Construction teams and construction organisations have their own distinctive cultures. There also exists an infrastructure, both social and contractual, which ensures that these projects within which the teams operate are completed successfully. It is these issues which this research has addressed. The project was instigated by Queensland Department of Main Roads, Public Works and John Holland Group in order to address how they might better implement relationship management (RM) on their construction projects. The project was devised initially in order to facilitate a change in culture which would allow the project to be run in a relational manner and would lead to effective performance in terms of the KPIs that the organisations set for themselves, described as business better than usual. This report describes the project, its outcomes and deliverable and indicates the changes that were made to the project during the research process. Hence, the initial premise of the project and the problem to investigate was the implementation of relational contracting: • throughout a range of projects; • with a focus on client body staff. The additions that were made to the project, and documented in the variations to the project, included two major additional areas of study: • client management and stakeholder management; • a live case study of an alliancing project. The context within which the research was undertaken is important. The research was driven by main roads with their desire to improve their operations by focusing on the relationship between the major project participants (however, stakeholder and client organisation management became an obvious issue as the research progressed, hence the variations). The context was initially focussed on main roads, public works and John Holland group organisations but it became clear very quickly that this was in fact an industry-wide issue and not an issue specific solely to the project participants. Hence, the context within which this research took place can be described as below: The deliverables from the project are a toolkit for determining RM needs in an organisation, a monograph describing the practical implementation of RM and the outline for a RM CPD and Masters course

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Among the difficulties found in the implementation of ISO 14001 systems, resistance to change can always be found. It is mainly a consequence of the hurry to change, loss of focus, concentration of decision making at the level of top management, arbitrary imposition of objectives and results, faulty communication, and the absence of motivational and financial incentive for change.Therefore, the main objective of this paper is to present best practices with respect to the management of organizational change due to the implementation of ISO 14001 norms in two industrial companies in the Midwest region of the State of São Paulo - Brazil. (C) 2008 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The challenges posed by global climate change are motivating the investigation of strategies that can reduce the life cycle greenhouse gas (GHG) emissions of products and processes. While new construction materials and technologies have received significant attention, there has been limited emphasis on understanding how construction processes can be best managed to reduce GHG emissions. Unexpected disruptive events tend to adversely impact construction costs and delay project completion. They also tend to increase project GHG emissions. The objective of this paper is to investigate ways in which project GHG emissions can be reduced by appropriate management of disruptive events. First, an empirical analysis of construction data from a specific highway construction project is used to illustrate the impact of unexpected schedule delays in increasing project GHG emissions. Next, a simulation based methodology is described to assess the effectiveness of alternative project management strategies in reducing GHG emissions. The contribution of this paper is that it explicitly considers projects emissions, in addition to cost and project duration, in developing project management strategies. Practical application of the method discussed in this paper will help construction firms reduce their project emissions through strategic project management, and without significant investment in new technology. In effect, this paper lays the foundation for best practices in construction management that will optimize project cost and duration, while minimizing GHG emissions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Organizational researchers and practitioners are increasingly interested in self-regulatory strategies employees can use at work to sustain or improve their occupational well-being. A recent cross-sectional study on energy management strategies suggested that many work-related strategies (e.g., setting a new goal) are positively related to occupational well-being, whereas many micro-breaks (e.g., listening to music) are negatively related to occupational well-being. We used a diary study design to take a closer look at the effects of these energy management strategies on fatigue and vitality. Based on conservation of resources theory, we hypothesized that both types of energy management strategies negatively predict fatigue and positively predict vitality. Employees (N = 124) responded to a baseline survey and to hourly surveys across one work day (6.7 times on average). Consistent with previous research, between-person differences in the use of work-related strategies were positively associated with between-person differences in vitality. However, results of multilevel analyses of the hourly diary data showed that only micro-breaks negatively predicted fatigue and positively predicted vitality. These findings suggest that taking micro-breaks during the work day may have short-term effects on occupational well-being, whereas using work-related strategies may have long-term effects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the study, the potential allowable cut in the district of Pohjois-Savo - based on the non-industrial private forest landowners' (NIPF) choices of timber management strategies - was clarified. Alternative timber management strategies were generated, and the choices and factors affecting the choices of timber management strategies by NIPF landowners were studied. The choices of timber management strategies were solved by maximizing the utility functions of the NIPF landowners. The parameters of the utility functions were estimated using the Analytic Hierarchy Process (AHP). The level of the potential allowable cut was compared to the cutting budgets based on the 7th and 8th National Forest Inventories (NFI7 and NFI8), to the combining of private forestry plans, and to the realized drain from non-industrial private forests. The potential allowable cut was calculated using the same MELA system as has been used in the calculation of the national cutting budget. The data consisted of the NIPF holdings (from the TASO planning system) that had been inventoried compartmentwise and had forestry plans made during the years 1984-1992. The NIPF landowners' choices of timber management strategies were clarified by a two-phase mail inquiry. The most preferred strategy obtained was "sustainability" (chosen by 