1000 resultados para labor scheduling


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Providing good customer service, inexpensively, is a problem commonly faced by managers of service operations. To tackle this problem, managers must do four tasks: forecast customer demand for the service; translate these forecasts into employee requirements; develop a labor schedule that provides appropriate numbers of employees at appropriate times; and control the delivery of the service in real-time. This paper focuses upon the translation of forecasts of customer demand into employee requirements. Specifically, it presents and evaluates two methods for determining desired staffing levels. One of these methods is a traditional approach to the task, while the other, by using modified customer arrival rates, offers a better means of accounting for the multi-period impact of customer service. To calculate the modified arrival rates, the latter method reduces (increases) the actual customer arrival rate for a period to account for customers who arrived in the period (in earlier periods) but have some of their service performed in subsequent periods (in the period). In an experiment simulating 13824 service delivery environments, the new method demonstrated its superiority by serving 2.74% more customers within the specified waiting time limit while using 7.57% fewer labor hours.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An extensive literature exists on the problems of daily (shift) and weekly (tour) labor scheduling. In representing requirements for employees in these problems, researchers have used formulations based either on the model of Dantzig (1954) or on the model of Keith (1979). We show that both formulations have weakness in environments where management knows, or can attempt to identify, how different levels of customer service affect profits. These weaknesses results in lower-than-necessary profits. This paper presents a New Formulation of the daily and weekly Labor Scheduling Problems (NFLSP) designed to overcome the limitations of earlier models. NFLSP incorporates information on how changing the number of employees working in each planning period affects profits. NFLP uses this information during the development of the schedule to identify the number of employees who, ideally, should be working in each period. In an extensive simulation of 1,152 service environments, NFLSP outperformed the formulations of Dantzig (1954) and Keith (1979) at a level of significance of 0.001. Assuming year-round operations and an hourly wage, including benefits, of $6.00, NFLSP's schedules were $96,046 (2.2%) and $24,648 (0.6%) more profitable, on average, than schedules developed using the formulations of Danzig (1954) and Keith (1979), respectively. Although the average percentage gain over Keith's model was fairly small, it could be much larger in some real cases with different parameters. In 73 and 100 percent of the cases we simulated NFLSP yielded a higher profit than the models of Keith (1979) and Danzig (1954), respectively.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper presents an integer programming model for developing optimal shift schedules while allowing extensive flexibility in terms of alternate shift starting times, shift lengths, and break placement. The model combines the work of Moondra (1976) and Bechtold and Jacobs (1990) by implicitly matching meal breaks to implicitly represented shifts. Moreover, the new model extends the work of these authors to enable the scheduling of overtime and the scheduling of rest breaks. We compare the new model to Bechtold and Jacobs' model over a diverse set of 588 test problems. The new model generates optimal solutions more rapidly, solves problems with more shift alternatives, and does not generate schedules violating the operative restrictions on break timing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There are many factors which can assist in controlling the cost of labor in the food service industry. The author discusses a number of these, including scheduling, establishing production standards, forecasting workloads, analyzing employee turnover, combating absenteeism, and controlling overtime.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we analyse a 600,000 word corpus comprised of policy statements produced within supranational, national, state and local legislatures about the nature and causes of(un)employment. We identify significant rhetorical and discursive features deployed by third sector (un)employment policy authors that function to extend their legislative grasp to encompass the most intimate aspects of human association.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the filed of semantic grid, QoS-based Web service scheduling for workflow optimization is an important problem.However, in semantic and service rich environment like semantic grid, the emergence of context constraints on Web services is very common making the scheduling consider not only quality properties of Web services, but also inter service dependencies which are formed due to the context constraints imposed on Web services. In this paper, we present a repair genetic algorithm, namely minimal-conflict hill-climbing repair genetic algorithm, to address scheduling optimization problems in workflow applications in the presence of domain constraints and inter service dependencies. Experimental results demonstrate the scalability and effectiveness of the genetic algorithm.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, the train scheduling problem is modelled as a blocking parallel-machine job shop scheduling (BPMJSS) problem. In the model, trains, single-track sections and multiple-track sections, respectively, are synonymous with jobs, single machines and parallel machines, and an operation is regarded as the movement/traversal of a train across a section. Due to the lack of buffer space, the real-life case should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold the train until next section on the routing becomes available. Based on literature review and our analysis, it is very hard to find a feasible complete schedule directly for BPMJSS problems. Firstly, a parallel-machine job-shop-scheduling (PMJSS) problem is solved by an improved shifting bottleneck procedure (SBP) algorithm without considering blocking conditions. Inspired by the proposed SBP algorithm, feasibility satisfaction procedure (FSP) algorithm is developed to solve and analyse the BPMJSS problem, by an alternative graph model that is an extension of the classical disjunctive graph models. The proposed algorithms have been implemented and validated using real-world data from Queensland Rail. Sensitivity analysis has been applied by considering train length, upgrading track sections, increasing train speed and changing bottleneck sections. The outcomes show that the proposed methodology would be a very useful tool for the real-life train scheduling problems

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ICU is an integral part of any hospital and is under great load from patient arrivals as well as resource limitations. Scheduling of patients in the ICU is complicated by the two general types; elective surgery and emergency arrivals. This complicated situation is handled by creating a tentative initial schedule and then reacting to uncertain arrivals as they occur. For most hospitals there is little or no flexibility in the number of beds that are available for use now or in the future. We propose an integer programming model to handle a parallel machine reacting system for scheduled and unscheduled arrivals.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Online scheduling is considered in this paper for the Operating Theatre. Robust elective schedules are determined in the offline environment prior to the day of surgery for the online environment. Changes to the offline schedule during project implementation are minimized using an online scheduling model that operates in real-time. The model aims to minimise cancellations of pre-scheduled elective patients whilst also allowing for additional scheduling of emergency cases, time permitting, which may arise during the schedules implementation. Surgical durations are modelled with a lognormal distribution. The single theatre case is solved and the computationally complex multiple theatre case, which is left for future work, is discussed.