955 resultados para life cycle information
Resumo:
A whole life-cycle information management vision is proposed, the organizational requirements for the realization of the scenario is investigated. Preliminary interviews with construction professionals are reported. Discontinuities at information transfer throughout life-cycle of built environments are resulting from lack of coordination and multiple data collection/storage practices. A more coherent history of these activities can improve the work practices of various teams by augmenting decision making processes and creating organizational learning opportunities. Therefore, there is a need for unifying these fragmented bits of data to create a meaningful, semantically rich and standardized information repository for built environment. The proposed vision utilizes embedded technologies and distributed building information models. Two diverse construction project types (large one-off design, small repetitive design) are investigated for the applicability of the vision. A functional prototype software/hardware system for demonstrating the practical use of this vision is developed and discussed. Plans for case-studies for validating the proposed model at a large PFI hospital and housing association projects are discussed.
Resumo:
The objective of this research is to investigate the consequences of sharing or using information generated in one phase of the project to subsequent life cycle phases. Sometimes the assumptions supporting the information change, and at other times the context within which the information was created changes in a way that causes the information to become invalid. Often these inconsistencies are not discovered till the damage has occurred. This study builds on previous research that proposed a framework based on the metaphor of ‘ecosystems’ to model such inconsistencies in the 'supply chain' of life cycle information (Brokaw and Mukherjee, 2012). The outcome of such inconsistencies often results in litigation. Therefore, this paper studies a set of legal cases that resulted from inconsistencies in life cycle information, within the ecosystems framework. For each project, the errant information type, creator and user of the information and their relationship, time of creation and usage of the information in the life cycle of the project are investigated to assess the causes of failure of precise and accurate information flow as well as the impact of such failures in later stages of the project. The analysis shows that the misleading information is mostly due to lack of collaboration. Besides, in all the studied cases, lack of compliance checking, imprecise data and insufficient clarifications hinder accurate and smooth flow of information. The paper presents findings regarding the bottleneck of the information flow process during the design, construction and post construction phases. It also highlights the role of collaboration as well as information integration and management during the project life cycle and presents a baseline for improvement in information supply chain through the life cycle of the project.
Resumo:
The scope of this project is to study the effectiveness of building information modelling (BIM) in performing life cycle assessment in a building. For the purposes of the study will be used “Revit” which is a BIM software and Tally which is an LCA tool integrated in Revit. The project is divided in six chapters. The first chapter consists of a theoretical introduction into building information modelling and its connection to life cycle assessment. The second chapter describes the characteristics of building information modelling (BIM). In addition, a comparison has been made with the traditional architectural, engineering and construction business model and the benefits to shift into BIM. In the third chapter it will be a review of the most well-known and available BIM software in the market. In chapter four life cycle assessment (LCA) will be described in general and later on specifically for the purpose of the case study that will be used in the following chapter. Moreover, the tools that are available to perform an LCA will be reviewed. Chapter five will present the case study that consists of a model in a BIM software (Revit) and the LCA performed by Tally, an LCA tool integrated into Revit. In the last chapter will be a discussion of the results that were obtained, the limitation and the possible future improvement in performing life cycle assessment (LCA) in a BIM model.
Resumo:
Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.
Resumo:
Life-Cycle Civil Engineering – Biondini & Frangopol
Resumo:
Dissertação para obtenção do Grau de Doutor em Engenharia Electrotécnica e de Computadores
Resumo:
The research described in this thesis has been developed as a part of the Reliability and Field Data Management for Multi-Component Products (REFIDAM) Project. This project was funded under the Applied Research Grants Scheme administered by Enterprise Ireland. The project was a partnership between Galway-Mayo Institute of Technology and an industrial company, Thermo King Europe. The project aimed to develop a system to manage the information required for maintenance costing, cost of ownership, reliability assessment and improvement of multi-component products, by establishing information flows between the customer network and across the Thermo King organisation.
