (SNAC) design has been used in this study to design a power system stabiliser (PSS) for enhancing the small-signal stability of power systems over a wide range of operating conditions. PSS design is formulated as a discrete non-linear quadratic regulator problem. SNAC is then used to solve the resulting discrete-time optimal control problem. SNAC uses only a single critic neural network instead of the action-critic dual network architecture of typical adaptive critic designs. SNAC eliminates the iterative training loops between the action and critic networks and greatly simplifies the training procedure. The performance of the proposed PSS has been tested on a single machine infinite bus test system for various system and loading conditions. The proposed stabiliser, which is relatively easier to synthesise, consistently outperformed stabilisers based on conventional lead-lag and linear quadratic regulator designs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a Single Network Adaptive Critic (SNAC) based Power System Stabilizer (PSS) for enhancing the small-signal stability of power systems over a wide range of operating conditions. SNAC uses only a single critic neural network instead of the action-critic dual network architecture of typical adaptive critic designs. SNAC eliminates the iterative training loops between the action and critic networks and greatly simplifies the training procedure. The performance of the proposed PSS has been tested on a Single Machine Infinite Bus test system for various system and loading conditions. The proposed stabilizer, which is relatively easier to synthesize, consistently outperformed stabilizers based on conventional lead-lag and linear quadratic regulator designs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a prototype of a fuzzy system for alleviation of network overloads in the day-to-day operation of power systems. The control used for overload alleviation is real power generation rescheduling. Generation Shift Sensitivity Factors (GSSF) are computed accurately, using a more realistic operational load flow model. Overloading of lines and sensitivity of controlling variables are translated into fuzzy set notations to formulate the relation between overloading of line and controlling ability of generation scheduling. A fuzzy rule based system is formed to select the controllers, their movement direction and step size. Overall sensitivity of line loading to each of the generation is also considered in selecting the controller. Results obtained for network overload alleviation of two modified Indian power networks of 24 bus and 82 bus with line outage contingencies are presented for illustration purposes.