62 % of landowners). The second in order of preference was "finance" (17 %) and the third was "saving" (11 %). "No cuttings", and "maximum cuttings" were the least preferred (9 % and 1 %, resp.). The factors promoting the choices of strategies with intensive cuttings were a) "farmer as forest owner" and "owning fields", b) "increase in the size of the forest holding", c) agriculture and forestry orientation in production, d) "decreasing short term stumpage earning expectations", e) "increasing intensity of future cuttings", and f) "choice of forest taxation system based on site productivity". The potential allowable cut defined in the study was 20 % higher than the average of the realized drain during the years 1988-1993, which in turn, was at the same level as the cutting budget based on the combining of forestry plans in eastern Finland. Respectively, the potential allowable cut defined in the study was 12 % lower than the NFI8-based greatest sustained allowable cut for the 1990s. Using the method presented in this study, timber management strategies can be clarified for non-industrial private forest landowners in different parts of Finland. Based on the choices of timber managemet strategies, regular cutting budgets can be calculated more realistically than before.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The factors affecting the non-industrial, private forest landowners' (hereafter referred to using the acronym NIPF) strategic decisions in management planning are studied. A genetic algorithm is used to induce a set of rules predicting potential cut of the landowners' choices of preferred timber management strategies. The rules are based on variables describing the characteristics of the landowners and their forest holdings. The predictive ability of a genetic algorithm is compared to linear regression analysis using identical data sets. The data are cross-validated seven times applying both genetic algorithm and regression analyses in order to examine the data-sensitivity and robustness of the generated models. The optimal rule set derived from genetic algorithm analyses included the following variables: mean initial volume, landowner's positive price expectations for the next eight years, landowner being classified as farmer, and preference for the recreational use of forest property. When tested with previously unseen test data, the optimal rule set resulted in a relative root mean square error of 0.40. In the regression analyses, the optimal regression equation consisted of the following variables: mean initial volume, proportion of forestry income, intention to cut extensively in future, and positive price expectations for the next two years. The R2 of the optimal regression equation was 0.34 and the relative root mean square error obtained from the test data was 0.38. In both models, mean initial volume and positive stumpage price expectations were entered as significant predictors of potential cut of preferred timber management strategy. When tested with the complete data set of 201 observations, both the optimal rule set and the optimal regression model achieved the same level of accuracy.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Low phosphorus (P) in acid sandy soils of the West African Sudano-Sahelian zone is a major limitation to crop growth. To compare treatment effects on total dry matter (TDM) of crops and plant available P (P-Bray and isotopically exchangeable P), field experiments were carried out for 2 years at four sites where annual rainfall ranged from 560 to 850 mm and topsoil pH varied between 4.2 and 5.6. Main treatments were: (i) crop residue (CR) mulch at 500 and 2000 kg ha^-1, (ii) eight different rates and sources of P and (iii) cereal/legume rotations including millet (Pennisetum glaucum L.), sorhum [Sorghum bicolor (L.) Moench], cowpea (Vigna unguiculata Walp.) and groundnut (Arachis hypogaea L.). For the two Sahelian sites with large CR-induced differences in TDM, mulching did not modify significantly the soils' buffering capacity for phosphate ions but led to large increases in the intensity factor (C_p) and quantity of directly available soil P (E_1min). In the wetter Sudanian zone lacking effects of CR mulching on TDM mirrored a decline of E_1min with CR. Broadcast application of soluble single superphosphate (SSP) at 13 kg P ha^-1 led to large increases in C_p and quantity of E_1min at all sites which translated in respective TDM increases. The high agronomic efficiency of SSP placement (4 kg P ha^-1) across sites could be explained by consistent increases in the quantity factor which confirms the power of the isotopic exchange method in explaining management effects on crop growth across the region.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Mount Antero/White area is a popular prospecting area. Recent expansions in the recreation economy is drawing more visitors to the area. Consequently, visitors may be placing unsustainable pressures on the landscape. In order to help rectify this, the legal, ecological, geologic, aesthetic, recreational, historic, social, and economic character of the Antero/White area has been identified. Four feasible management alternatives have also been recognized. They are a) take no new management actions, b) prohibit motorized activities in the area, c) develop a mineralogical park, and d) a combination of options b and c. Option C has been defended, as it best balances the desires of area users with the underlying ecological and geological character of the area.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Frequently, population ecology of marine organisms uses a descriptive approach in which their sizes and densities are plotted over time. This approach has limited usefulness for design strategies in management or modelling different scenarios. Population projection matrix models are among the most widely used tools in ecology. Unfortunately, for the majority of pelagic marine organisms, it is difficult to mark individuals and follow them over time to determine their vital rates and built a population projection matrix model. Nevertheless, it is possible to get time-series data to calculate size structure and densities of each size, in order to determine the matrix parameters. This approach is known as a “demographic inverse problem” and it is based on quadratic programming methods, but it has rarely been used on aquatic organisms. We used unpublished field data of a population of cubomedusae Carybdea marsupialis to construct a population projection matrix model and compare two different management strategies to lower population to values before year 2008 when there was no significant interaction with bathers. Those strategies were by direct removal of medusae and by reducing prey. Our results showed that removal of jellyfish from all size classes was more effective than removing only juveniles or adults. When reducing prey, the highest efficiency to lower the C. marsupialis population occurred when prey depletion affected prey of all medusae sizes. Our model fit well with the field data and may serve to design an efficient management strategy or build hypothetical scenarios such as removal of individuals or reducing prey. TThis This sdfsdshis method is applicable to other marine or terrestrial species, for which density and population structure over time are available.