Resumo:
A cohort of 100 eggs of Triatoma mazzottii Usinger was studied to obtain information on its life cycle. Egg incubation took 24 days; mean duration of 1st, 2nd, 3rd, 4th, and 5th instar nymphs was 27, 36, 39, 46 and 64 days respectively; mean time from egg to adult was 236 days. The total duration of the nymphal stages was 212 days. The total nymph mortality in cohort was 16.3% and the embryonic egg mortality was 14.0%. The grater mortality occured in the 2nd instar. The average number of eggs/female/week was 9.8 during 15 weeks of observation. Of the total eggs laid (2,514), only 58.7% hatched. The total of insects that achieved the adult stage (72), 38 were females (52.8%), and 34 were males (47.2%). The influence of age and feeding on the first mating of T. mazzottii were also studied. It was found that the first mating depended on the male's age and it was on the average 30 days after the last imaginal molt. The female could be mating since 2nd days after the imaginal life. The nutritional status did not play an important role in the capacity of the insect for the first mating.
Resumo:
The 10 June 2000 event was the largest flash flood event that occurred in the Northeast of Spain in the late 20th century, both as regards its meteorological features and its considerable social impact. This paper focuses on analysis of the structures that produced the heavy rainfalls, especially from the point of view of meteorological radar. Due to the fact that this case is a good example of a Mediterranean flash flood event, a final objective of this paper is to undertake a description of the evolution of the rainfall structure that would be sufficiently clear to be understood at an interdisciplinary forum. Then, it could be useful not only to improve conceptual meteorological models, but also for application in downscaling models. The main precipitation structure was a Mesoscale Convective System (MCS) that crossed the region and that developed as a consequence of the merging of two previous squall lines. The paper analyses the main meteorological features that led to the development and triggering of the heavy rainfalls, with special emphasis on the features of this MCS, its life cycle and its dynamic features. To this end, 2-D and 3-D algorithms were applied to the imagery recorded over the complete life cycle of the structures, which lasted approximately 18 h. Mesoscale and synoptic information were also considered. Results show that it was an NS-MCS, quasi-stationary during its stage of maturity as a consequence of the formation of a convective train, the different displacement directions of the 2-D structures and the 3-D structures, including the propagation of new cells, and the slow movement of the convergence line associated with the Mediterranean mesoscale low.
Resumo:
Static process simulation has traditionally been used to model complex processes for various purposes. However, the use of static processsimulators for the preparation of holistic examinations aiming at improving profit-making capability requires a lot of work because the production of results requires the assessment of the applicability of detailed data which may be irrelevant to the objective. The relevant data for the total assessment gets buried byirrelevant data. Furthermore, the models do not include an examination of the maintenance or risk management, and economic examination is often an extra property added to them which can be performed with a spreadsheet program. A process model applicable to holistic economic examinations has been developed in this work. The model is based on the life cycle profit philosophy developed by Hagberg and Henriksson in 1996. The construction of the model has utilized life cycle assessment and life cycle costing methodologies with a view to developing, above all, a model which would be applicable to the economic examinations of complete wholes and which would require the need for information focusing on aspects essential to the objectives. Life cycle assessment and costing differ from each other in terms of the modeling principles, but the features of bothmethodologies can be used in the development of economic process modeling. Methods applicable to the modeling of complex processes can be examined from the viewpoint of life cycle methodologies, because they involve the collection and management of large corpuses of information and the production of information for the needs of decision-makers as well. The results of the study shows that on the basis of the principles of life cycle modeling, a process model can be created which may be used to produce holistic efficiency examinations on the profit-making capability of the production line, with fewer resources thanwith traditional methods. The calculations of the model are based to the maximum extent on the information system of the factory, which means that the accuracyof the results can be improved by developing information systems so that they can provide the best information for this kind of examinations.
