1 resultado para lisensiointiprosessi


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Recently, Small Modular Reactors (SMRs) have attracted increased public discussion. While large nuclear power plant new build projects are facing challenges, the focus of attention is turning to small modular reactors. One particular project challenge arises in the area of nuclear licensing, which plays a significant role in new build projects affecting their quality as well as costs and schedules. This dissertation - positioned in the field of nuclear engineering but also with a significant section in the field of systems engineering - examines the nuclear licensing processes and their suitability for the characteristics of SMRs. The study investigates the licensing processes in selected countries, as well as other safety critical industry fields. Viewing the licensing processes and their separate licensing steps in terms of SMRs, the study adopts two different analysis theories for review and comparison. The primary data consists of a literature review, semi-structured interviews, and questionnaire responses concerning licensing processes and practices. The result of the study is a recommendation for a new, optimized licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. As this study focuses on Finland, the main features of the new licensing process are adapted to the current Finnish licensing process, aiming to achieve the main benefits with minimal modifications to the current process. The application of the new licensing process is developed using Systems Engineering, Requirements Management, and Project Management practices and tools. Nuclear licensing includes a large amount of data and documentation which needs to be managed in a suitable manner throughout the new build project and then during the whole life cycle of the nuclear power plant. To enable a smooth licensing process and therefore ensure the success of the new build nuclear power plant project, management processes and practices play a significant role. This study contributes to the theoretical understanding of how licensing processes are structured and how they are put into action in practice. The findings clarify the suitability of different licensing processes and their selected licensing steps for SMR licensing. The results combine the most suitable licensing steps into a new licensing process for SMRs. The results are also extended to the concept of licensing management practices and tools.