Resumo:
This thesis focuses on integration in project business, i.e. how projectbased companies organize their product and process structures when they deliver industrial solutions to their customers. The customers that invest in these solutions run their businesses in different geographical, political and economical environments, which should be acknowledged by the supplier when providing solutions comprising of larger and more complex scopes than previously supplied to these customers. This means that the suppliers are increasing their supply range by taking over some of the activities in the value chain that have traditionally been handled by the customer. In order to be able to provide the functioning solutions, including more engineering hours, technical equipment and a wider project network, a change is needed in the mindset in order to be able to carry out and take the required responsibility that these new approaches bring. For the supplier it is important to be able to integrate technical products, systems and services, but the supplier also needs to have the capabilities to integrate the cross-functional organizations and departments in the project network, the knowledge and information between and within these organizations and departments, along with inputs from the customer into the product and process structures during the lifecycle of the project under development. Hence, the main objective of this thesis is to explore the challenges of integration that industrial projects meet, and based on that, to suggest a concept of how to manage integration in project business by making use of integration mechanisms. Integration is considered the essential process for accomplishing an industrial project, whereas the accomplishment of the industrial project is considered to be the result of the integration. The thesis consists of an extended summary and four papers, that are based on three studies in which integration mechanisms for value creation in industrial project networks and the management of integration in project business have been explored. The research is based on an inductive approach where in particular the design, commissioning and operations functions of industrial projects have been studied, addressing entire project life-cycles. The studies have been conducted in the shipbuilding and power generation industries where the scopes of supply consist of stand-alone equipment, equipment and engineering, and turnkey solutions. These industrial solutions include demanding efforts in engineering and organization. Addressing the calls for more studies on the evolving value chains of integrated solutions, mechanisms for inter- and intra-organizational integration and subsequent value creation in project networks have been explored. The research results in thirteen integration mechanisms and a typology for integration is proposed. Managing integration consists of integrating the project network (the supplier and the sub-suppliers) and the customer (the customer’s business purpose, operations environment and the end-user) into the project by making use of integration mechanisms. The findings bring new insight into research on industrial project business by proposing integration of technology and engineering related elements with elements related to customer oriented business performance in contemporary project environments. Thirteen mechanisms for combining products and the processes needed to deliver projects are described and categorized according to the impact that they have on the management of knowledge and information. These mechanisms directly relate to the performance of the supplier, and consequently to the functioning of the solution that the project provides. This thesis offers ways to promote integration of knowledge and information during the lifecycle of industrial projects, enhancing the development towards innovative solutions in project business.
Resumo:
This study is a qualitative action research by its nature with elements of personal design in the form of a tangible model implementation framework construction. Utilized empirical data has been gathered via two questionnaires in relation to the arranged four workshop events with twelve individual participants. Five of them represented maintenance customers, three maintenance service providers and four equipment providers respectively. Further, there are two main research objectives in proportion to the two complementary focusing areas of this thesis. Firstly, the value-based life-cycle model, which first version has already been developed prior to this thesis, requires updating in order to increase its real-life applicability as an inter-firm decision-making tool in industrial maintenance. This first research objective is fulfilled by improving appearance, intelligibility and usability of the above-mentioned model. In addition, certain new features are also added. The workshop participants from the collaborating companies were reasonably pleased with made changes, although further attention will be required in future on the model’s intelligibility in particular as main results, charts and values were all reckoned as slightly hard to understand. Moreover, upgraded model’s appearance and added new features satisfied them the most. Secondly and more importantly, the premises of the model’s possible inter-firm implementation process need to be considered. This second research objective is delivered in two consecutive steps. At first, a bipartite open-books supported implementation framework is created and its different characteristics discussed in theory. Afterwards, the prerequisites and the pitfalls of increasing inter-organizational information transparency are studied in empirical context. One of the main findings was that the organizations are not yet prepared for network-wide information disclosure as dyadic collaboration was favored instead. However, they would be willing to share information bilaterally at least. Another major result was that the present state of companies’ cost accounting systems will definitely need implementation-wise enhancing in future since accurate and sufficiently detailed maintenance data is not available. Further, it will also be crucial to create supporting and mutually agreed network infrastructure. There are hardly any collaborative models, methods or tools currently in usage. Lastly, the essential questions about mutual trust and predominant purchasing strategies are cooperation-wise important. If inter-organizational activities are expanded, a more relational approach should be favored in this regard. Mutual trust was also recognized as a significant cooperation factor, but it is hard to measure in reality.
Resumo:
There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.
Resumo:
This paper uses a panel data-fixed effect approach and data collected from Chinese public manufacturing firms between 1999 and 2011 to investigate the impacts of business life cycle stages on capital structure. We find that cash flow patterns capture more information on business life cycle stages than firm age and have a stronger impact on capital structure decision-making. We also find that the adjustment speed of capital structure varies significantly across life cycle stages and that non-sequential transitions over life cycle stages play an important role in the determination of capital structure. Our study indicates that it is important for policy-makers to ensure that products and financial markets are well-balanced.